Loading…

New Bedford Harbor Superfund Project, Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Report 3. Characterization and Elutriate Testing of Acushnet River Estuary Sediment

Several of the alternatives being considered for the New Bedford Harbor Superfund Project involve dredging of contaminated sediment from the Acushnet River Estuary and placement of the contaminated dredged material in confined disposal areas. Evaluation of these alternatives requires testing sedimen...

Full description

Saved in:
Bibliographic Details
Main Author: Averett, Daniel E
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Several of the alternatives being considered for the New Bedford Harbor Superfund Project involve dredging of contaminated sediment from the Acushnet River Estuary and placement of the contaminated dredged material in confined disposal areas. Evaluation of these alternatives requires testing sediment from the site to determine chemical and physical characteristics, settling properties, contaminant releases for various migration pathways, and treatment requirements for disposal area effluent. The purpose of this report is to describe the estuary composite sediment sample and the hot spot sediment sample tested at the US Arym Engineer Waterways Experiment Station as part of the US Army Corps of Engineers' Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Bulk sediment chemistry, physical characteristics, and elutriate testing for the sediments are included. Contaminant, Dredged material, Dredging, Elutriate, Metals, New bedford harbor, PCB, Sediment, Superfund. See also Report 4 dated Jan 1988, ADA200462.