Loading…

Test and Evaluation of Six Fire Resistant Booms at Ohmsett

Six oil spill booms produced by five manufacturers for use as fire booms were tested at the Minerals Management Service's Ohmsett Facility, NWS-Earle, Leonardo, NJ. The tests were conducted between July 16, 1996 and October 4, 1996. The booms were tested for: first loss tow speed, oil loss rate...

Full description

Saved in:
Bibliographic Details
Main Authors: DeVitis, David, Cunneff, Susan, Nash, James
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Six oil spill booms produced by five manufacturers for use as fire booms were tested at the Minerals Management Service's Ohmsett Facility, NWS-Earle, Leonardo, NJ. The tests were conducted between July 16, 1996 and October 4, 1996. The booms were tested for: first loss tow speed, oil loss rate, and critical tow speed. No fires were used during these tests. Four of the booms performed within speed and rate loss ranges that have been measured for commercial non-fire booms. One boom was found to be superior in critical tow speed. However, this boom was at the lower edge of the range for first loss tow speed. A prototype boom, with a unique paddle-wheel operating principle, was the sixth boom included in the study. This boom was found to need further development.