Loading…

Calculation of electrical loads for decentralized power supply systems and the choice of power gas piston installations which use electrochemical energy storage

In autonomous electric power supply systems of remote areas of the country where there are no centralized electric power supply, diesel generator units (DGU), and gas piston installations (GPI) is used as a source of electrical power. Selection of their nominal power determined load value, for which...

Full description

Saved in:
Bibliographic Details
Published in:E3S web of conferences 2019-01, Vol.124, p.5068
Main Authors: Fedotov, A, Misbakhov, R, Chernova, N, Bakhteev, K, Akhmetshin, A
Format: Article
Language:English
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In autonomous electric power supply systems of remote areas of the country where there are no centralized electric power supply, diesel generator units (DGU), and gas piston installations (GPI) is used as a source of electrical power. Selection of their nominal power determined load value, for which the preliminary calculation using the standard values. Researches of electric power profiles for apartment and public buildings of the Republic of Tatarstan showed a significant difference from the current regulatory values. At present, the regions are granted the right to independently set specific loads for such objects. The article proposes a method for selecting the power of autonomous power plants for actual loads for urban and rural settlements.
ISSN:2267-1242
2267-1242
DOI:10.1051/e3sconf/201912405068