Loading…
Geospatial Virtual Reality for Cyberlearning in the Field of Topographic Surveying: Moving Towards a Cost-Effective Mobile Solution
In spite of the tremendous success in artificial intelligence technology and a high level of automation in geospatial data obtaining processes, there is still a need for topographical field data collection by professional surveyors. Understanding terrain topology and topography is a cognitive skill...
Saved in:
Published in: | ISPRS international journal of geo-information 2020-07, Vol.9 (7), p.433 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In spite of the tremendous success in artificial intelligence technology and a high level of automation in geospatial data obtaining processes, there is still a need for topographical field data collection by professional surveyors. Understanding terrain topology and topography is a cognitive skill set that has to be demonstrated by geospatial Subject Matter Experts (SME) for the productive work in the topographic surveying field. For training of the mentioned above skillset, one has to be exposed to the theory and must also practice with surveying instruments in field conditions. The challenge of any surveying/geospatial engineering workforce training is to expose students to field conditions which might be limited due to equipment expenses and meteorological conditions that prevent good data collection. To meet this challenge, the Integrated Geospatial Technology research group is working on a geospatial virtual reality (VR) project which encompasses the following components: (a) immersive visualization of terrain; (b) virtual total station instrument; (c) virtual surveyor with reflector installed on the virtual rod. The application scenario of the technology we are working with has the following stages: (1) student is installing total station on the optimal location; (2) students move virtual surveyor on the sampling points they consider to be important (3) contours are generated and displayed in 3D being superimposed on 3D terrain; (4) accuracy of terrain modeling is observable and measurable by comparing the sampling model with initial one. |
---|---|
ISSN: | 2220-9964 2220-9964 |
DOI: | 10.3390/ijgi9070433 |