American Recovery and Reinvestment Act Projects -- Repairs to the Reserve Training Center and Construction of a Vehicle Maintenance Facility at Wilmington, Delaware, Met Recovery Act Goals

The Department of Defense Inspector General's (DoD IG) overall objective was to evaluate DoD's implementation of Public Law 111-5, American Recovery and Reinvestment Act of 2009, (Recovery Act), February 17, 2009. Specifically, the DoD IG determined whether Navy and Marine Corps personnel...

Full description

Saved in:
Bibliographic Details
Main Author: Carey, Alice F
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Carey, Alice F
description The Department of Defense Inspector General's (DoD IG) overall objective was to evaluate DoD's implementation of Public Law 111-5, American Recovery and Reinvestment Act of 2009, (Recovery Act), February 17, 2009. Specifically, the DoD IG determined whether Navy and Marine Corps personnel adequately planned, funded, executed, tracked, and reported Projects RM146-09 and RM145-09 for repairs to the Navy Operational Support Center/Marine Corps Reserve Center (NOSC/MCRC) and the construction of a Vehicle Maintenance Facility at Wilmington, Delaware, to ensure the appropriate use of Recovery Act funds. Project RM146-09 consists of installation of a new sprinkler system, removal and replacement of interior building components and exterior windows, and reconfiguration of interior walls to comply with accessibility requirements. Project RM145-09 will construct a new VMF. The DoD IG determined that Projects RM146-09 and RM145-09 were justified and met the Recovery Act goals regarding accountability and transparency. Navy and Marine Corps personnel planned, funded, executed, and had procedures in place to track and report the projects as required by the Recovery Act and implementation guidance. Although project planning documentation did not contain a complete economic analysis and the contract initially omitted a required Federal Acquisition Regulation clause, after the IG identified these issues, Navy personnel subsequently developed a complete economic analysis and issued a contract modification to include the clause. This report contains no recommendations. The Deputy Assistant Operations Officer, Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic Public Works Department, had no comments on the discussion draft report and agreed with the IG's results and conclusions. The DoD IG does not require any formal comments.
format report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA529706</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA529706</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA5297063</originalsourceid><addsrcrecordid>eNqFTstKA0EQ3IsHUf_AQ39AFoKiIcdlY-IlIBL0GJpOJWmZ7ZGedsV_8-McRfDoqSjqedp8dgNchY0eIXmEfxDbrhK1ESUGWFAnQQ-eXyBRqG2r-MrqhSJTHFFpgY-gjbOa2oH6GoL_9PTZSvibhGajvCemJxxVEmhdzQFjE9CSRZNGnQ561jTUksg2oQUSv7NjQmvE38HvP6vMqZw3J_sKuPjFs-Zyebfp79tdqGxLqCG23aK7uZrPprfX_8hf-Rxatw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>American Recovery and Reinvestment Act Projects -- Repairs to the Reserve Training Center and Construction of a Vehicle Maintenance Facility at Wilmington, Delaware, Met Recovery Act Goals</title><source>DTIC Technical Reports</source><creator>Carey, Alice F</creator><creatorcontrib>Carey, Alice F ; INSPECTOR GENERAL DEPT OF DEFENSE ARLINGTON VA</creatorcontrib><description>The Department of Defense Inspector General's (DoD IG) overall objective was to evaluate DoD's implementation of Public Law 111-5, American Recovery and Reinvestment Act of 2009, (Recovery Act), February 17, 2009. Specifically, the DoD IG determined whether Navy and Marine Corps personnel adequately planned, funded, executed, tracked, and reported Projects RM146-09 and RM145-09 for repairs to the Navy Operational Support Center/Marine Corps Reserve Center (NOSC/MCRC) and the construction of a Vehicle Maintenance