UH-1 Test Bed Program. Volume 1

The UH-1H helicopter test bed program was accomplished at the US Army Aeronautical Depot Maintenance Center (ARADMAC), Corpus Christi, Texas, during the period 4 October 1970 through 17 December 1971. The program objective was to determine the capability of state-of-the-art hardware to automatically...

Full description

Saved in:
Bibliographic Details
Main Authors: Butcher, Robert R, Kirby, Russell , Jr, Nakakihara, John, Watkins, T C
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The UH-1H helicopter test bed program was accomplished at the US Army Aeronautical Depot Maintenance Center (ARADMAC), Corpus Christi, Texas, during the period 4 October 1970 through 17 December 1971. The program objective was to determine the capability of state-of-the-art hardware to automatically accomplish inspection, diagnostic and prognostic maintenance functions on selected subsystems of the UH-1H helicopter. Northrop's hardware for the program is identified as a Maintenance Reporting System (MRS). Helicopter components, both serviceable and degraded, were run and monitored for malfunction discrimination by the MRS in ARADMAC test cells and in two UH-1H aircraft. Trending for prognosis was attempted while accumulating flight time on two additional UH-1H aircraft utilizing serviceable components. The test results demonstrated the objectives of the test bed program. See also Volume 2, AD752891.