Loading…

F-106 Scheduled Maintenance Study. Phase III. Predictions and Recommendations

The objective of the F-106 Scheduled Maintenance Study was to formulate a method for examining the scheduled maintenance program in terms of both inspection content and interval suitable for any aircraft and to optimize that maintenance program on a cost and effectiveness basis. Data review, data ba...

Full description

Saved in:
Bibliographic Details
Main Authors: Brown,L J, Marks,K E, Wang,Gordon, Grote,R S, Cooper,J R
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The objective of the F-106 Scheduled Maintenance Study was to formulate a method for examining the scheduled maintenance program in terms of both inspection content and interval suitable for any aircraft and to optimize that maintenance program on a cost and effectiveness basis. Data review, data bank generation, field trips, and problem formulation were accomplished in Phase I of the study, as reported in GDCA-AHD72-001. During Phase II of this study, as reported in GDCA-AHD72-003, the requried statistical analyses were programmed and performed; the maintenance program analysis process was formulated; the cost and effectiveness models were formulated, programmed, and exercised; and a preliminary definition of the alternative maintenance program was completed. This report documents the results of the third and final phase of the study as well as Phase I and II. The tasks included in Phase III were the definition of the alternative maintenance program inspection packages and interval constraints, optimization of the maintenance program interval through cost and effectiveness analysis, formulation of a transition strategy for the recommended maintenance program, and preparation of a user's manual for the software package developed during the study. See also AD-A045 400.