Loading…

Development of a Computerized Training Requirements and Cost Evaluation System for the U.S. Marine Corps

This semi-annual report describes efforts to develop a resource management system for U.S. Marine Corps combat units and represents a step toward achieving that difficult goal. Specifically, this report delineates the conceptual framework and technical characteristics for the prototype benefit- cost...

Full description

Saved in:
Bibliographic Details
Main Authors: Donnell, Michael L, Adelman, Leonard
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Donnell, Michael L
Adelman, Leonard
description This semi-annual report describes efforts to develop a resource management system for U.S. Marine Corps combat units and represents a step toward achieving that difficult goal. Specifically, this report delineates the conceptual framework and technical characteristics for the prototype benefit- cost model and accompanying computer software (called CTRACES) being developed for the Marine Corps Training Requirements and Cost Evaluation System (TRACES). CTRACES is designed to help battalion commanders develop a cost-effective strategy for remedial training. They will be able to identify how many points and what percentage of the Marine Corps Combat Readiness Evaluation System (MCCRES) deficit their battalion can be expected to make up for the best package of remedial training options at a specific dollar level of cost. In addition, battalion commanders will be able to evaluate the expected benefit and cost of particular training packages that they, or others, have proposed for consideration.
format report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA085660</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA085660</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA0856603</originalsourceid><addsrcrecordid>eNqFyj0KwkAQQOE0FqLewGIuYAiIwTYkERsbE-swmFkzsD9xdzagpzeCvdUr3rdMhoom0m40ZAWcAoTSmTEKeX5TD61HtmwfcKVnZE9fFgBtP7MgUE-oIwo7C80rCBlQzoMMBLe0SeGCni3N1I9hnSwU6kCbX1fJ9lS35XnXC9-7IDOUrqiK7HjI82z_Z38ALyU8iQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Development of a Computerized Training Requirements and Cost Evaluation System for the U.S. Marine Corps</title><source>DTIC Technical Reports</source><creator>Donnell, Michael L ; Adelman, Leonard</creator><creatorcontrib>Donnell, Michael L ; Adelman, Leonard ; DECISIONS AND DESIGNS INC MCLEAN VA</creatorcontrib><description>This semi-annual report describes efforts to develop a resource management system for U.S. Marine Corps combat units and represents a step toward achieving that difficult goal. Specifically, this report delineates the conceptual framework and technical characteristics for the prototype benefit- cost model and accompanying computer software (called CTRACES) being developed for the Marine Corps Training Requirements and Cost Evaluation System (TRACES). CTRACES is designed to help battalion commanders develop a cost-effective strategy for remedial training. They will be able to identify how many points and what percentage of the Marine Corps Combat Readiness Evaluation System (MCCRES) deficit their battalion can be expected to make up for the best package of remedial training options at a specific dollar level of cost. In addition, battalion commanders will be able to evaluate the expected benefit and cost of particular training packages that they, or others, have proposed for consideration.</description><language>eng</language><subject>ALGORITHMS ; BATTALION LEVEL ORGANIZATIONS ; COMBAT READINESS ; COMPUTER PROGRAMMING ; COST EFFECTIVENESS ; Economics and Cost Analysis ; Humanities and History ; MARINE CORPS TRAINING ; MILITARY COMMANDERS ; MILITARY REQUIREMENTS ; RESOURCE MANAGEMENT</subject><creationdate>1980</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,776,881,27544,27545</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA085660$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Donnell, Michael L</creatorcontrib><creatorcontrib>Adelman, Leonard</creatorcontrib><creatorcontrib>DECISIONS AND DESIGNS INC MCLEAN VA</creatorcontrib><title>Development of a Computerized Training Requirements and Cost Evaluation System for the U.S. Marine Corps</title><description>This semi-annual report describes efforts to develop a resource management system for U.S. Marine Corps combat units and represents a step toward achieving that difficult goal. Specifically, this report delineates the conceptual framework and technical characteristics for the prototype benefit- cost model and accompanying computer software (called CTRACES) being developed for the Marine Corps Training Requirements and Cost Evaluation System (TRACES). CTRACES is designed to help battalion commanders develop a cost-effective strategy for remedial training. They will be able to identify how many points and what percentage of the Marine Corps Combat Readiness Evaluation System (MCCRES) deficit their battalion can be expected to make up for the best package of remedial training options at a specific dollar level of cost. In addition, battalion commanders will be able to evaluate the expected benefit and cost of particular training packages that they, or others, have proposed for consideration.