Loading…

Final Environmental Assessment for Camp Rudder Master Plan at Eglin Air Force Base, FL

The Proposed Action is to initiate activities under the Ranger Training Brigade (RTB) Recapitalization Master Plan for the 6th Ranger Training Battalion (6th RTB) at Camp James Rudder on Eglin Air Force Base (AFB) (Figures 1-1, 1-2, and 1-3). These activities include constructing six pre-engineered...

Full description

Saved in:
Bibliographic Details
Main Authors: Akstulewicz, Kevin D, Baker-Littman, Sherri, Gilmore, Stephen, Jones, Christa, Koralewski, Jason, McLaurine, Henry, Sculthorpe, Eric, Szutenbach, Alysia, Tucker, Kathryn
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The Proposed Action is to initiate activities under the Ranger Training Brigade (RTB) Recapitalization Master Plan for the 6th Ranger Training Battalion (6th RTB) at Camp James Rudder on Eglin Air Force Base (AFB) (Figures 1-1, 1-2, and 1-3). These activities include constructing six pre-engineered metal buildings, replacing the gymnasium, renovating the student and cadre barracks, and building a Controlled Environment Storage Facility (Boat House, new Building 6070), a consolidated Company Operations Facility and a consolidated Maintenance and Storage Facility. Infrastructure needed to support daily operation includes utility line connections to the buildings. Buildings 6016, 6018, 6019, 6020, 6022, 6024, 6025, 6030, 6034, 6041, 6042, 6043, 6044, 6045, 6046, and 6070 would be demolished. The demolition of existing buildings encompasses 41,150 square feet. This Environmental Assessment (EA) describes the potential environmental impacts that would result from these activities. The Ranger Training Brigade is the proponent of the action, and the Air Force is the cooperating agency.