Loading…

Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)

West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that ha...

Full description

Saved in:
Bibliographic Details
Published in:E3S web of conferences 2023-01, Vol.464, p.11008
Main Authors: Herman, Hazmal, Irawan, Bayu Budi, Wijayanti, Surya Maiyora, Daoed, Darwizal
Format: Article
Language:English
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3
container_end_page
container_issue
container_start_page 11008
container_title E3S web of conferences
container_volume 464
creator Herman, Hazmal
Irawan, Bayu Budi
Wijayanti, Surya Maiyora
Daoed, Darwizal
description West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm.
doi_str_mv 10.1051/e3sconf/202346411008
format article
fullrecord <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_d651535fad3b45dfb942b72978234578</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_d651535fad3b45dfb942b72978234578</doaj_id><sourcerecordid>oai_doaj_org_article_d651535fad3b45dfb942b72978234578</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3</originalsourceid><addsrcrecordid>eNpNkEtLw0AYRQdRsNT-Axez1EXsvJJM3EmpWigoVHEZvsyjTE1mykyy6L832iJd3cuFexYHoVtKHijJ6dzwpIK3c0YYF4WglBB5gSaMFWVGmWCXZ_0azVLaEUIoy6UgYoLUsjNxa7w64NSHPW7BG6xNcluPg8ceehc8tDgG0Nh5_GVSjzdDB30EfKcgmfE36MMjfgcfInSAKd643vkdDHgNg_u-v0FXFtpkZqecos_n5cfiNVu_vawWT-tMMVbKzDSNsbnRhnFViIpbUGNyAaYUyqqKVFYIJTRYLi01VhJV8sY2lSS2pLLhU7Q6cnWAXb2ProN4qAO4-m8IcVtD7J1qTa2LnOY8t6B5I3I9QgRrSlaVcpSYl3JkiSNLxZBSNPafR0n9670-ea_PvfMfH2x3pg</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</title><source>Publicly Available Content Database</source><creator>Herman, Hazmal ; Irawan, Bayu Budi ; Wijayanti, Surya Maiyora ; Daoed, Darwizal</creator><contributor>Safuan A. Rashid, A. ; Fauzan ; Subbarayan, S. ; Hakam, A.</contributor><creatorcontrib>Herman, Hazmal ; Irawan, Bayu Budi ; Wijayanti, Surya Maiyora ; Daoed, Darwizal ; Safuan A. Rashid, A. ; Fauzan ; Subbarayan, S. ; Hakam, A.</creatorcontrib><description>West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm.</description><identifier>ISSN: 2267-1242</identifier><identifier>EISSN: 2267-1242</identifier><identifier>DOI: 10.1051/e3sconf/202346411008</identifier><language>eng</language><publisher>EDP Sciences</publisher><ispartof>E3S web of conferences, 2023-01, Vol.464, p.11008</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><contributor>Safuan A. Rashid, A.</contributor><contributor>Fauzan</contributor><contributor>Subbarayan, S.</contributor><contributor>Hakam, A.</contributor><creatorcontrib>Herman, Hazmal</creatorcontrib><creatorcontrib>Irawan, Bayu Budi</creatorcontrib><creatorcontrib>Wijayanti, Surya Maiyora</creatorcontrib><creatorcontrib>Daoed, Darwizal</creatorcontrib><title>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</title><title>E3S web of conferences</title><description>West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm.</description><issn>2267-1242</issn><issn>2267-1242</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2023</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpNkEtLw0AYRQdRsNT-Axez1EXsvJJM3EmpWigoVHEZvsyjTE1mykyy6L832iJd3cuFexYHoVtKHijJ6dzwpIK3c0YYF4WglBB5gSaMFWVGmWCXZ_0azVLaEUIoy6UgYoLUsjNxa7w64NSHPW7BG6xNcluPg8ceehc8tDgG0Nh5_GVSjzdDB30EfKcgmfE36MMjfgcfInSAKd643vkdDHgNg_u-v0FXFtpkZqecos_n5cfiNVu_vawWT-tMMVbKzDSNsbnRhnFViIpbUGNyAaYUyqqKVFYIJTRYLi01VhJV8sY2lSS2pLLhU7Q6cnWAXb2ProN4qAO4-m8IcVtD7J1qTa2LnOY8t6B5I3I9QgRrSlaVcpSYl3JkiSNLxZBSNPafR0n9670-ea_PvfMfH2x3pg</recordid><startdate>20230101</startdate><enddate>20230101</enddate><creator>Herman, Hazmal</creator><creator>Irawan, Bayu Budi</creator><creator>Wijayanti, Surya Maiyora</creator><creator>Daoed, Darwizal</creator><general>EDP Sciences</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope></search><sort><creationdate>20230101</creationdate><title>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</title><author>Herman, Hazmal ; Irawan, Bayu Budi ; Wijayanti, Surya Maiyora ; Daoed, Darwizal</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2023</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Herman, Hazmal</creatorcontrib><creatorcontrib>Irawan, Bayu Budi</creatorcontrib><creatorcontrib>Wijayanti, Surya Maiyora</creatorcontrib><creatorcontrib>Daoed, Darwizal</creatorcontrib><collection>CrossRef</collection><collection>Open Access: DOAJ - Directory of Open Access Journals</collection><jtitle>E3S web of conferences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Herman, Hazmal</au><au>Irawan, Bayu Budi</au><au>Wijayanti, Surya Maiyora</au><au>Daoed, Darwizal</au><au>Safuan A. Rashid, A.</au><au>Fauzan</au><au>Subbarayan, S.</au><au>Hakam, A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</atitle><jtitle>E3S web of conferences</jtitle><date>2023-01-01</date><risdate>2023</risdate><volume>464</volume><spage>11008</spage><pages>11008-</pages><issn>2267-1242</issn><eissn>2267-1242</eissn><abstract>West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm.</abstract><pub>EDP Sciences</pub><doi>10.1051/e3sconf/202346411008</doi><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2267-1242
ispartof E3S web of conferences, 2023-01, Vol.464, p.11008
issn 2267-1242
2267-1242
language eng
recordid cdi_doaj_primary_oai_doaj_org_article_d651535fad3b45dfb942b72978234578
source Publicly Available Content Database
title Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T16%3A12%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Emergency%20stop%20lane%20design%20on%20national%20road%20in%20West%20Sumatra%20(case%20study:%20Panorama%201%20Sitinjau%20Lauik)&rft.jtitle=E3S%20web%20of%20conferences&rft.au=Herman,%20Hazmal&rft.date=2023-01-01&rft.volume=464&rft.spage=11008&rft.pages=11008-&rft.issn=2267-1242&rft.eissn=2267-1242&rft_id=info:doi/10.1051/e3sconf/202346411008&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_d651535fad3b45dfb942b72978234578%3C/doaj_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true