</description><subject>ALGORITHMS</subject><subject>BATTALION LEVEL ORGANIZATIONS</subject><subject>COMBAT READINESS</subject><subject>COMPUTER PROGRAMMING</subject><subject>COST EFFECTIVENESS</subject><subject>Economics and Cost Analysis</subject><subject>Humanities and History</subject><subject>MARINE CORPS TRAINING</subject><subject>MILITARY COMMANDERS</subject><subject>MILITARY REQUIREMENTS</subject><subject>RESOURCE MANAGEMENT</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>1980</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNqFyj0KwkAQQOE0FqLewGIuYAiIwTYkERsbE-swmFkzsD9xdzagpzeCvdUr3rdMhoom0m40ZAWcAoTSmTEKeX5TD61HtmwfcKVnZE9fFgBtP7MgUE-oIwo7C80rCBlQzoMMBLe0SeGCni3N1I9hnSwU6kCbX1fJ9lS35XnXC9-7IDOUrqiK7HjI82z_Z38ALyU8iQ</recordid><startdate>198005</startdate><enddate>198005</enddate><creator>Donnell, Michael L</creator><creator>Adelman, Leonard</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>198005</creationdate><title>Development of a Computerized Training Requirements and Cost Evaluation System for the U.S. Marine Corps</title><author>Donnell, Michael L ; Adelman, Leonard</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA0856603</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>1980</creationdate><topic>ALGORITHMS</topic><topic>BATTALION LEVEL ORGANIZATIONS</topic><topic>COMBAT READINESS</topic><topic>COMPUTER PROGRAMMING</topic><topic>COST EFFECTIVENESS</topic><topic>Economics and Cost Analysis</topic><topic>Humanities and History</topic><topic>MARINE CORPS TRAINING</topic><topic>MILITARY COMMANDERS</topic><topic>MILITARY REQUIREMENTS</topic><topic>RESOURCE MANAGEMENT</topic><toplevel>online_resources</toplevel><creatorcontrib>Donnell, Michael L</creatorcontrib><creatorcontrib>Adelman, Leonard</creatorcontrib><creatorcontrib>DECISIONS AND DESIGNS INC MCLEAN VA</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Donnell, Michael L</au><au>Adelman, Leonard</au><aucorp>DECISIONS AND DESIGNS INC MCLEAN VA</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Development of a Computerized Training Requirements and Cost Evaluation System for the U.S. Marine Corps</btitle><date>1980-05</date><risdate>1980</risdate><abstract>This semi-annual report describes efforts to develop a resource management system for U.S. Marine Corps combat units and represents a step toward achieving that difficult goal. Specifically, this report delineates the conceptual framework and technical characteristics for the prototype benefit- cost model and accompanying computer software (called CTRACES) being developed for the Marine Corps Training Requirements and Cost Evaluation System (TRACES). CTRACES is designed to help battalion commanders develop a cost-effective strategy for remedial training. They will be able to identify how many points and what percentage of the Marine Corps Combat Readiness Evaluation System (MCCRES) deficit their battalion can be expected to make up for the best package of remedial training options at a specific dollar level of cost. In addition, battalion commanders will be able to evaluate the expected benefit and cost of particular training packages that they, or others, have proposed for consideration.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA085660
source DTIC Technical Reports
subjects ALGORITHMS
BATTALION LEVEL ORGANIZATIONS
COMBAT READINESS
COMPUTER PROGRAMMING
COST EFFECTIVENESS
Economics and Cost Analysis
Humanities and History
MARINE CORPS TRAINING
MILITARY COMMANDERS
MILITARY REQUIREMENTS
RESOURCE MANAGEMENT
title Development of a Computerized Training Requirements and Cost Evaluation System for the U.S. Marine Corps
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T08%3A29%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Development%20of%20a%20Computerized%20Training%20Requirements%20and%20Cost%20Evaluation%20System%20for%20the%20U.S.%20Marine%20Corps&rft.au=Donnell,%20Michael%20L&rft.aucorp=DECISIONS%20AND%20DESIGNS%20INC%20MCLEAN%20VA&rft.date=1980-05&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA085660%3C/dtic_1RU%3E%3Cgrp_id%3Ecdi_FETCH-dtic_stinet_ADA0856603%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true