Facility at Wilmington, Delaware, to ensure the appropriate use of Recovery Act funds. Project RM146-09 consists of installation of a new sprinkler system, removal and replacement of interior building components and exterior windows, and reconfiguration of interior walls to comply with accessibility requirements. Project RM145-09 will construct a new VMF. The DoD IG determined that Projects RM146-09 and RM145-09 were justified and met the Recovery Act goals regarding accountability and transparency. Navy and Marine Corps personnel planned, funded, executed, and had procedures in place to track and report the projects as required by the Recovery Act and implementation guidance. Although project planning documentation did not contain a complete economic analysis and the contract initially omitted a required Federal Acquisition Regulation clause, after the IG identified these issues, Navy personnel subsequently developed a complete economic analysis and issued a contract modification to include the clause. This report contains no recommendations. The Deputy Assistant Operations Officer, Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic Public Works Department, had no comments on the discussion draft report and agreed with the IG's results and conclusions. The DoD IG does not require any formal comments.</description><language>eng</language><subject>ACCOUNTABILITY ; Administration and Management ; AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS ; AUDITING ; CONSTRUCTION ; CONTRACT ADMINISTRATION ; DELAWARE ; DELAWARE(WILMINGTON) ; FAR(FEDERAL ACQUISITION REGULATION) ; FINANCIAL MANAGEMENT ; LEGISLATION ; Logistics, Military Facilities and Supplies ; MANAGEMENT PLANNING AND CONTROL ; MARINE CORPS FACILITIES ; MARINE CORPS PERSONNEL ; MARINE CORPS RESERVE CENTER ; Military Forces and Organizations ; MILITARY RESERVES ; NAVAL PERSONNEL ; NAVAL SHORE FACILITIES ; NAVY OPERATIONAL SUPPORT CENTER ; PROJECT MANAGEMENT ; REPAIR ; REPAIR SHOPS ; REQUIREMENTS ; SMALL BUSINESS SET-ASIDES ; Structural Engineering and Building Technology ; VEHICLE MAINTENANCE FACILITY ; VEHICLE REPAIR SHOPS</subject><creationdate>2010</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,780,885,27567,27568</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA529706$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Carey, Alice F</creatorcontrib><creatorcontrib>INSPECTOR GENERAL DEPT OF DEFENSE ARLINGTON VA</creatorcontrib><title>American Recovery and Reinvestment Act Projects -- Repairs to the Reserve Training Center and Construction of a Vehicle Maintenance Facility at Wilmington, Delaware, Met Recovery Act Goals</title><description>The Department of Defense Inspector General's (DoD IG) overall objective was to evaluate DoD's implementation of Public Law 111-5, American Recovery and Reinvestment Act of 2009, (Recovery Act), February 17, 2009. Specifically, the DoD IG determined whether Navy and Marine Corps personnel adequately planned, funded, executed, tracked, and reported Projects RM146-09 and RM145-09 for repairs to the Navy Operational Support Center/Marine Corps Reserve Center (NOSC/MCRC) and the construction of a Vehicle Maintenance Facility at Wilmington, Delaware, to ensure the appropriate use of Recovery Act funds. Project RM146-09 consists of installation of a new sprinkler system, removal and replacement of interior building components and exterior windows, and reconfiguration of interior walls to comply with accessibility requirements. Project RM145-09 will construct a new VMF. The DoD IG determined that Projects RM146-09 and RM145-09 were justified and met the Recovery Act goals regarding accountability and transparency. Navy and Marine Corps personnel planned, funded, executed, and had procedures in place to track and report the projects as required by the Recovery Act and implementation guidance. Although project planning documentation did not contain a complete economic analysis and the contract initially omitted a required Federal Acquisition Regulation clause, after the IG identified these issues, Navy personnel subsequently developed a complete economic analysis and issued a contract modification to include the clause. This report contains no recommendations. The Deputy Assistant Operations Officer, Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic Public Works Department, had no comments on the discussion draft report and agreed with the IG's results and conclusions. The DoD IG does not require any formal comments.</description><subject>ACCOUNTABILITY</subject><subject>Administration and Management</subject><subject>AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS</subject><subject>AUDITING</subject><subject>CONSTRUCTION</subject><subject>CONTRACT ADMINISTRATION</subject><subject>DELAWARE</subject><subject>DELAWARE(WILMINGTON)</subject><subject>FAR(FEDERAL ACQUISITION REGULATION)</subject><subject>FINANCIAL MANAGEMENT</subject><subject>LEGISLATION</subject><subject>Logistics, Military Facilities and Supplies</subject><subject>MANAGEMENT PLANNING AND CONTROL</subject><subject>MARINE CORPS FACILITIES</subject><subject>MARINE CORPS PERSONNEL</subject><subject>MARINE CORPS RESERVE CENTER</subject><subject>Military Forces and Organizations</subject><subject>MILITARY RESERVES</subject><subject>NAVAL PERSONNEL</subject><subject>NAVAL SHORE FACILITIES</subject><subject>NAVY OPERATIONAL SUPPORT CENTER</subject><subject>PROJECT MANAGEMENT</subject><subject>REPAIR</subject><subject>REPAIR SHOPS</subject><subject>REQUIREMENTS</subject><subject>SMALL BUSINESS SET-ASIDES</subject><subject>Structural Engineering and Building Technology</subject><subject>VEHICLE MAINTENANCE FACILITY</subject><subject>VEHICLE REPAIR SHOPS</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>2010</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNqFTstKA0EQ3IsHUf_AQ39AFoKiIcdlY-IlIBL0GJpOJWmZ7ZGedsV_8-McRfDoqSjqedp8dgNchY0eIXmEfxDbrhK1ESUGWFAnQQ-eXyBRqG2r-MrqhSJTHFFpgY-gjbOa2oH6GoL_9PTZSvibhGajvCemJxxVEmhdzQFjE9CSRZNGnQ561jTUksg2oQUSv7NjQmvE38HvP6vMqZw3J_sKuPjFs-Zyebfp79tdqGxLqCG23aK7uZrPprfX_8hf-Rxatw</recordid><startdate>20100910</startdate><enddate>20100910</enddate><creator>Carey, Alice F</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>20100910</creationdate><title>American Recovery and Reinvestment Act Projects -- Repairs to the Reserve Training Center and Construction of a Vehicle Maintenance Facility at Wilmington, Delaware, Met Recovery Act Goals</title><author>Carey, Alice F</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA5297063</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>2010</creationdate><topic>ACCOUNTABILITY</topic><topic>Administration and Management</topic><topic>AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS</topic><topic>AUDITING</topic><topic>CONSTRUCTION</topic><topic>CONTRACT ADMINISTRATION</topic><topic>DELAWARE</topic><topic>DELAWARE(WILMINGTON)</topic><topic>FAR(FEDERAL ACQUISITION REGULATION)</topic><topic>FINANCIAL MANAGEMENT</topic><topic>LEGISLATION</topic><topic>Logistics, Military Facilities and Supplies</topic><topic>MANAGEMENT PLANNING AND CONTROL</topic><topic>MARINE CORPS FACILITIES</topic><topic>MARINE CORPS PERSONNEL</topic><topic>MARINE CORPS RESERVE CENTER</topic><topic>Military Forces and Organizations</topic><topic>MILITARY RESERVES</topic><topic>NAVAL PERSONNEL</topic><topic>NAVAL SHORE FACILITIES</topic><topic>NAVY OPERATIONAL SUPPORT CENTER</topic><topic>PROJECT MANAGEMENT</topic><topic>REPAIR</topic><topic>REPAIR SHOPS</topic><topic>REQUIREMENTS</topic><topic>SMALL BUSINESS SET-ASIDES</topic><topic>Structural Engineering and Building Technology</topic><topic>VEHICLE MAINTENANCE FACILITY</topic><topic>VEHICLE REPAIR SHOPS</topic><toplevel>online_resources</toplevel><creatorcontrib>Carey, Alice F</creatorcontrib><creatorcontrib>INSPECTOR GENERAL DEPT OF DEFENSE