Loading…

NOTS PARTICIPATION IN SEALAB 2 PROJECT

For the SEALAB II project, the U. S. Naval Ordnance Test Station was assigned responsibility for all surface operational support. The underwater site was selected in cooperation with the Scripps Institution of Oceanography. A staging area was established at the Long Beach Naval Shipyard and a stagin...

Full description

Saved in:
Bibliographic Details
Main Author: Carpenter, E P
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:For the SEALAB II project, the U. S. Naval Ordnance Test Station was assigned responsibility for all surface operational support. The underwater site was selected in cooperation with the Scripps Institution of Oceanography. A staging area was established at the Long Beach Naval Shipyard and a staging vessel was provided and modified to meet the needs of the program. Complete system integration and checkout were performed. All necessary operational support, personnel, equipment, and material were supplied.