Loading…
Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management
A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving align...
Saved in:
Main Authors: | , , , , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 15 |
container_issue | |
container_start_page | 3 |
container_title | |
container_volume | |
creator | Pourshahid, A. Amyot, D. Peyton, L. Ghanavati, S. Pengfei Chen Weiss, M. Forster, A.J. |
description | A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach. |
doi_str_mv | 10.1109/MCETECH.2008.30 |
format | conference_proceeding |
fullrecord | <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_4483413</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4483413</ieee_id><sourcerecordid>4483413</sourcerecordid><originalsourceid>FETCH-ieee_primary_44834133</originalsourceid><addsrcrecordid>eNp9i0FLw0AQRhdKQW1z9uBl_oDpJBub3ashpR4qIum5DGZaVpvdOrul-O-N4tnv8vh4PKVuC8yLAu1i07Rd26zzEtHkGicqs7XBemkfNJpyOVU3o6mttpXBK5XF-I7jxluX5bWiLlxIeiAPTz7xQShxD9vIAq_8eXbCA_sU4TkkSi54WAkNfAnyMSY9dCEcYR_k8Ryd5xjhRcLbDzfk6fDbztV0T8fI2R9n6m7Vds363jHz7iRuIPnaVZXRVaH1__YbPk1H8w</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Pourshahid, A. ; Amyot, D. ; Peyton, L. ; Ghanavati, S. ; Pengfei Chen ; Weiss, M. ; Forster, A.J.</creator><creatorcontrib>Pourshahid, A. ; Amyot, D. ; Peyton, L. ; Ghanavati, S. ; Pengfei Chen ; Weiss, M. ; Forster, A.J.</creatorcontrib><description>A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach.</description><identifier>ISBN: 9780769530826</identifier><identifier>ISBN: 0769530826</identifier><identifier>DOI: 10.1109/MCETECH.2008.30</identifier><identifier>LCCN: 2007939480</identifier><language>eng</language><publisher>IEEE</publisher><subject>Bismuth ; Business ; Business Process Management ; Conference management ; Data warehouses ; Goal-oriented Modelling ; Iterative methods ; jUCMNav ; Key Performance Indicator ; Management information systems ; Measurement ; Medical services ; Monitoring ; Quality management ; User Requirements Notation</subject><ispartof>2008 International MCETECH Conference on e-Technologies (mcetech 2008), 2008, p.3-15</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4483413$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,2058,27925,54920</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/4483413$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Pourshahid, A.</creatorcontrib><creatorcontrib>Amyot, D.</creatorcontrib><creatorcontrib>Peyton, L.</creatorcontrib><creatorcontrib>Ghanavati, S.</creatorcontrib><creatorcontrib>Pengfei Chen</creatorcontrib><creatorcontrib>Weiss, M.</creatorcontrib><creatorcontrib>Forster, A.J.</creatorcontrib><title>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</title><title>2008 International MCETECH Conference on e-Technologies (mcetech 2008)</title><addtitle>MCETECH</addtitle><description>A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach.</description><subject>Bismuth</subject><subject>Business</subject><subject>Business Process Management</subject><subject>Conference management</subject><subject>Data warehouses</subject><subject>Goal-oriented Modelling</subject><subject>Iterative methods</subject><subject>jUCMNav</subject><subject>Key Performance Indicator</subject><subject>Management information systems</subject><subject>Measurement</subject><subject>Medical services</subject><subject>Monitoring</subject><subject>Quality management</subject><subject>User Requirements Notation</subject><isbn>9780769530826</isbn><isbn>0769530826</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2008</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><recordid>eNp9i0FLw0AQRhdKQW1z9uBl_oDpJBub3ashpR4qIum5DGZaVpvdOrul-O-N4tnv8vh4PKVuC8yLAu1i07Rd26zzEtHkGicqs7XBemkfNJpyOVU3o6mttpXBK5XF-I7jxluX5bWiLlxIeiAPTz7xQShxD9vIAq_8eXbCA_sU4TkkSi54WAkNfAnyMSY9dCEcYR_k8Ryd5xjhRcLbDzfk6fDbztV0T8fI2R9n6m7Vds363jHz7iRuIPnaVZXRVaH1__YbPk1H8w</recordid><startdate>200801</startdate><enddate>200801</enddate><creator>Pourshahid, A.</creator><creator>Amyot, D.</creator><creator>Peyton, L.</creator><creator>Ghanavati, S.</creator><creator>Pengfei Chen</creator><creator>Weiss, M.</creator><creator>Forster, A.J.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>200801</creationdate><title>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</title><author>Pourshahid, A. ; Amyot, D. ; Peyton, L. ; Ghanavati, S. ; Pengfei Chen ; Weiss, M. ; Forster, A.J.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-ieee_primary_44834133</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2008</creationdate><topic>Bismuth</topic><topic>Business</topic><topic>Business Process Management</topic><topic>Conference management</topic><topic>Data warehouses</topic><topic>Goal-oriented Modelling</topic><topic>Iterative methods</topic><topic>jUCMNav</topic><topic>Key Performance Indicator</topic><topic>Management information systems</topic><topic>Measurement</topic><topic>Medical services</topic><topic>Monitoring</topic><topic>Quality management</topic><topic>User Requirements Notation</topic><toplevel>online_resources</toplevel><creatorcontrib>Pourshahid, A.</creatorcontrib><creatorcontrib>Amyot, D.</creatorcontrib><creatorcontrib>Peyton, L.</creatorcontrib><creatorcontrib>Ghanavati, S.</creatorcontrib><creatorcontrib>Pengfei Chen</creatorcontrib><creatorcontrib>Weiss, M.</creatorcontrib><creatorcontrib>Forster, A.J.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Xplore</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Pourshahid, A.</au><au>Amyot, D.</au><au>Peyton, L.</au><au>Ghanavati, S.</au><au>Pengfei Chen</au><au>Weiss, M.</au><au>Forster, A.J.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</atitle><btitle>2008 International MCETECH Conference on e-Technologies (mcetech 2008)</btitle><stitle>MCETECH</stitle><date>2008-01</date><risdate>2008</risdate><spage>3</spage><epage>15</epage><pages>3-15</pages><isbn>9780769530826</isbn><isbn>0769530826</isbn><abstract>A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach.</abstract><pub>IEEE</pub><doi>10.1109/MCETECH.2008.30</doi></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISBN: 9780769530826 |
ispartof | 2008 International MCETECH Conference on e-Technologies (mcetech 2008), 2008, p.3-15 |
issn | |
language | eng |
recordid | cdi_ieee_primary_4483413 |
source | IEEE Electronic Library (IEL) Conference Proceedings |
subjects | Bismuth Business Business Process Management Conference management Data warehouses Goal-oriented Modelling Iterative methods jUCMNav Key Performance Indicator Management information systems Measurement Medical services Monitoring Quality management User Requirements Notation |
title | Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T13%3A47%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Toward%20an%20Integrated%20User%20Requirements%20Notation%20Framework%20and%20Tool%20forBusiness%20Process%20Management&rft.btitle=2008%20International%20MCETECH%20Conference%20on%20e-Technologies%20(mcetech%202008)&rft.au=Pourshahid,%20A.&rft.date=2008-01&rft.spage=3&rft.epage=15&rft.pages=3-15&rft.isbn=9780769530826&rft.isbn_list=0769530826&rft_id=info:doi/10.1109/MCETECH.2008.30&rft_dat=%3Cieee_6IE%3E4483413%3C/ieee_6IE%3E%3Cgrp_id%3Ecdi_FETCH-ieee_primary_44834133%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=4483413&rfr_iscdi=true |