ARLINGTON VA</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Carey, Alice F</au><aucorp>INSPECTOR GENERAL DEPT OF DEFENSE ARLINGTON VA</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>American Recovery and Reinvestment Act Projects -- Repairs to the Reserve Training Center and Construction of a Vehicle Maintenance Facility at Wilmington, Delaware, Met Recovery Act Goals</btitle><date>2010-09-10</date><risdate>2010</risdate><abstract>The Department of Defense Inspector General's (DoD IG) overall objective was to evaluate DoD's implementation of Public Law 111-5, American Recovery and Reinvestment Act of 2009, (Recovery Act), February 17, 2009. Specifically, the DoD IG determined whether Navy and Marine Corps personnel adequately planned, funded, executed, tracked, and reported Projects RM146-09 and RM145-09 for repairs to the Navy Operational Support Center/Marine Corps Reserve Center (NOSC/MCRC) and the construction of a Vehicle Maintenance Facility at Wilmington, Delaware, to ensure the appropriate use of Recovery Act funds. Project RM146-09 consists of installation of a new sprinkler system, removal and replacement of interior building components and exterior windows, and reconfiguration of interior walls to comply with accessibility requirements. Project RM145-09 will construct a new VMF. The DoD IG determined that Projects RM146-09 and RM145-09 were justified and met the Recovery Act goals regarding accountability and transparency. Navy and Marine Corps personnel planned, funded, executed, and had procedures in place to track and report the projects as required by the Recovery Act and implementation guidance. Although project planning documentation did not contain a complete economic analysis and the contract initially omitted a required Federal Acquisition Regulation clause, after the IG identified these issues, Navy personnel subsequently developed a complete economic analysis and issued a contract modification to include the clause. This report contains no recommendations. The Deputy Assistant Operations Officer, Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic Public Works Department, had no comments on the discussion draft report and agreed with the IG's results and conclusions. The DoD IG does not require any formal comments.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA529706
source DTIC Technical Reports
subjects ACCOUNTABILITY
Administration and Management
AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS
AUDITING
CONSTRUCTION
CONTRACT ADMINISTRATION
DELAWARE
DELAWARE(WILMINGTON)
FAR(FEDERAL ACQUISITION REGULATION)
FINANCIAL MANAGEMENT
LEGISLATION
Logistics, Military Facilities and Supplies
MANAGEMENT PLANNING AND CONTROL
MARINE CORPS FACILITIES
MARINE CORPS PERSONNEL
MARINE CORPS RESERVE CENTER
Military Forces and Organizations
MILITARY RESERVES
NAVAL PERSONNEL
NAVAL SHORE FACILITIES
NAVY OPERATIONAL SUPPORT CENTER
PROJECT MANAGEMENT
REPAIR
REPAIR SHOPS
REQUIREMENTS
SMALL BUSINESS SET-ASIDES
Structural Engineering and Building Technology
VEHICLE MAINTENANCE FACILITY
VEHICLE REPAIR SHOPS
title American Recovery and Reinvestment Act Projects -- Repairs to the Reserve Training Center and Construction of a Vehicle Maintenance Facility at Wilmington, Delaware, Met Recovery Act Goals
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T04%3A34%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=American%20Recovery%20and%20Reinvestment%20Act%20Projects%20--%20Repairs%20to%20the%20Reserve%20Training%20Center%20and%20Construction%20of%20a%20Vehicle%20Maintenance%20Facility%20at%20Wilmington,%20Delaware,%20Met%20Recovery%20Act%20Goals&rft.au=Carey,%20Alice%20F&rft.aucorp=INSPECTOR%20GENERAL%20DEPT%20OF%20DEFENSE%20ARLINGTON%20VA&rft.date=2010-09-10&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA529706%3C/dtic_1RU%3E%3Cgrp_id%3Ecdi_FETCH-dtic_stinet_ADA5297063%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true