Coast Guard: Action Needed As Approved Deepwater Program Remains Unachievable
The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and p...
Saved in:
Main Authors: | , , , , , , , , , , , |
---|---|
Format: | Report |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | |
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Hutton, John P Mackin,, Michele Traci, Molly Carrigg, William Derricotte, Tisha Echard, Jennifer Fish, Laurier Gomez, Carlos Hassinger, Kristine Lee, Jason Richey, Karen Wilson, Rebecca |
description | The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide.
Report to Congressional Committees. |
format | report |
fullrecord | <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA546218</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA546218</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA5462183</originalsourceid><addsrcrecordid>eNrjZPB1zk8sLlFwL00sSrFScEwuyczPU_BLTU1JTVFwLFZwLCgoyi8Dsl1SUwvKE0tSixQCivLTixJzFYJScxMz84oVQvMSkzMyU8sSk3JSeRhY0xJzilN5oTQ3g4yba4izh25KSWZyfHFJZl5qSbyji6OpiZmRoYUxAWkALzgyUg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Coast Guard: Action Needed As Approved Deepwater Program Remains Unachievable</title><source>DTIC Technical Reports</source><creator>Hutton, John P ; Mackin,, Michele ; Traci, Molly ; Carrigg, William ; Derricotte, Tisha ; Echard, Jennifer ; Fish, Laurier ; Gomez, Carlos ; Hassinger, Kristine ; Lee, Jason ; Richey, Karen ; Wilson, Rebecca</creator><creatorcontrib>Hutton, John P ; Mackin,, Michele ; Traci, Molly ; Carrigg, William ; Derricotte, Tisha ; Echard, Jennifer ; Fish, Laurier ; Gomez, Carlos ; Hassinger, Kristine ; Lee, Jason ; Richey, Karen ; Wilson, Rebecca ; GOVERNMENT ACCOUNTABILITY OFFICE WASHINGTON DC</creatorcontrib><description>The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide.
Report to Congressional Committees.</description><language>eng</language><subject>ACCOUNTABILITY ; Aircraft ; BASE LINES ; COAST GUARD ; COST ESTIMATES ; COSTS ; DEEP WATER ; DEEPWATER PROGRAM ; DOCUMENTS ; Economics and Cost Analysis ; GAO REPORTS ; INTEGRATED SYSTEMS ; Marine Engineering ; Military Forces and Organizations ; PARAMETERS ; SCHEDULING ; SHIPS</subject><creationdate>2011</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,780,885,27567,27568</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA546218$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Hutton, John P</creatorcontrib><creatorcontrib>Mackin,, Michele</creatorcontrib><creatorcontrib>Traci, Molly</creatorcontrib><creatorcontrib>Carrigg, William</creatorcontrib><creatorcontrib>Derricotte, Tisha</creatorcontrib><creatorcontrib>Echard, Jennifer</creatorcontrib><creatorcontrib>Fish, Laurier</creatorcontrib><creatorcontrib>Gomez, Carlos</creatorcontrib><creatorcontrib>Hassinger, Kristine</creatorcontrib><creatorcontrib>Lee, Jason</creatorcontrib><creatorcontrib>Richey, Karen</creatorcontrib><creatorcontrib>Wilson, Rebecca</creatorcontrib><creatorcontrib>GOVERNMENT ACCOUNTABILITY OFFICE WASHINGTON DC</creatorcontrib><title>Coast Guard: Action Needed As Approved Deepwater Program Remains Unachievable</title><description>The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide.
