Loading…
Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)
West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that ha...
Saved in:
Published in: | E3S web of conferences 2023-01, Vol.464, p.11008 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | cdi_FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3 |
container_end_page | |
container_issue | |
container_start_page | 11008 |
container_title | E3S web of conferences |
container_volume | 464 |
creator | Herman, Hazmal Irawan, Bayu Budi Wijayanti, Surya Maiyora Daoed, Darwizal |
description | West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm. |
doi_str_mv | 10.1051/e3sconf/202346411008 |
format | article |
fullrecord | <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_d651535fad3b45dfb942b72978234578</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_d651535fad3b45dfb942b72978234578</doaj_id><sourcerecordid>oai_doaj_org_article_d651535fad3b45dfb942b72978234578</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3</originalsourceid><addsrcrecordid>eNpNkEtLw0AYRQdRsNT-Axez1EXsvJJM3EmpWigoVHEZvsyjTE1mykyy6L832iJd3cuFexYHoVtKHijJ6dzwpIK3c0YYF4WglBB5gSaMFWVGmWCXZ_0azVLaEUIoy6UgYoLUsjNxa7w64NSHPW7BG6xNcluPg8ceehc8tDgG0Nh5_GVSjzdDB30EfKcgmfE36MMjfgcfInSAKd643vkdDHgNg_u-v0FXFtpkZqecos_n5cfiNVu_vawWT-tMMVbKzDSNsbnRhnFViIpbUGNyAaYUyqqKVFYIJTRYLi01VhJV8sY2lSS2pLLhU7Q6cnWAXb2ProN4qAO4-m8IcVtD7J1qTa2LnOY8t6B5I3I9QgRrSlaVcpSYl3JkiSNLxZBSNPafR0n9670-ea_PvfMfH2x3pg</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</title><source>Publicly Available Content Database</source><creator>Herman, Hazmal ; Irawan, Bayu Budi ; Wijayanti, Surya Maiyora ; Daoed, Darwizal</creator><contributor>Safuan A. Rashid, A. ; Fauzan ; Subbarayan, S. ; Hakam, A.</contributor><creatorcontrib>Herman, Hazmal ; Irawan, Bayu Budi ; Wijayanti, Surya Maiyora ; Daoed, Darwizal ; Safuan A. Rashid, A. ; Fauzan ; Subbarayan, S. ; Hakam, A.</creatorcontrib><description>West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm.</description><identifier>ISSN: 2267-1242</identifier><identifier>EISSN: 2267-1242</identifier><identifier>DOI: 10.1051/e3sconf/202346411008</identifier><language>eng</language><publisher>EDP Sciences</publisher><ispartof>E3S web of conferences, 2023-01, Vol.464, p.11008</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><contributor>Safuan A. Rashid, A.</contributor><contributor>Fauzan</contributor><contributor>Subbarayan, S.</contributor><contributor>Hakam, A.</contributor><creatorcontrib>Herman, Hazmal</creatorcontrib><creatorcontrib>Irawan, Bayu Budi</creatorcontrib><creatorcontrib>Wijayanti, Surya Maiyora</creatorcontrib><creatorcontrib>Daoed, Darwizal</creatorcontrib><title>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</title><title>E3S web of conferences</title><description>West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm.</description><issn>2267-1242</issn><issn>2267-1242</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2023</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpNkEtLw0AYRQdRsNT-Axez1EXsvJJM3EmpWigoVHEZvsyjTE1mykyy6L832iJd3cuFexYHoVtKHijJ6dzwpIK3c0YYF4WglBB5gSaMFWVGmWCXZ_0azVLaEUIoy6UgYoLUsjNxa7w64NSHPW7BG6xNcluPg8ceehc8tDgG0Nh5_GVSjzdDB30EfKcgmfE36MMjfgcfInSAKd643vkdDHgNg_u-v0FXFtpkZqecos_n5cfiNVu_vawWT-tMMVbKzDSNsbnRhnFViIpbUGNyAaYUyqqKVFYIJTRYLi01VhJV8sY2lSS2pLLhU7Q6cnWAXb2ProN4qAO4-m8IcVtD7J1qTa2LnOY8t6B5I3I9QgRrSlaVcpSYl3JkiSNLxZBSNPafR0n9670-ea_PvfMfH2x3pg</recordid><startdate>20230101</startdate><enddate>20230101</enddate><creator>Herman, Hazmal</creator><creator>Irawan, Bayu Budi</creator><creator>Wijayanti, Surya Maiyora</creator><creator>Daoed, Darwizal</creator><general>EDP