Loading…
Mach 10/14 Operations in the NSWC Hypervelocity Wind Tunnel Number 9 (Vertical Heater Vessel Leg)
The original design of the Tunnel No. 9 Hypervelocity Facility called for three distinct Mach number capabilities; namely Mach 10, Mach 15, and Mach 20. The Mach 15 (now Mach 14) and Mach 10 legs are operational. However, problems have been encountered in using horizontal heater vessel to store hot...
Saved in:
Main Author: | |
---|---|
Format: | Report |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | |
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Kavetsky, Robert A |
description | The original design of the Tunnel No. 9 Hypervelocity Facility called for three distinct Mach number capabilities; namely Mach 10, Mach 15, and Mach 20. The Mach 15 (now Mach 14) and Mach 10 legs are operational. However, problems have been encountered in using horizontal heater vessel to store hot test gas in the Mach 10 leg. A potential solution was to use the existing Mach 10 nozzle in combination with the Mach 14 heater vessel. After several design changes were implemented to mate the Mach 10 nozzle with the Mach 14 heater vessel, tunnel tests were conducted which demonstrated operational feasibility. However, unexpected high pressure drops resulted in a low Reynolds number. This report documents both Mach 10 and Mach 14 testing capabilities utilizing the Mach 14 heater vessel, and the analyses and testing on which the capabilities are based. |
format | report |
fullrecord | <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA132235</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA132235</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA1322353</originalsourceid><addsrcrecordid>eNrjZEj0TUzOUDA00Dc0UfAvSC1KLMnMzytWyMxTKMlIVfALDndW8KgEipel5uQnZ5ZUKoRn5qUohJTm5aXmKPiV5ialFilYKmiEpRaVZCYn5ih4pCaWAIXCUouLgQp8UtM1eRhY0xJzilN5oTQ3g4yba4izh24KUEd8cUlmXmpJvKOLo6GxkZGxqTEBaQD3DjeY</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Mach 10/14 Operations in the NSWC Hypervelocity Wind Tunnel Number 9 (Vertical Heater Vessel Leg)</title><source>DTIC Technical Reports</source><creator>Kavetsky, Robert A</creator><creatorcontrib>Kavetsky, Robert A ; NAVAL SURFACE WEAPONS CENTER SILVER SPRING MD</creatorcontrib><description>The original design of the Tunnel No. 9 Hypervelocity Facility called for three distinct Mach number capabilities; namely Mach 10, Mach 15, and Mach 20. The Mach 15 (now Mach 14) and Mach 10 legs are operational. However, problems have been encountered in using horizontal heater vessel to store hot test gas in the Mach 10 leg. A potential solution was to use the existing Mach 10 nozzle in combination with the Mach 14 heater vessel. After several design changes were implemented to mate the Mach 10 nozzle with the Mach 14 heater vessel, tunnel tests were conducted which demonstrated operational feasibility. However, unexpected high pressure drops resulted in a low Reynolds number. This report documents both Mach 10 and Mach 14 testing capabilities utilizing the Mach 14 heater vessel, and the analyses and testing on which the capabilities are based.</description><language>eng</language><subject>DROPS ; FLOW RESTRICTORS ; GAS DYNAMICS ; HEATERS ; HIGH PRESSURE ; HORIZONTAL ORIENTATION ; HOT GASES ; HYPERSONIC FLOW ; HYPERSONIC VELOCITY ; HYPERSONIC WIND TUNNELS ; LININGS ; LOW RATE ; MACH NUMBER ; PARTICLE SEPARATORS ; PARTICLES ; PRESSURE VESSELS ; RAREFACTION ; SEPARATION ; SOLUTIONS(GENERAL) ; STRUCTURAL ANALYSIS ; Test Facilities, Equipment and Methods ; THERMAL INSULATION ; VERTICAL ORIENTATION ; WIND TUNNELS ; WU17X4912</subject><creationdate>1982</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,780,885,27567,27568</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA132235$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Kavetsky, Robert A</creatorcontrib><creatorcontrib>NAVAL SURFACE WEAPONS CENTER SILVER SPRING MD</creatorcontrib><title>Mach 10/14 Operations in the NSWC Hypervelocity Wind Tunnel Number 9 (Vertical Heater Vessel Leg)</title><description>The original design of the Tunnel No. 9 Hypervelocity Facility called for three distinct Mach number capabilities; namely Mach 10, Mach 15, and Mach 20. The Mach 15 (now Mach 14) and Mach 10 legs are operational. However, problems have been encountered in using horizontal heater vessel to store hot test gas in the Mach 10 leg. A potential solution was to use the existing Mach 10 nozzle in combination with the Mach 14 heater vessel. After several design changes were implemented to mate the Mach 10 nozzle with the Mach 14 heater vessel, tunnel tests were conducted which demonstrated operational feasibility. However, unexpected high pressure drops resulted in a low Reynolds number. This report documents both Mach 10 and Mach 14 testing capabilities utilizing the Mach 14 heater vessel, and the analyses and testing on which the capabilities are based.