Loading…
Scheduling a Single Facility under Constant Demand and Fixed Production Rate
The optimal production schedule is derived for a single machine producing one product which is demanded at a constant rate, r, but is produced at a higher rate, p. The optimal schedule is derived assuming instantaneous production or uniform production, with or without setup cost; and assuming linear...
Saved in:
Main Authors: | , |
---|---|
Format: | Report |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The optimal production schedule is derived for a single machine producing one product which is demanded at a constant rate, r, but is produced at a higher rate, p. The optimal schedule is derived assuming instantaneous production or uniform production, with or without setup cost; and assuming linear holding and backorder cost. (Author)
Sponsored in part by National Science Foundation, Washington, D. C. |
---|