Loading…
UH-1 Test Bed Program. Volume 1
The UH-1H helicopter test bed program was accomplished at the US Army Aeronautical Depot Maintenance Center (ARADMAC), Corpus Christi, Texas, during the period 4 October 1970 through 17 December 1971. The program objective was to determine the capability of state-of-the-art hardware to automatically...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Report |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The UH-1H helicopter test bed program was accomplished at the US Army Aeronautical Depot Maintenance Center (ARADMAC), Corpus Christi, Texas, during the period 4 October 1970 through 17 December 1971. The program objective was to determine the capability of state-of-the-art hardware to automatically accomplish inspection, diagnostic and prognostic maintenance functions on selected subsystems of the UH-1H helicopter. Northrop's hardware for the program is identified as a Maintenance Reporting System (MRS). Helicopter components, both serviceable and degraded, were run and monitored for malfunction discrimination by the MRS in ARADMAC test cells and in two UH-1H aircraft. Trending for prognosis was attempted while accumulating flight time on two additional UH-1H aircraft utilizing serviceable components. The test results demonstrated the objectives of the test bed program.
See also Volume 2, AD752891. |
---|