</description><subject>DROPS</subject><subject>FLOW RESTRICTORS</subject><subject>GAS DYNAMICS</subject><subject>HEATERS</subject><subject>HIGH PRESSURE</subject><subject>HORIZONTAL ORIENTATION</subject><subject>HOT GASES</subject><subject>HYPERSONIC FLOW</subject><subject>HYPERSONIC VELOCITY</subject><subject>HYPERSONIC WIND TUNNELS</subject><subject>LININGS</subject><subject>LOW RATE</subject><subject>MACH NUMBER</subject><subject>PARTICLE SEPARATORS</subject><subject>PARTICLES</subject><subject>PRESSURE VESSELS</subject><subject>RAREFACTION</subject><subject>SEPARATION</subject><subject>SOLUTIONS(GENERAL)</subject><subject>STRUCTURAL ANALYSIS</subject><subject>Test Facilities, Equipment and Methods</subject><subject>THERMAL INSULATION</subject><subject>VERTICAL ORIENTATION</subject><subject>WIND TUNNELS</subject><subject>WU17X4912</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>1982</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNrjZEj0TUzOUDA00Dc0UfAvSC1KLMnMzytWyMxTKMlIVfALDndW8KgEipel5uQnZ5ZUKoRn5qUohJTm5aXmKPiV5ialFilYKmiEpRaVZCYn5ih4pCaWAIXCUouLgQp8UtM1eRhY0xJzilN5oTQ3g4yba4izh24KUEd8cUlmXmpJvKOLo6GxkZGxqTEBaQD3DjeY</recordid><startdate>19820716</startdate><enddate>19820716</enddate><creator>Kavetsky, Robert A</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>19820716</creationdate><title>Mach 10/14 Operations in the NSWC Hypervelocity Wind Tunnel Number 9 (Vertical Heater Vessel Leg)</title><author>Kavetsky, Robert A</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA1322353</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>1982</creationdate><topic>DROPS</topic><topic>FLOW RESTRICTORS</topic><topic>GAS DYNAMICS</topic><topic>HEATERS</topic><topic>HIGH PRESSURE</topic><topic>HORIZONTAL ORIENTATION</topic><topic>HOT GASES</topic><topic>HYPERSONIC FLOW</topic><topic>HYPERSONIC VELOCITY</topic><topic>HYPERSONIC WIND TUNNELS</topic><topic>LININGS</topic><topic>LOW RATE</topic><topic>MACH NUMBER</topic><topic>PARTICLE SEPARATORS</topic><topic>PARTICLES</topic><topic>PRESSURE VESSELS</topic><topic>RAREFACTION</topic><topic>SEPARATION</topic><topic>SOLUTIONS(GENERAL)</topic><topic>STRUCTURAL ANALYSIS</topic><topic>Test Facilities, Equipment and Methods</topic><topic>THERMAL INSULATION</topic><topic>VERTICAL ORIENTATION</topic><topic>WIND TUNNELS</topic><topic>WU17X4912</topic><toplevel>online_resources</toplevel><creatorcontrib>Kavetsky, Robert A</creatorcontrib><creatorcontrib>NAVAL SURFACE WEAPONS CENTER SILVER SPRING MD</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Kavetsky, Robert A</au><aucorp>NAVAL SURFACE WEAPONS CENTER SILVER SPRING MD</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Mach 10/14 Operations in the NSWC Hypervelocity Wind Tunnel Number 9 (Vertical Heater Vessel Leg)</btitle><date>1982-07-16</date><risdate>1982</risdate><abstract>The original design of the Tunnel No. 9 Hypervelocity Facility called for three distinct Mach number capabilities; namely Mach 10, Mach 15, and Mach 20. The Mach 15 (now Mach 14) and Mach 10 legs are operational. However, problems have been encountered in using horizontal heater vessel to store hot test gas in the Mach 10 leg. A potential solution was to use the existing Mach 10 nozzle in combination with the Mach 14 heater vessel. After several design changes were implemented to mate the Mach 10 nozzle with the Mach 14 heater vessel, tunnel tests were conducted which demonstrated operational feasibility. However, unexpected high pressure drops resulted in a low Reynolds number. This report documents both Mach 10 and Mach 14 testing capabilities utilizing the Mach 14 heater vessel, and the analyses and testing on which the capabilities are based.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_dtic_stinet_ADA132235 |
source | DTIC Technical Reports |
subjects | DROPS FLOW RESTRICTORS GAS DYNAMICS HEATERS HIGH PRESSURE HORIZONTAL ORIENTATION HOT GASES HYPERSONIC FLOW HYPERSONIC VELOCITY HYPERSONIC WIND TUNNELS LININGS LOW RATE MACH NUMBER PARTICLE SEPARATORS PARTICLES PRESSURE VESSELS RAREFACTION SEPARATION SOLUTIONS(GENERAL) STRUCTURAL ANALYSIS Test Facilities, Equipment and Methods THERMAL INSULATION VERTICAL ORIENTATION WIND TUNNELS WU17X4912 |
title | Mach 10/14 Operations in the NSWC Hypervelocity Wind Tunnel Number 9 (Vertical Heater Vessel Leg) |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T10%3A29%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Mach%2010/14%20Operations%20in%20the%20NSWC%20Hypervelocity%20Wind%20Tunnel%20Number%209%20(Vertical%20Heater%20Vessel%20Leg)&rft.au=Kavetsky,%20Robert%20A&rft.aucorp=NAVAL%20SURFACE%20WEAPONS%20CENTER%20SILVER%20SPRING%20MD&rft.date=1982-07-16&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA132235%3C/dtic_1RU%3E%3Cgrp_id%3Ecdi_FETCH-dtic_stinet_ADA1322353%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |