Loading…

Ensuring radiation safety during dismantling, transportation and long-term storage of the SM-3 research reactor core

Described shortly here is a procedure of demounting, removal, transport and long-term storage of the SM-3 core, based on the previous experience of reactor refurbishment undertaken in 1991. Prior to performing refurbishment, computations and calculated data analysis were performed to prove radiation...

Full description

Saved in:
Bibliographic Details
Published in:Nuclear energy and technology 2024-03, Vol.10 (1), p.55-62
Main Authors: Yusupov, Anton N., Mikhailov, Pavel A., Kizin, Viktor D., Gromov, Mikhail O., Kusovnikov, Aleksei V., Avdonin, Vasilii V.
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Described shortly here is a procedure of demounting, removal, transport and long-term storage of the SM-3 core, based on the previous experience of reactor refurbishment undertaken in 1991. Prior to performing refurbishment, computations and calculated data analysis were performed to prove radiation safety of this work, which included estimation of the activity level for activation products in the structural materials of the nuclear research reactor core and the radiation conditions at different stages of its handling. As evidenced by the calculated data, the activity of the main dose-forming radionuclide 60 Co attains equilibrium in about 12 years of radiation exposure. Taking into account the fact that the time period between two refurbishments was longer than 12 years, the calculated values of the equivalent dose rate were normalized to the radiation monitoring data obtained during the previous refurbishment, taking into account the calculated activity of 60 Co radionuclide. The normalization made it possible to confirm reliability of estimates. The obtained activity data of activation products and taking into account the time spent during the SM-3 refurbishment in 1991, the radiation impact on personnel was estimated. Calculated values of the anticipated effective radiation exposure doses to the personnel engaged in the refurbishment revealed that the main limits of the personnel radiation exposure established in accordance with NRB-99/2009 were not exceeded. Comparison of the results of calculating the equivalent dose rate with the results of radiation monitoring at various points allowed us to establish that during the calculation and analytical justification of the radiation safety of work, the assessment of reflected radiation was significantly underestimated. But the radiation monitoring data, personal radiation monitoring, as well as recorded data of automatic radiation monitoring system show that all work was performed in compliance with the requirements of regulatory documents in the field of radiation safety.
ISSN:2452-3038
2452-3038
DOI:10.3897/nucet.10.123054