Loading…
A MULTI-STAGE OPTIMISATION METHOD FOR THE MANAGEMENT OF AN ON-DEMAND FIXTURE MANUFACTURING CELL FOR MASS CUSTOMISATION PRODUCTION SYSTEMS
The implementation of reconfigurable fixtures is a major facilitator of mass customisation. Traditional scheduling techniques do not consider reconfigurable fixtures comprehensively. This paper describes a multi-stage optimisation method that manages the recirculation of reconfigurable fixtures in a...
Saved in:
Published in: | South African journal of industrial engineering 2018-08, Vol.29 (2), p.52-64 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The implementation of reconfigurable fixtures is a major facilitator of mass customisation. Traditional scheduling techniques do not consider reconfigurable fixtures comprehensively. This paper describes a multi-stage optimisation method that manages the recirculation of reconfigurable fixtures in a mass customisation production system. The method was based on an on-demand fixture manufacturing cell that served a part processing cell. The method consists of three stages: using established techniques such as k-means clustering and hierarchical clustering; and a novel mixed integer linear programming (MILP) model to optimise operation sequences. Minimisation of total idle time (and thus makespan) was used as the measure of performance. |
---|---|
ISSN: | 2224-7890 1012-277X 2224-7890 |
DOI: | 10.7166/29-2-1824 |