Loading…
FAIM2007 Special Issue: Simulation-based scheduling of assembly operations
The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these p...
Saved in:
Published in: | International journal of computer integrated manufacturing 2009-04, Vol.22 (4), p.325-333 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 333 |
container_issue | 4 |
container_start_page | 325 |
container_title | International journal of computer integrated manufacturing |
container_volume | 22 |
creator | Weigert, Gerald Henlich, Thomas |
description | The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these processes, several graph methods were developed in the past, i.e. AND/OR-graphs or modified Petri nets, but most of them are static methods and they are not suitable for scheduling tasks. This paper demonstrates, how Timed AND/OR-graphs can be modeled with a common Discrete Event Simulation (DES) system. The objective is a simulation-based scheduling system for assembly processes which is able to improve the prediction of due date keeping as well as to optimize the workflow of the assembly systems. |
doi_str_mv | 10.1080/09511920802225914 |
format | article |
fullrecord | <record><control><sourceid>hal</sourceid><recordid>TN_cdi_hal_primary_oai_HAL_hal_00513404v1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>oai_HAL_hal_00513404v1</sourcerecordid><originalsourceid>FETCH-hal_primary_oai_HAL_hal_00513404v13</originalsourceid><addsrcrecordid>eNqVys0OwUAUBeCJkKifB7CbrUW5d6aD2okQFVa1sGsGQ0em2vSqxNv7iRewOifnfIz1EAYIExhCqBBD8a5CCBViUGMeypHwJShRZ97n999g32QtoisASjUBj62Xs2grAMY8LszRascjospMeWyzyum7zW_-QZM5cTqm5lQ5e7vw_Mw1kckO7snzwpRfRh3WOGtHpvvLNusvF7v5yk-1S4rSZrp8Jrm2yWq2ST4bgEIZQPBA-Y99Aa3SRfs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>FAIM2007 Special Issue: Simulation-based scheduling of assembly operations</title><source>Taylor and Francis Science and Technology Collection</source><source>Access via Business Source (EBSCOhost)</source><creator>Weigert, Gerald ; Henlich, Thomas</creator><creatorcontrib>Weigert, Gerald ; Henlich, Thomas</creatorcontrib><description>The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these processes, several graph methods were developed in the past, i.e. AND/OR-graphs or modified Petri nets, but most of them are static methods and they are not suitable for scheduling tasks. This paper demonstrates, how Timed AND/OR-graphs can be modeled with a common Discrete Event Simulation (DES) system. The objective is a simulation-based scheduling system for assembly processes which is able to improve the prediction of due date keeping as well as to optimize the workflow of the assembly systems.</description><identifier>ISSN: 0951-192X</identifier><identifier>EISSN: 1362-3052</identifier><identifier>DOI: 10.1080/09511920802225914</identifier><language>eng</language><publisher>Taylor & Francis</publisher><ispartof>International journal of computer integrated manufacturing, 2009-04, Vol.22 (4), p.325-333</ispartof><rights>Distributed under a Creative Commons Attribution 4.0 International License</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,314,780,784,885,27924,27925</link.rule.ids><backlink>$$Uhttps://hal.science/hal-00513404$$DView record in HAL$$Hfree_for_read</backlink></links><search><creatorcontrib>Weigert, Gerald</creatorcontrib><creatorcontrib>Henlich, Thomas</creatorcontrib><title>FAIM2007 Special Issue: Simulation-based scheduling of assembly operations</title><title>International journal of computer integrated manufacturing</title><description>The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these processes, several graph methods were developed in the past, i.e. AND/OR-graphs or modified Petri nets, but most of them are static methods and they are not suitable for scheduling tasks. This paper demonstrates, how Timed AND/OR-graphs can be modeled with a common Discrete Event Simulation (DES) system. The objective is a simulation-based scheduling system for assembly processes which is able to improve the prediction of due date keeping as well as to optimize the workflow of the assembly systems.</description><issn>0951-192X</issn><issn>1362-3052</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2009</creationdate><recordtype>article</recordtype><recordid>eNqVys0OwUAUBeCJkKifB7CbrUW5d6aD2okQFVa1sGsGQ0em2vSqxNv7iRewOifnfIz1EAYIExhCqBBD8a5CCBViUGMeypHwJShRZ97n999g32QtoisASjUBj62Xs2grAMY8LszRascjospMeWyzyum7zW_-QZM5cTqm5lQ5e7vw_Mw1kckO7snzwpRfRh3WOGtHpvvLNusvF7v5yk-1S4rSZrp8Jrm2yWq2ST4bgEIZQPBA-Y99Aa3SRfs</recordid><startdate>20090406</startdate><enddate>20090406</enddate><creator>Weigert, Gerald</creator><creator>Henlich, Thomas</creator><general>Taylor & Francis</general><scope>1XC</scope><scope>VOOES</scope></search><sort><creationdate>20090406</creationdate><title>FAIM2007 Special Issue: Simulation-based scheduling of assembly operations</title><author>Weigert, Gerald ; Henlich, Thomas</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-hal_primary_oai_HAL_hal_00513404v13</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2009</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Weigert, Gerald</creatorcontrib><creatorcontrib>Henlich, Thomas</creatorcontrib><collection>Hyper Article en Ligne (HAL)</collection><collection>Hyper Article en Ligne (HAL) (Open Access)</collection><jtitle>International journal of computer integrated manufacturing</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Weigert, Gerald</au><au>Henlich, Thomas</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>FAIM2007 Special Issue: Simulation-based scheduling of assembly operations</atitle><jtitle>International journal of computer integrated manufacturing</jtitle><date>2009-04-06</date><risdate>2009</risdate><volume>22</volume><issue>4</issue><spage>325</spage><epage>333</epage><pages>325-333</pages><issn>0951-192X</issn><eissn>1362-3052</eissn><abstract>The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these processes, several graph methods were developed in the past, i.e. AND/OR-graphs or modified Petri nets, but most of them are static methods and they are not suitable for scheduling tasks. This paper demonstrates, how Timed AND/OR-graphs can be modeled with a common Discrete Event Simulation (DES) system. The objective is a simulation-based scheduling system for assembly processes which is able to improve the prediction of due date keeping as well as to optimize the workflow of the assembly systems.</abstract><pub>Taylor & Francis</pub><doi>10.1080/09511920802225914</doi><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0951-192X |
ispartof | International journal of computer integrated manufacturing, 2009-04, Vol.22 (4), p.325-333 |
issn | 0951-192X 1362-3052 |
language | eng |
recordid | cdi_hal_primary_oai_HAL_hal_00513404v1 |
source | Taylor and Francis Science and Technology Collection; Access via Business Source (EBSCOhost) |
title | FAIM2007 Special Issue: Simulation-based scheduling of assembly operations |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T07%3A55%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-hal&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=FAIM2007%20Special%20Issue:%20Simulation-based%20scheduling%20of%20assembly%20operations&rft.jtitle=International%20journal%20of%20computer%20integrated%20manufacturing&rft.au=Weigert,%20Gerald&rft.date=2009-04-06&rft.volume=22&rft.issue=4&rft.spage=325&rft.epage=333&rft.pages=325-333&rft.issn=0951-192X&rft.eissn=1362-3052&rft_id=info:doi/10.1080/09511920802225914&rft_dat=%3Chal%3Eoai_HAL_hal_00513404v1%3C/hal%3E%3Cgrp_id%3Ecdi_FETCH-hal_primary_oai_HAL_hal_00513404v13%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |