Loading…
Evaluation of long-term operation of combined system for heating the building and preparation of domestic hot water
The paper presents, the results of research on the operation and energy efficiency of a 186 kW gas-fired condensing boiler operating in a hybrid heat source system. The boiler co-operates with an 81.1 kW (electric) brine-to-water compressor heat pump, a 27.4 kW air-to-water heat pump and 6 flat sola...
Saved in:
Published in: | E3S web of conferences 2018-01, Vol.46, p.18 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The paper presents, the results of research on the operation and energy efficiency of a 186 kW gas-fired condensing boiler operating in a hybrid heat source system. The boiler co-operates with an 81.1 kW (electric) brine-to-water compressor heat pump, a 27.4 kW air-to-water heat pump and 6 flat solar collectors. A local, built-in, hybrid heat source is located in a public building and is intended to satisfy the building needs. The study was conducted over a period of 1 year - from 1 September 2014 to 31 August 2015. The gas-fired boiler operates in the heating buffer system all year round. The boiler performance is characterized both in the winter and in the summer season, in terms of the amount of heat produced and the heating power. The calculations results of the heat generation efficiency obtained in the measuring period are also presented |
---|---|
ISSN: | 2267-1242 2267-1242 |
DOI: | 10.1051/e3sconf/20184600018 |