Sciences</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope></search><sort><creationdate>20230101</creationdate><title>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</title><author>Herman, Hazmal ; Irawan, Bayu Budi ; Wijayanti, Surya Maiyora ; Daoed, Darwizal</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2023</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Herman, Hazmal</creatorcontrib><creatorcontrib>Irawan, Bayu Budi</creatorcontrib><creatorcontrib>Wijayanti, Surya Maiyora</creatorcontrib><creatorcontrib>Daoed, Darwizal</creatorcontrib><collection>CrossRef</collection><collection>Open Access: DOAJ - Directory of Open Access Journals</collection><jtitle>E3S web of conferences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Herman, Hazmal</au><au>Irawan, Bayu Budi</au><au>Wijayanti, Surya Maiyora</au><au>Daoed, Darwizal</au><au>Safuan A. Rashid, A.</au><au>Fauzan</au><au>Subbarayan, S.</au><au>Hakam, A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik)</atitle><jtitle>E3S web of conferences</jtitle><date>2023-01-01</date><risdate>2023</risdate><volume>464</volume><spage>11008</spage><pages>11008-</pages><issn>2267-1242</issn><eissn>2267-1242</eissn><abstract>West Sumatra Province has geographical conditions consisting of lowlands and highlands. These geographical conditions certainly affect the geometric conditions of the road, especially on the Panorama 1 Sitinjau Lauik National Road Section. One of the factors that cause accidents is a vehicle that has failed brakes. This study aims to calculate the length of the emergency stop lane; plan the structure of the building; and plan a modeling design. The results of the Emergency Stop Route Design research showed that the overall dimensions were 240 m. Preliminary design results are as follows: Beam (600 mm width and 1100 mm height), Amount of flexural reinforcement: Compression reinforcement 8 D – 25 mm; Tensile reinforcement 4 D – 25 mm; Amount of shear reinforcement: Area of support 2Ø13-100 mm, Area of field 2Ø13-150 mm. Cross beam width 300 mm and height 600 mm. Amount of flexural reinforcement: compression reinforcement 3 D 16 mm; Tensile reinforcement 3 D 16 mm. Number of shear reinforcement: Support area 2Ø13-100 mm and field area 2Ø13-150 mm. For longitudinal reinforcement, the diameter is ø10 – 200 mm, the tie reinforcement has a diameter of ø10 – 200 mm and the vertical reinforcement has a diameter of ø16 – 150 mm.</abstract><pub>EDP Sciences</pub><doi>10.1051/e3sconf/202346411008</doi><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2267-1242 |
ispartof | E3S web of conferences, 2023-01, Vol.464, p.11008 |
issn | 2267-1242 2267-1242 |
language | eng |
recordid | cdi_doaj_primary_oai_doaj_org_article_d651535fad3b45dfb942b72978234578 |
source | Publicly Available Content Database |
title | Emergency stop lane design on national road in West Sumatra (case study: Panorama 1 Sitinjau Lauik) |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T16%3A12%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Emergency%20stop%20lane%20design%20on%20national%20road%20in%20West%20Sumatra%20(case%20study:%20Panorama%201%20Sitinjau%20Lauik)&rft.jtitle=E3S%20web%20of%20conferences&rft.au=Herman,%20Hazmal&rft.date=2023-01-01&rft.volume=464&rft.spage=11008&rft.pages=11008-&rft.issn=2267-1242&rft.eissn=2267-1242&rft_id=info:doi/10.1051/e3sconf/202346411008&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_d651535fad3b45dfb942b72978234578%3C/doaj_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c2278-ebbef5ede23c6493facc6434ae74cfc909f44c4daf38f1ef80c73bfb980f718b3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |