Loading…
2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 9, Tracks 9-11
Track 9: *Fern Ridge Dam, Oregon: Seepage and Piping Concerns (Internal Erosion) Track 10: *Marmet Lock and Dam: Automated Instrumentation Assessment, Summer/Fall 2004, by Jeff Rakes and Ron Adams *Success Dam Seismic Remediation Track 11: *Canton Dam Spillway Stability: Is a Test Anchor Program Nec...
Saved in:
Main Authors: | , , , , , , , , , , , , , , |
---|---|
Format: | Report |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Track 9: *Fern Ridge Dam, Oregon: Seepage and Piping Concerns (Internal Erosion) Track 10: *Marmet Lock and Dam: Automated Instrumentation Assessment, Summer/Fall 2004, by Jeff Rakes and Ron Adams *Success Dam Seismic Remediation Track 11: *Canton Dam Spillway Stability: Is a Test Anchor Program Necessary?, by Randy Mead *Dynamic Testing and Numerical Correlation Studies for Folsom Dam, by Ziyad Duron, Enrique E. Matheu, Vincent P. Chiarito, Michael K. Sharp and Rick L.Poeppelman *Status of Portfolio Risk Assessment, by Eric Halpin *Mississinewa Dam Foundation Rehabilitation, by Jeff Schaefer *Wolf Creek Dam Seepage Major Rehabilitation Evaluation, by Michael F. Zoccola *Bluestone Dam DSA Anchor Challenges, by Michael McCray *Clearwater Dam Major Rehab Project, by Bobby Van Cleave *Design, Construction and Seepage at Prado Dam, by Douglas E. Chitwood *Seven Oaks Dam: Outlet Tunnel Invert Damage, by Robert Kwan *An Overview of An Overview of the Dam Safety Program Management Tools (DSPMT), by Tommy Schmidt
Re-Energizing Engineering Excellence, 02 Aug 2005, 04 Aug 2005, This is volume 9 of a 13 volume set. See also: 2005 Tri-Service Infrastructure Systems Conference and Exhibition, volume 1 track 1- AD1017676; volume 2 track 2 - AD1017679; volume 3 track 3- AD1017680; volume 4 track 4- AD1017684; volume 5 track 5- AD1017687; volume 6 track 6- AD1017689; volume 7 tracks 7 and 8- AD1017760; volume 8 track 8 continued- AD1017767; volume 10 track 12- AD1017803; volume 11 tracks 13 and 14- AD1017811; volume 12 tracks 15, 16 and 17- AD1017818; volume 13 tracks 20, 21 and workshop- AD1017822. |
---|