Test scheduling for embedded systems
The paper proposes two approaches to test scheduling. The first one utilizes the concept of TACG (Test Application Conflict Graph). For the testing process the resource utilization model is defined and used for the TACG construction. Different conflicts that must be taken into account during test sc...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The paper proposes two approaches to test scheduling. The first one utilizes the concept of TACG (Test Application Conflict Graph). For the testing process the resource utilization model is defined and used for the TACG construction. Different conflicts that must be taken into account during test scheduling are presented. The paper offers a methodology that can be utilized during embedded test design process, the final goal of which is to reduce the overall test application time and power consumption during the test application. The second methodology is based on optimising the test schedule - the test application time, TAM width and power consumption are taken into account during the process. The goal of the methodology is a reasonable trade-off between these parameters. |
---|---|
DOI: | 10.1109/DSD.2003.1231985 |