Loading…

United States Air Force Environmental Assessment: Construction of Chapel Addition at Tinker AFB, Oklahoma

Tinker Air Force Base (Tinker AFB, the base) has completed an environmental assessment (EA) to determine environmental and socio-economic impacts of construction of an addition to the base chapel that would enhance and complement current chapel services. The preferred location for the addition is ad...

Full description

Saved in:
Bibliographic Details
Main Authors: Taylor, Timothy T, Saxion, Howard, Reaves, Richard, Zender, Kira, Griggs, Ed, Dunagan, David
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Taylor, Timothy T
Saxion, Howard
Reaves, Richard
Zender, Kira
Griggs, Ed
Dunagan, David
description Tinker Air Force Base (Tinker AFB, the base) has completed an environmental assessment (EA) to determine environmental and socio-economic impacts of construction of an addition to the base chapel that would enhance and complement current chapel services. The preferred location for the addition is adjacent to the existing chapel. This site was assessed and approved for a smaller addition in a 1997 EA, but the addition was never built. No other action alternatives were considered. The no-action alternative is continued operation of the base chapel without the addition. Descriptions of these alternatives are provided in the EA. This document assesses the alternatives to determine whether there exists a practicable alternative to construction of the addition to the chapel that would have less or no impacts to the floodplain of Crutcho Creek.
format report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA633971</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA633971</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA6339713</originalsourceid><addsrcrecordid>eNqFijsOwkAMBdNQIOAGFD4AFCgSCLolJKKjINSRlXUUKxsvWhvOz0f0VE8z86YZ34SNPFwNjRQcJ6hiaglKeXKKMpIYBnCqpPqBAxRR1NKjNY4CsYOixzu9L97zV6FBzTJQAlcdV3AZAvZxxHk26TAoLX47y5ZVWRfntTduGzUWssad3DbP97tN_ie_ADgqPIw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>United States Air Force Environmental Assessment: Construction of Chapel Addition at Tinker AFB, Oklahoma</title><source>DTIC Technical Reports</source><creator>Taylor, Timothy T ; Saxion, Howard ; Reaves, Richard ; Zender, Kira ; Griggs, Ed ; Dunagan, David</creator><creatorcontrib>Taylor, Timothy T ; Saxion, Howard ; Reaves, Richard ; Zender, Kira ; Griggs, Ed ; Dunagan, David ; CH2M HILL WORLD ATLANTA GA</creatorcontrib><description>Tinker Air Force Base (Tinker AFB, the base) has completed an environmental assessment (EA) to determine environmental and socio-economic impacts of construction of an addition to the base chapel that would enhance and complement current chapel services. The preferred location for the addition is adjacent to the existing chapel. This site was assessed and approved for a smaller addition in a 1997 EA, but the addition was never built. No other action alternatives were considered. The no-action alternative is continued operation of the base chapel without the addition. Descriptions of these alternatives are provided in the EA. This document assesses the alternatives to determine whether there exists a practicable alternative to construction of the addition to the chapel that would have less or no impacts to the floodplain of Crutcho Creek.</description><language>eng</language><subject>AIR FORCE FACILITIES ; AIR QUALITY ; BIOLOGICAL RESOURCES ; CONSTRUCTION ; ECONOMIC RESOURCES ; ENVIRONMENTAL ASSESSMENT ; Environmental Health and Safety ; FLOODPLAINS ; FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE) ; LAND USE ; Logistics, Military Facilities and Supplies ; NOISE ; PRODUCTIVITY ; SOILS ; SOLID WASTES ; Structural Engineering and Building Technology ; SURFACE WATERS ; TOPOGRAPHY ; TRANSPORTATION ; UTILITIES</subject><creationdate>2003</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,776,881,27546,27547</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA633971$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Taylor, Timothy T</creatorcontrib><creatorcontrib>Saxion, Howard</creatorcontrib><creatorcontrib>Reaves, Richard</creatorcontrib><creatorcontrib>Zender, Kira</creatorcontrib><creatorcontrib>Griggs, Ed</creatorcontrib><creatorcontrib>Dunagan, David</creatorcontrib><creatorcontrib>CH2M HILL WORLD ATLANTA GA</creatorcontrib><title>United States Air Force Environmental Assessment: Construction of Chapel Addition at Tinker AFB, Oklahoma</title><description>Tinker Air Force Base (Tinker AFB, the base) has completed an environmental assessment (EA) to determine environmental and socio-economic impacts of construction of an addition to the base chapel that would enhance and complement current chapel services. The preferred location for the addition is adjacent to the existing chapel. This site was assessed and approved for a smaller addition in a 1997 EA, but the addition was never built. No other action alternatives were considered. The no-action alternative is continued operation of the base chapel without the addition. Descriptions of these alternatives are provided in the EA. This document assesses the alternatives to determine whether there exists a practicable alternative to construction of the addition to the chapel that would have less or no impacts to the floodplain of Crutcho Creek.</description><subject>AIR FORCE FACILITIES</subject><subject>AIR QUALITY</subject><subject>BIOLOGICAL RESOURCES</subject><subject>CONSTRUCTION</subject><subject>ECONOMIC RESOURCES</subject><subject>ENVIRONMENTAL ASSESSMENT</subject><subject>Environmental Health and Safety</subject><subject>FLOODPLAINS</subject><subject>FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE)</subject><subject>LAND USE</subject><subject>Logistics, Military Facilities and Supplies</subject><subject>NOISE</subject><subject>PRODUCTIVITY</subject><subject>SOILS</subject><subject>SOLID WASTES</subject><subject>Structural Engineering and Building Technology</subject><subject>SURFACE WATERS</subject><subject>TOPOGRAPHY</subject><subject>TRANSPORTATION</subject><subject>UTILITIES</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>2003</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNqFijsOwkAMBdNQIOAGFD4AFCgSCLolJKKjINSRlXUUKxsvWhvOz0f0VE8z86YZ34SNPFwNjRQcJ6hiaglKeXKKMpIYBnCqpPqBAxRR1NKjNY4CsYOixzu9L97zV6FBzTJQAlcdV3AZAvZxxHk26TAoLX47y5ZVWRfntTduGzUWssad3DbP97tN_ie_ADgqPIw</recordid><startdate>200301</startdate><enddate>200301</enddate><creator>Taylor, Timothy T</creator><creator>Saxion, Howard</creator><creator>Reaves, Richard</creator><creator>Zender, Kira</creator><creator>Griggs, Ed</creator><creator>Dunagan, David</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>200301</creationdate><title>United States Air Force Environmental Assessment: Construction of Chapel Addition at Tinker AFB, Oklahoma</title><author>Taylor, Timothy T ; Saxion, Howard ; Reaves, Richard ; Zender, Kira ; Griggs, Ed ; Dunagan, David</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA6339713</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>2003</creationdate><topic>AIR FORCE FACILITIES</topic><topic>AIR QUALITY</topic><topic>BIOLOGICAL RESOURCES</topic><topic>CONSTRUCTION</topic><topic>ECONOMIC RESOURCES</topic><topic>ENVIRONMENTAL ASSESSMENT</topic><topic>Environmental Health and Safety</topic><topic>FLOODPLAINS</topic><topic>FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE)</topic><topic>LAND USE</topic><topic>Logistics, Military Facilities and Supplies</topic><topic>NOISE</topic><topic>PRODUCTIVITY</topic><topic>SOILS</topic><topic>SOLID WASTES</topic><topic>Structural Engineering and Building Technology</topic><topic>SURFACE WATERS</topic><topic>TOPOGRAPHY</topic><topic>TRANSPORTATION</topic><topic>UTILITIES</topic><toplevel>online_resources</toplevel><creatorcontrib>Taylor, Timothy T</creatorcontrib><creatorcontrib>Saxion, Howard</creatorcontrib><creatorcontrib>Reaves, Richard</creatorcontrib><creatorcontrib>Zender, Kira</creatorcontrib><creatorcontrib>Griggs, Ed</creatorcontrib><creatorcontrib>Dunagan, David</creatorcontrib><creatorcontrib>CH2M HILL WORLD ATLANTA GA</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Taylor, Timothy T</au><au>Saxion, Howard</au><au>Reaves, Richard</au><au>Zender, Kira</au><au>Griggs, Ed</au><au>Dunagan, David</au><aucorp>CH2M HILL WORLD ATLANTA GA</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>United States Air Force Environmental Assessment: Construction of Chapel Addition at Tinker AFB, Oklahoma</btitle><date>2003-01</date><risdate>2003</risdate><abstract>Tinker Air Force Base (Tinker AFB, the base) has completed an environmental assessment (EA) to determine environmental and socio-economic impacts of construction of an addition to the base chapel that would enhance and complement current chapel services. The preferred location for the addition is adjacent to the existing chapel. This site was assessed and approved for a smaller addition in a 1997 EA, but the addition was never built. No other action alternatives were considered. The no-action alternative is continued operation of the base chapel without the addition. Descriptions of these alternatives are provided in the EA. This document assesses the alternatives to determine whether there exists a practicable alternative to construction of the addition to the chapel that would have less or no impacts to the floodplain of Crutcho Creek.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA633971
source DTIC Technical Reports
subjects AIR FORCE FACILITIES
AIR QUALITY
BIOLOGICAL RESOURCES
CONSTRUCTION
ECONOMIC RESOURCES
ENVIRONMENTAL ASSESSMENT
Environmental Health and Safety
FLOODPLAINS
FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE)
LAND USE
Logistics, Military Facilities and Supplies
NOISE
PRODUCTIVITY
SOILS
SOLID WASTES
Structural Engineering and Building Technology
SURFACE WATERS
TOPOGRAPHY
TRANSPORTATION
UTILITIES
title United States Air Force Environmental Assessment: Construction of Chapel Addition at Tinker AFB, Oklahoma
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T16%3A22%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=United%20States%20Air%20Force%20Environmental%20Assessment:%20Construction%20of%20Chapel%20Addition%20at%20Tinker%20AFB,%20Oklahoma&rft.au=Taylor,%20Timothy%20T&rft.aucorp=CH2M%20HILL%20WORLD%20ATLANTA%20GA&rft.date=2003-01&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA633971%3C/dtic_1RU%3E%3Cgrp_id%3Ecdi_FETCH-dtic_stinet_ADA6339713%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true