Loading…
Proton Extraction and Transport for Pbar Production in Tevatron I
The design, fabrication, and commissioning of the extraction and beam transport systems required for pbar production for the FNAL Antiproton Source will be described. The extraction system utilizes a fast kicker and Lambertson septum magnets to extract in a single turn one booster batch of 120 GeV p...
Saved in:
Published in: | IEEE transactions on nuclear science 1985-10, Vol.32 (5), p.3009-3011 |
---|---|
Main Authors: | , , , , , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The design, fabrication, and commissioning of the extraction and beam transport systems required for pbar production for the FNAL Antiproton Source will be described. The extraction system utilizes a fast kicker and Lambertson septum magnets to extract in a single turn one booster batch of 120 GeV protons from the FNAL Main Ring. The extracted beam is transported a distance of 174 m by a beam transport system consisting of 12 dipoles and 14 quadrupoles. The last 8 quadrupoles are configured as 4 pairs which focus the beam to a small round spot (radius 0.4 mm) on a pbar production target. The extraction channel is also designed to inject 8 GeV cooled pbars from the Accumulator Ring into the Main Ring, or extract 8 GeV protons from the Main Ring for diagnostic and tune-up work in the Antiproton Source beam lines and rings. |
---|---|
ISSN: | 0018-9499 1558-1578 |
DOI: | 10.1109/TNS.1985.4334257 |