Advanced Metallic Air Vehicle Structure Program

This report covers the final stages of manufacture of the wing carry through structure (WCTS), mating of the WCTS to the upper test structure, completion of the hardware and software elements of the test set-up leading to an operational test system, and start of the fatigue test program of the AMAVS...

Full description

Saved in:
Bibliographic Details
Main Authors: Bissell, R C, Miller, R E, Mabry, K D, Chambers, R S
Format: Report
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This report covers the final stages of manufacture of the wing carry through structure (WCTS), mating of the WCTS to the upper test structure, completion of the hardware and software elements of the test set-up leading to an operational test system, and start of the fatigue test program of the AMAVS WCTS. Included are design and analysis supporting the WCTS manufacture, mating task, and test system preparation activities. Also included is the analytical task of incorporating updated loads/spectrum data from Rockwell International (RI) into the AMAVS program. Following completion of the test system, operational checkouts were accomplished and strain surveys for the existing load conditions were made. The updated loads/spectrum data was then incorporated, further system check-outs made, and the fatigue test was started on 21 October 1975.