Procurement 4.0 and Organizational Performance in the Malaysian Construction Industry
Procurement 4.0 is the result of the industrial revolution (IR) 4.0 technologies implemented into the organization. The incorporation of IR 4.0 with the procurement system in the Malaysian construction industry is still low because of the lack of expertise available to adopt the technology. Therefor...
Saved in:
Published in: | International journal of service science, management, engineering and technology management, engineering and technology, 2022, Vol.13 (1), p.1-22 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c3211-bdbcd94a5392be2a238dcabfe94aaf1772eae177f855f3cfc28b6faf06e951393 |
---|---|
cites | cdi_FETCH-LOGICAL-c3211-bdbcd94a5392be2a238dcabfe94aaf1772eae177f855f3cfc28b6faf06e951393 |
container_end_page | 22 |
container_issue | 1 |
container_start_page | 1 |
container_title | International journal of service science, management, engineering and technology |
container_volume | 13 |
creator | Lee, Khai Loon Shaharud-din, Afiq Muqri Bin |
description | Procurement 4.0 is the result of the industrial revolution (IR) 4.0 technologies implemented into the organization. The incorporation of IR 4.0 with the procurement system in the Malaysian construction industry is still low because of the lack of expertise available to adopt the technology. Therefore, this study investigated relationships between procurement 4.0 elements, organizational performance, and mediating effect of intention to optimize the procurement process. To support this study, resource-based view theory and theory of planned behaviour were applied. This study focuses on 5267 G7 Malaysia construction companies. 413 online survey questionnaires were distributed using cluster random sampling techniques, and 134 responses were successfully acquired, representing 32.45% of the response rate. SmartPLS was used to analyze the data. Seven hypotheses are supported, while three are not supported. The mediating effect of intention to optimize the procurement process is significant only in the relationship between procurement 4.0 strategy and organizational performance. |
doi_str_mv | 10.4018/IJSSMET.314591 |
format | article |
fullrecord | <record><control><sourceid>gale_igi_j</sourceid><recordid>TN_cdi_gale_businessinsightsgauss_A761220764</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><galeid>A761220764</galeid><sourcerecordid>A761220764</sourcerecordid><originalsourceid>FETCH-LOGICAL-c3211-bdbcd94a5392be2a238dcabfe94aaf1772eae177f855f3cfc28b6faf06e951393</originalsourceid><addsrcrecordid>eNptkEtLAzEQgBdRUNSr54BXt-a5j6OUqhWLQlvwFmazyTZlm9Vk91B_vZGtejGHeYRvhuFLkiuCJxyT4nb-tFwuZqsJI1yU5Cg5IyXP0zLD7PinFuXbaXIZwhbHJ3ieZ-IsWb_6Tg1e77TrEZ9gBK5GL74BZz-ht52DFr1qbzq_A6c0sg71G40W0MI-WHBo2rnQ-0F9s2ju6iF2-4vkxEAb9OUhnyfr-9lq-pg-vzzMp3fPqWKUkLSqK1WXHAQraaUpUFbUCiqj4x8YkudUg47JFEIYpoyiRZUZMDjTpSCsZOfJ9bj33Xcfgw693HaDjzcHSfMiw0LwgkbqZqQaaLWshmCdDjEE22z60MAQgrzLM0IpzjMe8cmIK9-F4LWR797uwO8lwfJbtjzIlqPsODAbB2xj_w44SJVcYhmlyl-p_28hjH0BnBCKlg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2786055482</pqid></control><display><type>article</type><title>Procurement 4.0 and Organizational Performance in the Malaysian Construction Industry</title><source>IGI Global Gold Open Access e-Journal Collection Copyright 2022</source><creator>Lee, Khai Loon ; Shaharud-din, Afiq Muqri Bin</creator><creatorcontrib>Lee, Khai Loon ; Shaharud-din, Afiq Muqri Bin</creatorcontrib><description>Procurement 4.0 is the result of the industrial revolution (IR) 4.0 technologies implemented into the organization. The incorporation of IR 4.0 with the procurement system in the Malaysian construction industry is still low because of the lack of expertise available to adopt the technology. Therefore, this study investigated relationships between procurement 4.0 elements, organizational performance, and mediating effect of intention to optimize the procurement process. To support this study, resource-based view theory and theory of planned behaviour were applied. This study focuses on 5267 G7 Malaysia construction companies. 413 online survey questionnaires were distributed using cluster random sampling techniques, and 134 responses were successfully acquired, representing 32.45% of the response rate. SmartPLS was used to analyze the data. Seven hypotheses are supported, while three are not supported. The mediating effect of intention to optimize the procurement process is significant only in the relationship between procurement 4.0 strategy and organizational performance.</description><identifier>ISSN: 1947-959X</identifier><identifier>EISSN: 1947-9603</identifier><identifier>DOI: 10.4018/IJSSMET.314591</identifier><language>eng</language><publisher>Hershey: IGI Global</publisher><subject>Construction industry ; Surveys</subject><ispartof>International journal of service science, management, engineering and technology, 2022, Vol.13 (1), p.1-22</ispartof><rights>COPYRIGHT 2022 IGI Global</rights><rights>2022. This work is published under https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c3211-bdbcd94a5392be2a238dcabfe94aaf1772eae177f855f3cfc28b6faf06e951393</citedby><cites>FETCH-LOGICAL-c3211-bdbcd94a5392be2a238dcabfe94aaf1772eae177f855f3cfc28b6faf06e951393</cites><orcidid>0000-0002-7615-8133</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,4010,27900,27901,27902</link.rule.ids></links><search><creatorcontrib>Lee, Khai Loon</creatorcontrib><creatorcontrib>Shaharud-din, Afiq Muqri Bin</creatorcontrib><title>Procurement 4.0 and Organizational Performance in the Malaysian Construction Industry</title><title>International journal of service science, management, engineering and technology</title><description>Procurement 4.0 is the result of the industrial revolution (IR) 4.0 technologies implemented into the organization. The incorporation of IR 4.0 with the procurement system in the Malaysian construction industry is still low because of the lack of expertise available to adopt the technology. Therefore, this study investigated relationships between procurement 4.0 elements, organizational performance, and mediating effect of intention to optimize the procurement process. To support this study, resource-based view theory and theory of planned behaviour were applied. This study focuses on 5267 G7 Malaysia construction companies. 413 online survey questionnaires were distributed using cluster random sampling techniques, and 134 responses were successfully acquired, representing 32.45% of the response rate. SmartPLS was used to analyze the data. Seven hypotheses are supported, while three are not supported. The mediating effect of intention to optimize the procurement process is significant only in the relationship between procurement 4.0 strategy and organizational performance.</description><subject>Construction industry</subject><subject>Surveys</subject><issn>1947-959X</issn><issn>1947-9603</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><recordid>eNptkEtLAzEQgBdRUNSr54BXt-a5j6OUqhWLQlvwFmazyTZlm9Vk91B_vZGtejGHeYRvhuFLkiuCJxyT4nb-tFwuZqsJI1yU5Cg5IyXP0zLD7PinFuXbaXIZwhbHJ3ieZ-IsWb_6Tg1e77TrEZ9gBK5GL74BZz-ht52DFr1qbzq_A6c0sg71G40W0MI-WHBo2rnQ-0F9s2ju6iF2-4vkxEAb9OUhnyfr-9lq-pg-vzzMp3fPqWKUkLSqK1WXHAQraaUpUFbUCiqj4x8YkudUg47JFEIYpoyiRZUZMDjTpSCsZOfJ9bj33Xcfgw693HaDjzcHSfMiw0LwgkbqZqQaaLWshmCdDjEE22z60MAQgrzLM0IpzjMe8cmIK9-F4LWR797uwO8lwfJbtjzIlqPsODAbB2xj_w44SJVcYhmlyl-p_28hjH0BnBCKlg</recordid><startdate>2022</startdate><enddate>2022</enddate><creator>Lee, Khai Loon</creator><creator>Shaharud-din, Afiq Muqri Bin</creator><general>IGI Global</general><scope>AAYXX</scope><scope>CITATION</scope><scope>N95</scope><scope>7SC</scope><scope>8FD</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope><scope>PQBIZ</scope><scope>PQBZA</scope><orcidid>https://orcid.org/0000-0002-7615-8133</orcidid></search><sort><creationdate>2022</creationdate><title>Procurement 4.0 and Organizational Performance in