Multi-mode resource constrained project scheduling problem: a survey of variants, extensions, and methods
The Multi-Mode Resource Constrained Project Scheduling Problem (MMRCPSP) is one of the most important problems in project scheduling context. The MMRCPSP consists of activities to be scheduled subject to precedence and resource constraints. The effort needed in order to accomplish activities in the...
Saved in:
Published in: | International journal of industrial engineering & production research 2018-09, Vol.29 (3), p.293-320 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 320 |
container_issue | 3 |
container_start_page | 293 |
container_title | International journal of industrial engineering & production research |
container_volume | 29 |
creator | Siamak Noori Kaveh Taghizadeh |
description | The Multi-Mode Resource Constrained Project Scheduling Problem (MMRCPSP) is one of the most important problems in project scheduling context. The MMRCPSP consists of activities to be scheduled subject to precedence and resource constraints. The effort needed in order to accomplish activities in the MMRCPSP is a discrete function of job performing modes. However, MMRCPSP is a basic model with a rather too restrictive assumptions to be applied practically. Therefore, there are many extensions over basic MMRCPSP model in terms of objective functions, resource constraints, and solving procedures. This research is aiming at fulfilling tow ambitions. First, to collect researches related MMRCPSP and to classify them based on a framework consisting of six distinct classes. Second, to indicate current trends and potential areas of future research. In order to fulfill the second goal a new mathematical method is proposed and applied which identify recent trends and gaps in a systematic manner. |
doi_str_mv | 10.22068/ijiepr.29.3.293 |
format | article |
fullrecord | <record><control><sourceid>doaj</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_ea80d7f52af34c9cb7d68d0ff4bcf07d</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_ea80d7f52af34c9cb7d68d0ff4bcf07d</doaj_id><sourcerecordid>oai_doaj_org_article_ea80d7f52af34c9cb7d68d0ff4bcf07d</sourcerecordid><originalsourceid>FETCH-LOGICAL-d136t-55076a7c77519bf572ae936aef98e0ed05a5cc2ae09791cdf23b9634b407b8ac3</originalsourceid><addsrcrecordid>eNotjMtOwzAURCMEElXpnqU_oClOHMc2O1TxqFTEBiR20Y193TpK48p2Kvr3hMcsZkZncbLstqCrsqS1vHOdw2NYlWrFpmIX2axkFc9ZzT4vp0-pzCsp1XW2iLGjU4RknMtZ5l7HPrn84A2SgNGPQSPRfogpgBvQkGPwHepEot6jGXs37H5Q2-PhngCJYzjhmXhLThAcDCkuCX4lHKKbHEsCgyEHTHtv4k12ZaGPuPjfefbx9Pi-fsm3b8-b9cM2NwWrU845FTUILQQvVGu5KAEVqwGtkkjRUA5c6wlSJVShjS1Zq2pWtRUVrQTN5tnmz2s8dM0xuAOEc-PBNb_Ah10DITndY4MgqRGWl2BZpZVuhamlodZWrbZUGPYNY9JrOQ</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Multi-mode resource constrained project scheduling problem: a survey of variants, extensions, and methods</title><source>EZB Electronic Journals Library</source><creator>Siamak Noori ; Kaveh Taghizadeh</creator><creatorcontrib>Siamak Noori ; Kaveh Taghizadeh</creatorcontrib><description>The Multi-Mode Resource Constrained Project Scheduling Problem (MMRCPSP) is one of the most important problems in project scheduling context. The MMRCPSP consists of activities to be scheduled subject to precedence and resource constraints. The effort needed in order to accomplish activities in the MMRCPSP is a discrete function of job performing modes. However, MMRCPSP is a basic model with a rather too restrictive assumptions to be applied practically. Therefore, there are many extensions over basic MMRCPSP model in terms of objective functions, resource constraints, and solving procedures. This research is aiming at fulfilling tow ambitions. First, to collect researches related MMRCPSP and to classify them based on a framework consisting of six distinct classes. Second, to indicate current trends and potential areas of future research. In order to fulfill the second goal a new mathematical method is proposed and applied which identify recent trends and gaps in a systematic manner.</description><identifier>ISSN: 2008-4889</identifier><identifier>EISSN: 2345-363X</identifier><identifier>DOI: 10.22068/ijiepr.29.3.293</identifier><language>eng</language><publisher>Iran University of Science & Technology</publisher><subject>mode identity ; multi-mode resource constrained project scheduling problem ; project scheduling ; project time-cost-quality trade-off</subject><ispartof>International journal of industrial engineering & production research, 2018-09, Vol.29 (3), p.293-320</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27915,27916</link.rule.ids></links><search><creatorcontrib>Siamak Noori</creatorcontrib><creatorcontrib>Kaveh Taghizadeh</creatorcontrib><title>Multi-mode resource constrained project scheduling problem: a survey of variants, extensions, and methods</title><title>International journal of industrial engineering & production research</title><description>The Multi-Mode Resource Constrained Project Scheduling Problem (MMRCPSP) is one of the most important problems in project scheduling context. The MMRCPSP consists of activities to be scheduled subject to precedence and resource constraints. The effort needed in order to accomplish activities in the MMRCPSP is a discrete function of job performing modes. However, MMRCPSP is a basic model with a rather too restrictive assumptions to be applied practically. Therefore, there are many extensions over basic MMRCPSP model in terms of objective functions, resource constraints, and solving procedures. This research is aiming at fulfilling tow ambitions. First, to collect researches related MMRCPSP and to classify them based on a framework consisting of six distinct classes. Second, to indicate current trends and potential areas of future research. In order to fulfill the second goal a new mathematical method is proposed and applied which identify recent trends and gaps in a systematic manner.