A new formula to "Estimate At Completion" of a Project's time to improve "Earned Value Management System"

This paper presents a new method for estimate at completion (EAC) of project's time to improve earned value management system (EVMS). The new formula established consists of four variables: scheduled performance index (SPI), scheduled percent complete by duration (SPCD), actual percent complete...

Full description

Saved in:
Bibliographic Details
Main Authors: Iranmanesh, H., Mojir, N., Kimiagari, S.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper presents a new method for estimate at completion (EAC) of project's time to improve earned value management system (EVMS). The new formula established consists of four variables: scheduled performance index (SPI), scheduled percent complete by duration (SPCD), actual percent complete by duration (APCD), and sum of durations to due time (SDDT). The model has been validated by a simulation study using a progress generator program for typical RCPS problem project library. This program was developed in VBA-MSP and it included some basic assumptions and data were generated day by day randomly. The results show a strong linear relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.
ISSN:2157-3611
2157-362X
DOI:10.1109/IEEM.2007.4419345