Loading…

Proton Extraction and Transport for Pbar Production in Tevatron I

The design, fabrication, and commissioning of the extraction and beam transport systems required for pbar production for the FNAL Antiproton Source will be described. The extraction system utilizes a fast kicker and Lambertson septum magnets to extract in a single turn one booster batch of 120 GeV p...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on nuclear science 1985-10, Vol.32 (5), p.3009-3011
Main Authors: Dugan, G., Harrison, M., Johnson, D., Dinkel, J., Krafczyk, G., May, M., Merz, W., McCarthy, J., Tilles, E.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The design, fabrication, and commissioning of the extraction and beam transport systems required for pbar production for the FNAL Antiproton Source will be described. The extraction system utilizes a fast kicker and Lambertson septum magnets to extract in a single turn one booster batch of 120 GeV protons from the FNAL Main Ring. The extracted beam is transported a distance of 174 m by a beam transport system consisting of 12 dipoles and 14 quadrupoles. The last 8 quadrupoles are configured as 4 pairs which focus the beam to a small round spot (radius 0.4 mm) on a pbar production target. The extraction channel is also designed to inject 8 GeV cooled pbars from the Accumulator Ring into the Main Ring, or extract 8 GeV protons from the Main Ring for diagnostic and tune-up work in the Antiproton Source beam lines and rings.
ISSN:0018-9499
1558-1578
DOI:10.1109/TNS.1985.4334257