</description><subject>mode identity</subject><subject>multi-mode resource constrained project scheduling problem</subject><subject>project scheduling</subject><subject>project time-cost-quality trade-off</subject><issn>2008-4889</issn><issn>2345-363X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNotjMtOwzAURCMEElXpnqU_oClOHMc2O1TxqFTEBiR20Y193TpK48p2Kvr3hMcsZkZncbLstqCrsqS1vHOdw2NYlWrFpmIX2axkFc9ZzT4vp0-pzCsp1XW2iLGjU4RknMtZ5l7HPrn84A2SgNGPQSPRfogpgBvQkGPwHepEot6jGXs37H5Q2-PhngCJYzjhmXhLThAcDCkuCX4lHKKbHEsCgyEHTHtv4k12ZaGPuPjfefbx9Pi-fsm3b8-b9cM2NwWrU845FTUILQQvVGu5KAEVqwGtkkjRUA5c6wlSJVShjS1Zq2pWtRUVrQTN5tnmz2s8dM0xuAOEc-PBNb_Ah10DITndY4MgqRGWl2BZpZVuhamlodZWrbZUGPYNY9JrOQ</recordid><startdate>20180901</startdate><enddate>20180901</enddate><creator>Siamak Noori</creator><creator>Kaveh Taghizadeh</creator><general>Iran University of Science & Technology</general><scope>DOA</scope></search><sort><creationdate>20180901</creationdate><title>Multi-mode resource constrained project scheduling problem: a survey of variants, extensions, and methods</title><author>Siamak Noori ; Kaveh Taghizadeh</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-d136t-55076a7c77519bf572ae936aef98e0ed05a5cc2ae09791cdf23b9634b407b8ac3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>mode identity</topic><topic>multi-mode resource constrained project scheduling problem</topic><topic>project scheduling</topic><topic>project time-cost-quality trade-off</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Siamak Noori</creatorcontrib><creatorcontrib>Kaveh Taghizadeh</creatorcontrib><collection>DOAJ Directory of Open Access Journals</collection><jtitle>International journal of industrial engineering & production research</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Siamak Noori</au><au>Kaveh Taghizadeh</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Multi-mode resource constrained project scheduling problem: a survey of variants, extensions, and methods</atitle><jtitle>International journal of industrial engineering & production research</jtitle><date>2018-09-01</date><risdate>2018</risdate><volume>29</volume><issue>3</issue><spage>293</spage><epage>320</epage><pages>293-320</pages><issn>2008-4889</issn><eissn>2345-363X</eissn><abstract>The Multi-Mode Resource Constrained Project Scheduling Problem (MMRCPSP) is one of the most important problems in project scheduling context. The MMRCPSP consists of activities to be scheduled subject to precedence and resource constraints. The effort needed in order to accomplish activities in the MMRCPSP is a discrete function of job performing modes. However, MMRCPSP is a basic model with a rather too restrictive assumptions to be applied practically. Therefore, there are many extensions over basic MMRCPSP model in terms of objective functions, resource constraints, and solving procedures. This research is aiming at fulfilling tow ambitions. First, to collect researches related MMRCPSP and to classify them based on a framework consisting of six distinct classes. Second, to indicate current trends and potential areas of future research. In order to fulfill the second goal a new mathematical method is proposed and applied which identify recent trends and gaps in a systematic manner.</abstract><pub>Iran University of Science & Technology</pub><doi>10.22068/ijiepr.29.3.293</doi><tpages>28</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2008-4889 |
ispartof | International journal of industrial engineering & production research, 2018-09, Vol.29 (3), p.293-320 |
issn | 2008-4889 2345-363X |
language | eng |
recordid | cdi_doaj_primary_oai_doaj_org_article_ea80d7f52af34c9cb7d68d0ff4bcf07d |
source | EZB Electronic Journals Library |
subjects | mode identity multi-mode resource constrained project scheduling problem project scheduling project time-cost-quality trade-off |
title | Multi-mode resource constrained project scheduling problem: a survey of variants, extensions, and methods |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T22%3A59%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Multi-mode%20resource%20constrained%20project%20scheduling%20problem:%20a%20survey%20of%20variants,%20extensions,%20and%20methods&rft.jtitle=International%20journal%20of%20industrial%20engineering%20&%20production%20research&rft.au=Siamak%20Noori&rft.date=2018-09-01&rft.volume=29&rft.issue=3&rft.spage=293&rft.epage=320&rft.pages=293-320&rft.issn=2008-4889&rft.eissn=2345-363X&rft_id=info:doi/10.22068/ijiepr.29.3.293&rft_dat=%3Cdoaj%3Eoai_doaj_org_article_ea80d7f52af34c9cb7d68d0ff4bcf07d%3C/doaj%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-d136t-55076a7c77519bf572ae936aef98e0ed05a5cc2ae09791cdf23b9634b407b8ac3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |