A new formula to "Estimate At Completion" of a Project's time to improve "Earned Value Management System"
This paper presents a new method for estimate at completion (EAC) of project's time to improve earned value management system (EVMS). The new formula established consists of four variables: scheduled performance index (SPI), scheduled percent complete by duration (SPCD), actual percent complete...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This paper presents a new method for estimate at completion (EAC) of project's time to improve earned value management system (EVMS). The new formula established consists of four variables: scheduled performance index (SPI), scheduled percent complete by duration (SPCD), actual percent complete by duration (APCD), and sum of durations to due time (SDDT). The model has been validated by a simulation study using a progress generator program for typical RCPS problem project library. This program was developed in VBA-MSP and it included some basic assumptions and data were generated day by day randomly. The results show a strong linear relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation. |
---|---|
ISSN: | 2157-3611 2157-362X |
DOI: | 10.1109/IEEM.2007.4419345 |