Analysis of the Cost of Variable Workloads on Shipbuilding

The effect of shipyard workload variation on the cost of building ships has been analyzed. The results of four efforts are presented. The first major effort consists of an analysis of the effect of work density (i.e. worker crowding) on shipbuilding productivity and cost. The results show that an op...

Full description

Saved in:
Bibliographic Details
Main Authors: Magnuson ,Allen H, Terry,Robert W
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Magnuson ,Allen H
Terry,Robert W
description The effect of shipyard workload variation on the cost of building ships has been analyzed. The results of four efforts are presented. The first major effort consists of an analysis of the effect of work density (i.e. worker crowding) on shipbuilding productivity and cost. The results show that an optimum least cost construction time and work-force level exist as a result of a tradeoff between work density effects and fixed costs. The second effort was an attempt to identify causes of shipyard productivity variation based on interviews with shipyard supervisory personnel. The third effort involved development of a framework for estimating transfer functions to describe how workload variation affects cost. This work is to be based on historical producton and cost data. A description of adapting the Box-Jenkins forecasting methodology to the problem is presented. The fourth effort concerns development of a shipyard planning system to minimize cost of adjusting to workload variations. A review of current approaches to multi-resource/multi-project planning models is given along with a proposed decompostion of the planning problem into strategic and tactical components. The strategic or long-range planning deals with aggregate issues such as organizational goals, long-range manpower planning and facilities expansion. The tactical component is more detailed and involves workforce allocation on a trade level to the various activities composing the construction of each ship. The tactical planning level is short-term detailed planning that takes into account inter-and intra-trade interferences, precedence at relationships proper sequencing) for each task and manpower allocation. (Author)
format report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA077331</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA077331</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA0773313</originalsourceid><addsrcrecordid>eNrjZLByzEvMqSzOLFbIT1MoyUhVcM4vLgGxwxKLMhOTclIVwvOLsnPyE1OAKvIUgjMyC5JKM3NSMvPSeRhY0xJzilN5oTQ3g4yba4izh25KSWZyfHFJZl5qSbyji6OBubmxsaExAWkAZIwrqg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Analysis of the Cost of Variable Workloads on Shipbuilding</title><source>DTIC Technical Reports</source><creator>Magnuson ,Allen H ; Terry,Robert W</creator><creatorcontrib>Magnuson ,Allen H ; Terry,Robert W ; VIRGINIA POLYTECHNIC INST AND STATE UNIV BLACKSBURG DEPT OF AEROSPACE AND OCEAN ENGINEERING</creatorcontrib><description>The effect of shipyard workload variation on the cost of building ships has been analyzed. The results of four efforts are presented. The first major effort consists of an analysis of the effect of work density (i.e. worker crowding) on shipbuilding productivity and cost. The results show that an optimum least cost construction time and work-force level exist as a result of a tradeoff between work density effects and fixed costs. The second effort was an attempt to identify causes of shipyard productivity variation based on interviews with shipyard supervisory personnel. The third effort involved development of a framework for estimating transfer functions to describe how workload variation affects cost. This work is to be based on historical producton and cost data. A description of adapting the Box-Jenkins forecasting methodology to the problem is presented. The fourth effort concerns development of a shipyard planning system to minimize cost of adjusting to workload variations. A review of current approaches to multi-resource/multi-project planning models is given along with a proposed decompostion of the planning problem into strategic and tactical components. The strategic or long-range planning deals with aggregate issues such as organizational goals, long-range manpower planning and facilities expansion. The tactical component is more detailed and involves workforce allocation on a trade level to the various activities composing the construction of each ship. The tactical planning level is short-term detailed planning that takes into account inter-and intra-trade interferences, precedence at relationships proper sequencing) for each task and manpower allocation. (Author)</description><language>eng</language><subject>Administration and Management ; ALLOCATIONS ; COST ANALYSIS ; Economics and Cost Analysis ; JOB ANALYSIS ; MANAGEMENT PLANNING AND CONTROL ; Marine Engineering ; OPERATIONS RESEARCH ; PLANNING ; SHIPBUILDING ; TRANSFER FUNCTIONS ; VALUE ENGINEERING ; VARIABLES</subject><creationdate>1979</creationdate><rights>APPROVED FOR PUBLIC RELEASE</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,780,885,27565,27566</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA077331$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Magnuson ,Allen H</creatorcontrib><creatorcontrib>Terry,Robert W</creatorcontrib><creatorcontrib>VIRGINIA POLYTECHNIC INST AND STATE UNIV BLACKSBURG DEPT OF AEROSPACE AND OCEAN ENGINEERING</creatorcontrib><title>Analysis of the Cost of Variable Workloads on Shipbuilding</title><description>The effect of shipyard workload variation on the cost of building ships has been analyzed. The results of four efforts are presented. The first major effort consists of an analysis of the effect of work density (i.e. worker crowding) on shipbuilding productivity and cost. The results show that an optimum least cost construction time and work-force level exist as a result of a tradeoff between work density effects and fixed costs. The second effort was an attempt to identify causes