Loading…

The Expected Difference between the Shortest Latency Time First (SLTF) and Minimal Total Processing Time (MTPT) Drum Scheduling Disciplines

The report is a sequel to an earlier report (Fuller, 1971) that develops a minimal-total-processing-time (MTPT) drum scheduling algorithm. A quantitative comparison between MTPT schedules and shortest-latency-time-first (SLTF) schedules, commonly acknowledged as good schedules for drum-like storage...

Full description

Saved in:
Bibliographic Details
Main Author: Fuller,Samuel H
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The report is a sequel to an earlier report (Fuller, 1971) that develops a minimal-total-processing-time (MTPT) drum scheduling algorithm. A quantitative comparison between MTPT schedules and shortest-latency-time-first (SLTF) schedules, commonly acknowledged as good schedules for drum-like storage units, is presented here. The analysis develops an analogy to random walks and proves several asymptotic properties of collections of records on drums. These properties are specialized to the MTPT and SLTF algorithms and it is shown that for sufficiently large sets of records, the expected processing time of a SLTF schedule is longer than a MTPT schedule by the expected record length. The results of a simulation study are also presented to show the difference in MTPT and SLTF schedules for small sets of records and for situations not covered in the analytic discussion. (Author)