Loading…
Impact of operation on the geometric parameters of the track in ballastless track transition area
The paper deals with the methodology and results of diagnostics in test sections near the tunnel portals of newly built tunnel Turecký vrch on modernized line Nové Mesto nad Váhom – Púchov. Based on the diagnostics results, transition areas are problematic sections of the construction. Transition ar...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The paper deals with the methodology and results of diagnostics in test sections near the tunnel portals of newly built tunnel Turecký vrch on modernized line Nové Mesto nad Váhom – Púchov. Based on the diagnostics results, transition areas are problematic sections of the construction. Transition areas were subjected to detailed analysis and based on trends of the development of geometric quantities are determined trends which predict time of needed maintenance. In order to optimize existing transition areas the design of transition in ANSYS software was modelled and problematic spots of construction were defined. |
---|---|
ISSN: | 2261-236X 2274-7214 2261-236X |
DOI: | 10.1051/matecconf/201710700019 |