of shipyard productivity variation based on interviews with shipyard supervisory personnel. The third effort involved development of a framework for estimating transfer functions to describe how workload variation affects cost. This work is to be based on historical producton and cost data. A description of adapting the Box-Jenkins forecasting methodology to the problem is presented. The fourth effort concerns development of a shipyard planning system to minimize cost of adjusting to workload variations. A review of current approaches to multi-resource/multi-project planning models is given along with a proposed decompostion of the planning problem into strategic and tactical components. The strategic or long-range planning deals with aggregate issues such as organizational goals, long-range manpower planning and facilities expansion. The tactical component is more detailed and involves workforce allocation on a trade level to the various activities composing the construction of each ship. The tactical planning level is short-term detailed planning that takes into account inter-and intra-trade interferences, precedence at relationships proper sequencing) for each task and manpower allocation. (Author)</description><subject>Administration and Management</subject><subject>ALLOCATIONS</subject><subject>COST ANALYSIS</subject><subject>Economics and Cost Analysis</subject><subject>JOB ANALYSIS</subject><subject>MANAGEMENT PLANNING AND CONTROL</subject><subject>Marine Engineering</subject><subject>OPERATIONS RESEARCH</subject><subject>PLANNING</subject><subject>SHIPBUILDING</subject><subject>TRANSFER FUNCTIONS</subject><subject>VALUE ENGINEERING</subject><subject>VARIABLES</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>1979</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNrjZLByzEvMqSzOLFbIT1MoyUhVcM4vLgGxwxKLMhOTclIVwvOLsnPyE1OAKvIUgjMyC5JKM3NSMvPSeRhY0xJzilN5oTQ3g4yba4izh25KSWZyfHFJZl5qSbyji6OBubmxsaExAWkAZIwrqg</recordid><startdate>197911</startdate><enddate>197911</enddate><creator>Magnuson ,Allen H</creator><creator>Terry,Robert W</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>197911</creationdate><title>Analysis of the Cost of Variable Workloads on Shipbuilding</title><author>Magnuson ,Allen H ; Terry,Robert W</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA0773313</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>1979</creationdate><topic>Administration and Management</topic><topic>ALLOCATIONS</topic><topic>COST ANALYSIS</topic><topic>Economics and Cost Analysis</topic><topic>JOB ANALYSIS</topic><topic>MANAGEMENT PLANNING AND CONTROL</topic><topic>Marine Engineering</topic><topic>OPERATIONS RESEARCH</topic><topic>PLANNING</topic><topic>SHIPBUILDING</topic><topic>TRANSFER FUNCTIONS</topic><topic>VALUE ENGINEERING</topic><topic>VARIABLES</topic><toplevel>online_resources</toplevel><creatorcontrib>Magnuson ,Allen H</creatorcontrib><creatorcontrib>Terry,Robert W</creatorcontrib><creatorcontrib>VIRGINIA POLYTECHNIC INST AND STATE UNIV BLACKSBURG DEPT OF AEROSPACE AND OCEAN ENGINEERING</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Magnuson ,Allen H</au><au>Terry,Robert W</au><aucorp>VIRGINIA POLYTECHNIC INST AND STATE UNIV BLACKSBURG DEPT OF AEROSPACE AND OCEAN ENGINEERING</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Analysis of the Cost of Variable Workloads on Shipbuilding</btitle><date>1979-11</date><risdate>1979</risdate><abstract>The effect of shipyard workload variation on the cost of building ships has been analyzed. The results of four efforts are presented. The first major effort consists of an analysis of the effect of work density (i.e. worker crowding) on shipbuilding productivity and cost. The results show that an optimum least cost construction time and work-force level exist as a result of a tradeoff between work density effects and fixed costs. The second effort was an attempt to identify causes of shipyard productivity variation based on interviews with shipyard supervisory personnel. The third effort involved development of a framework for estimating transfer functions to describe how workload variation affects cost. This work is to be based on historical producton and cost data. A description of adapting the Box-Jenkins forecasting methodology to the problem is presented. The fourth effort concerns development of a shipyard planning system to minimize cost of adjusting to workload variations. A review of current approaches to multi-resource/multi-project planning models is given along with a proposed decompostion of the planning problem into strategic and tactical components. The strategic or long-range planning deals with aggregate issues such as organizational goals, long-range manpower planning and facilities expansion. The tactical component is more detailed and involves workforce allocation on a trade level to the various activities composing the construction of each ship. The tactical planning level is short-term detailed planning that takes into account inter-and intra-trade interferences, precedence at relationships proper sequencing) for each task and manpower allocation. (Author)</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA077331
source DTIC Technical Reports
subjects Administration and Management
ALLOCATIONS
COST ANALYSIS
Economics and Cost Analysis
JOB ANALYSIS
MANAGEMENT PLANNING AND CONTROL
Marine Engineering
OPERATIONS RESEARCH
PLANNING
SHIPBUILDING
TRANSFER FUNCTIONS
VALUE ENGINEERING
VARIABLES
title Analysis of the Cost of Variable Workloads on Shipbuilding
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T11%3A42%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Analysis%20of%20the%20Cost%20of%20Variable%20Workloads%20on%20Shipbuilding&rft.au=Magnuson%20,Allen%20H&rft.aucorp=VIRGINIA%20POLYTECHNIC%20INST%20AND%20STATE%20UNIV%20BLACKSBURG%20DEPT%20OF%20AEROSPACE%20AND%20OCEAN%20ENGINEERING&rft.date=1979-11&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA077331%3C/dtic_1RU%3E%3Cgrp_id%3Ecdi_FETCH-dtic_stinet_ADA0773313%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true