Report to Congressional Committees.</description><subject>ACCOUNTABILITY</subject><subject>Aircraft</subject><subject>BASE LINES</subject><subject>COAST GUARD</subject><subject>COST ESTIMATES</subject><subject>COSTS</subject><subject>DEEP WATER</subject><subject>DEEPWATER PROGRAM</subject><subject>DOCUMENTS</subject><subject>Economics and Cost Analysis</subject><subject>GAO REPORTS</subject><subject>INTEGRATED SYSTEMS</subject><subject>Marine Engineering</subject><subject>Military Forces and Organizations</subject><subject>PARAMETERS</subject><subject>SCHEDULING</subject><subject>SHIPS</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>2011</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNrjZPB1zk8sLlFwL00sSrFScEwuyczPU_BLTU1JTVFwLFZwLCgoyi8Dsl1SUwvKE0tSixQCivLTixJzFYJScxMz84oVQvMSkzMyU8sSk3JSeRhY0xJzilN5oTQ3g4yba4izh25KSWZyfHFJZl5qSbyji6OpiZmRoYUxAWkALzgyUg</recordid><startdate>201107</startdate><enddate>201107</enddate><creator>Hutton, John P</creator><creator>Mackin,, Michele</creator><creator>Traci, Molly</creator><creator>Carrigg, William</creator><creator>Derricotte, Tisha</creator><creator>Echard, Jennifer</creator><creator>Fish, Laurier</creator><creator>Gomez, Carlos</creator><creator>Hassinger, Kristine</creator><creator>Lee, Jason</creator><creator>Richey, Karen</creator><creator>Wilson, Rebecca</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>201107</creationdate><title>Coast Guard: Action Needed As Approved Deepwater Program Remains Unachievable</title><author>Hutton, John P ; Mackin,, Michele ; Traci, Molly ; Carrigg, William ; Derricotte, Tisha ; Echard, Jennifer ; Fish, Laurier ; Gomez, Carlos ; Hassinger, Kristine ; Lee, Jason ; Richey, Karen ; Wilson, Rebecca</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA5462183</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>2011</creationdate><topic>ACCOUNTABILITY</topic><topic>Aircraft</topic><topic>BASE LINES</topic><topic>COAST GUARD</topic><topic>COST ESTIMATES</topic><topic>COSTS</topic><topic>DEEP WATER</topic><topic>DEEPWATER PROGRAM</topic><topic>DOCUMENTS</topic><topic>Economics and Cost Analysis</topic><topic>GAO REPORTS</topic><topic>INTEGRATED SYSTEMS</topic><topic>Marine Engineering</topic><topic>Military Forces and Organizations</topic><topic>PARAMETERS</topic><topic>SCHEDULING</topic><topic>SHIPS</topic><toplevel>online_resources</toplevel><creatorcontrib>Hutton, John P</creatorcontrib><creatorcontrib>Mackin,, Michele</creatorcontrib><creatorcontrib>Traci, Molly</creatorcontrib><creatorcontrib>Carrigg, William</creatorcontrib><creatorcontrib>Derricotte, Tisha</creatorcontrib><creatorcontrib>Echard, Jennifer</creatorcontrib><creatorcontrib>Fish, Laurier</creatorcontrib><creatorcontrib>Gomez, Carlos</creatorcontrib><creatorcontrib>Hassinger, Kristine</creatorcontrib><creatorcontrib>Lee, Jason</creatorcontrib><creatorcontrib>Richey, Karen</creatorcontrib><creatorcontrib>Wilson, Rebecca</creatorcontrib><creatorcontrib>GOVERNMENT ACCOUNTABILITY OFFICE WASHINGTON DC</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Hutton, John P</au><au>Mackin,, Michele</au><au>Traci, Molly</au><au>Carrigg, William</au><au>Derricotte, Tisha</au><au>Echard, Jennifer</au><au>Fish, Laurier</au><au>Gomez, Carlos</au><au>Hassinger, Kristine</au><au>Lee, Jason</au><au>Richey, Karen</au><au>Wilson, Rebecca</au><aucorp>GOVERNMENT ACCOUNTABILITY OFFICE WASHINGTON DC</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Coast Guard: Action Needed As Approved Deepwater Program Remains Unachievable</btitle><date>2011-07</date><risdate>2011</risdate><abstract>The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide.
Report to Congressional Committees.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_dtic_stinet_ADA546218 |
source | DTIC Technical Reports |
subjects | ACCOUNTABILITY Aircraft BASE LINES COAST GUARD COST ESTIMATES COSTS DEEP WATER DEEPWATER PROGRAM DOCUMENTS Economics and Cost Analysis GAO REPORTS INTEGRATED SYSTEMS Marine Engineering Military Forces and Organizations PARAMETERS SCHEDULING SHIPS |
title | Coast Guard: Action Needed As Approved Deepwater Program Remains Unachievable |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-30T23%3A10%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Coast%20Guard:%20Action%20Needed%20As%20Approved%20Deepwater%20Program%20Remains%20Unachievable&rft.au=Hutton,%20John%20P&rft.aucorp=GOVERNMENT%20ACCOUNTABILITY%20OFFICE%20WASHINGTON%20DC&rft.date=2011-07&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA546218%3C/dtic_1RU%3E%3Cgrp_id%3Ecdi_FETCH-dtic_stinet_ADA5462183%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |