Loading…
Scheduling jobs and maintenance activities on parallel machines
In this article, we deal with the problem of scheduling N production jobs on M parallel machines. Each machine should be maintained once during the planning horizon. We consider the case where the maintenance of the machines should start at time zero and the resources that ensure the maintenance are...
Saved in:
Published in: | Operational research 2013-10, Vol.13 (3), p.363-383 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In this article, we deal with the problem of scheduling
N
production jobs on
M
parallel machines. Each machine should be maintained once during the planning horizon. We consider the case where the maintenance of the machines should start at time zero and the resources that ensure the maintenance are not sufficient. For such a reason, the maintenance tasks must be continuously run during the planning horizon. We aim to find a schedule composed of the production jobs and the maintenance tasks for which the total sum of the jobs’ weighted completion times and the preventive maintenance cost are minimized. We optimally solve the problem by an integer linear programming method. We also propose a heuristic method computed in two phases. Computational experiments are performed on randomly generated instances and the results show that the proposed methods produce satisfactory solutions for the problem. |
---|---|
ISSN: | 1109-2858 1866-1505 |
DOI: | 10.1007/s12351-012-0130-1 |