the Malaysian Construction Industry</title><author>Lee, Khai Loon ; Shaharud-din, Afiq Muqri Bin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c3211-bdbcd94a5392be2a238dcabfe94aaf1772eae177f855f3cfc28b6faf06e951393</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>Construction industry</topic><topic>Surveys</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Lee, Khai Loon</creatorcontrib><creatorcontrib>Shaharud-din, Afiq Muqri Bin</creatorcontrib><collection>CrossRef</collection><collection>Gale Business: Insights</collection><collection>Computer and Information Systems Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><collection>One Business (ProQuest)</collection><collection>ProQuest One Business (Alumni)</collection><jtitle>International journal of service science, management, engineering and technology</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Lee, Khai Loon</au><au>Shaharud-din, Afiq Muqri Bin</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Procurement 4.0 and Organizational Performance in the Malaysian Construction Industry</atitle><jtitle>International journal of service science, management, engineering and technology</jtitle><date>2022</date><risdate>2022</risdate><volume>13</volume><issue>1</issue><spage>1</spage><epage>22</epage><pages>1-22</pages><issn>1947-959X</issn><eissn>1947-9603</eissn><abstract>Procurement 4.0 is the result of the industrial revolution (IR) 4.0 technologies implemented into the organization. The incorporation of IR 4.0 with the procurement system in the Malaysian construction industry is still low because of the lack of expertise available to adopt the technology. Therefore, this study investigated relationships between procurement 4.0 elements, organizational performance, and mediating effect of intention to optimize the procurement process. To support this study, resource-based view theory and theory of planned behaviour were applied. This study focuses on 5267 G7 Malaysia construction companies. 413 online survey questionnaires were distributed using cluster random sampling techniques, and 134 responses were successfully acquired, representing 32.45% of the response rate. SmartPLS was used to analyze the data. Seven hypotheses are supported, while three are not supported. The mediating effect of intention to optimize the procurement process is significant only in the relationship between procurement 4.0 strategy and organizational performance.</abstract><cop>Hershey</cop><pub>IGI Global</pub><doi>10.4018/IJSSMET.314591</doi><tpages>22</tpages><orcidid>https://orcid.org/0000-0002-7615-8133</orcidid><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1947-959X |
ispartof | International journal of service science, management, engineering and technology, 2022, Vol.13 (1), p.1-22 |
issn | 1947-959X 1947-9603 |
language | eng |
recordid | cdi_gale_businessinsightsgauss_A761220764 |
source | IGI Global Gold Open Access e-Journal Collection Copyright 2022 |
subjects | Construction industry Surveys |
title | Procurement 4.0 and Organizational Performance in the Malaysian Construction Industry |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T13%3A51%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-gale_igi_j&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Procurement%204.0%20and%20Organizational%20Performance%20in%20the%20Malaysian%20Construction%20Industry&rft.jtitle=International%20journal%20of%20service%20science,%20management,%20engineering%20and%20technology&rft.au=Lee,%20Khai%20Loon&rft.date=2022&rft.volume=13&rft.issue=1&rft.spage=1&rft.epage=22&rft.pages=1-22&rft.issn=1947-959X&rft.eissn=1947-9603&rft_id=info:doi/10.4018/IJSSMET.314591&rft_dat=%3Cgale_igi_j%3EA761220764%3C/gale_igi_j%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c3211-bdbcd94a5392be2a238dcabfe94aaf1772eae177f855f3cfc28b6faf06e951393%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2786055482&rft_id=info:pmid/&rft_galeid=A761220764&rfr_iscdi=true |