Loading…
Mathematical programming model for centralised master planning in ceramic tile supply chains
The object of this article is to develop a centralised replenishment, production, and distribution model for ceramic tile supply chains. These supply chains are assumed to be multi-item, multi-supplier, multi-facility, multi-type and multi-level distribution centres. The model deals with multi-perio...
Saved in:
Published in: | International journal of production research 2010-09, Vol.48 (17), p.5053-5074 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The object of this article is to develop a centralised replenishment, production, and distribution model for ceramic tile supply chains. These supply chains are assumed to be multi-item, multi-supplier, multi-facility, multi-type and multi-level distribution centres. The model deals with multi-period master planning where sourcing considerations for replenishments, production facilities, and distribution centres are important to maximise an objective function involving the total net profit. This model is deterministic and has been formulated as a mixed-integer linear programming (MILP) model. An example based on modifications of real-world industrial problems is presented. |
---|---|
ISSN: | 0020-7543 1366-588X |
DOI: | 10.1080/00207540903055701 |