Loading…

Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management

A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving align...

Full description

Saved in:
Bibliographic Details
Main Authors: Pourshahid, A., Amyot, D., Peyton, L., Ghanavati, S., Pengfei Chen, Weiss, M., Forster, A.J.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 15
container_issue
container_start_page 3
container_title
container_volume
creator Pourshahid, A.
Amyot, D.
Peyton, L.
Ghanavati, S.
Pengfei Chen
Weiss, M.
Forster, A.J.
description A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach.
doi_str_mv 10.1109/MCETECH.2008.30
format conference_proceeding
fullrecord <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_4483413</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4483413</ieee_id><sourcerecordid>4483413</sourcerecordid><originalsourceid>FETCH-ieee_primary_44834133</originalsourceid><addsrcrecordid>eNp9i0FLw0AQRhdKQW1z9uBl_oDpJBub3ashpR4qIum5DGZaVpvdOrul-O-N4tnv8vh4PKVuC8yLAu1i07Rd26zzEtHkGicqs7XBemkfNJpyOVU3o6mttpXBK5XF-I7jxluX5bWiLlxIeiAPTz7xQShxD9vIAq_8eXbCA_sU4TkkSi54WAkNfAnyMSY9dCEcYR_k8Ryd5xjhRcLbDzfk6fDbztV0T8fI2R9n6m7Vds363jHz7iRuIPnaVZXRVaH1__YbPk1H8w</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Pourshahid, A. ; Amyot, D. ; Peyton, L. ; Ghanavati, S. ; Pengfei Chen ; Weiss, M. ; Forster, A.J.</creator><creatorcontrib>Pourshahid, A. ; Amyot, D. ; Peyton, L. ; Ghanavati, S. ; Pengfei Chen ; Weiss, M. ; Forster, A.J.</creatorcontrib><description>A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach.</description><identifier>ISBN: 9780769530826</identifier><identifier>ISBN: 0769530826</identifier><identifier>DOI: 10.1109/MCETECH.2008.30</identifier><identifier>LCCN: 2007939480</identifier><language>eng</language><publisher>IEEE</publisher><subject>Bismuth ; Business ; Business Process Management ; Conference management ; Data warehouses ; Goal-oriented Modelling ; Iterative methods ; jUCMNav ; Key Performance Indicator ; Management information systems ; Measurement ; Medical services ; Monitoring ; Quality management ; User Requirements Notation</subject><ispartof>2008 International MCETECH Conference on e-Technologies (mcetech 2008), 2008, p.3-15</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4483413$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,2058,27925,54920</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/4483413$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Pourshahid, A.</creatorcontrib><creatorcontrib>Amyot, D.</creatorcontrib><creatorcontrib>Peyton, L.</creatorcontrib><creatorcontrib>Ghanavati, S.</creatorcontrib><creatorcontrib>Pengfei Chen</creatorcontrib><creatorcontrib>Weiss, M.</creatorcontrib><creatorcontrib>Forster, A.J.</creatorcontrib><title>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</title><title>2008 International MCETECH Conference on e-Technologies (mcetech 2008)</title><addtitle>MCETECH</addtitle><description>A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach.</description><subject>Bismuth</subject><subject>Business</subject><subject>Business Process Management</subject><subject>Conference management</subject><subject>Data warehouses</subject><subject>Goal-oriented Modelling</subject><subject>Iterative methods</subject><subject>jUCMNav</subject><subject>Key Performance Indicator</subject><subject>Management information systems</subject><subject>Measurement</subject><subject>Medical services</subject><subject>Monitoring</subject><subject>Quality management</subject><subject>User Requirements Notation</subject><isbn>9780769530826</isbn><isbn>0769530826</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2008</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><recordid>eNp9i0FLw0AQRhdKQW1z9uBl_oDpJBub3ashpR4qIum5DGZaVpvdOrul-O-N4tnv8vh4PKVuC8yLAu1i07Rd26zzEtHkGicqs7XBemkfNJpyOVU3o6mttpXBK5XF-I7jxluX5bWiLlxIeiAPTz7xQShxD9vIAq_8eXbCA_sU4TkkSi54WAkNfAnyMSY9dCEcYR_k8Ryd5xjhRcLbDzfk6fDbztV0T8fI2R9n6m7Vds363jHz7iRuIPnaVZXRVaH1__YbPk1H8w</recordid><startdate>200801</startdate><enddate>200801</enddate><creator>Pourshahid, A.</creator><creator>Amyot, D.</creator><creator>Peyton, L.</creator><creator>Ghanavati, S.</creator><creator>Pengfei Chen</creator><creator>Weiss, M.</creator><creator>Forster, A.J.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>200801</creationdate><title>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</title><author>Pourshahid, A. ; Amyot, D. ; Peyton, L. ; Ghanavati, S. ; Pengfei Chen ; Weiss, M. ; Forster, A.J.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-ieee_primary_44834133</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2008</creationdate><topic>Bismuth</topic><topic>Business</topic><topic>Business Process Management</topic><topic>Conference management</topic><topic>Data warehouses</topic><topic>Goal-oriented Modelling</topic><topic>Iterative methods</topic><topic>jUCMNav</topic><topic>Key Performance Indicator</topic><topic>Management information systems</topic><topic>Measurement</topic><topic>Medical services</topic><topic>Monitoring</topic><topic>Quality management</topic><topic>User Requirements Notation</topic><toplevel>online_resources</toplevel><creatorcontrib>Pourshahid, A.</creatorcontrib><creatorcontrib>Amyot, D.</creatorcontrib><creatorcontrib>Peyton, L.</creatorcontrib><creatorcontrib>Ghanavati, S.</creatorcontrib><creatorcontrib>Pengfei Chen</creatorcontrib><creatorcontrib>Weiss, M.</creatorcontrib><creatorcontrib>Forster, A.J.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Xplore</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Pourshahid, A.</au><au>Amyot, D.</au><au>Peyton, L.</au><au>Ghanavati, S.</au><au>Pengfei Chen</au><au>Weiss, M.</au><au>Forster, A.J.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management</atitle><btitle>2008 International MCETECH Conference on e-Technologies (mcetech 2008)</btitle><stitle>MCETECH</stitle><date>2008-01</date><risdate>2008</risdate><spage>3</spage><epage>15</epage><pages>3-15</pages><isbn>9780769530826</isbn><isbn>0769530826</isbn><abstract>A number of recent initiatives in both academia and industry have sought to achieve improvements in e- businesses through the utilization of Business Process Management (BPM) methodologies and tools. However there are still some inadequacies that need to be addressed when it comes to achieving alignment between business goals and business processes. The User Requirements Notation (URN) has some unique features and capabilities beyond what is available in other notations that can help address alignment issues. In this paper, a URN-based framework and its supporting toolset are introduced which provide business process monitoring and performance management capabilities integrated across the BPM lifecycle. The framework extends the URN notation with Key Performance Indicators (KPI) and other concepts to measure, and align processes and goals. A healthcare case study is used to illustrate and evaluate the framework. Early results indicate the feasibility of the approach.</abstract><pub>IEEE</pub><doi>10.1109/MCETECH.2008.30</doi></addata></record>
fulltext fulltext_linktorsrc
identifier ISBN: 9780769530826
ispartof 2008 International MCETECH Conference on e-Technologies (mcetech 2008), 2008, p.3-15
issn
language eng
recordid cdi_ieee_primary_4483413
source IEEE Electronic Library (IEL) Conference Proceedings
subjects Bismuth
Business
Business Process Management
Conference management
Data warehouses
Goal-oriented Modelling
Iterative methods
jUCMNav
Key Performance Indicator
Management information systems
Measurement
Medical services
Monitoring
Quality management
User Requirements Notation
title Toward an Integrated User Requirements Notation Framework and Tool forBusiness Process Management
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T13%3A47%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Toward%20an%20Integrated%20User%20Requirements%20Notation%20Framework%20and%20Tool%20forBusiness%20Process%20Management&rft.btitle=2008%20International%20MCETECH%20Conference%20on%20e-Technologies%20(mcetech%202008)&rft.au=Pourshahid,%20A.&rft.date=2008-01&rft.spage=3&rft.epage=15&rft.pages=3-15&rft.isbn=9780769530826&rft.isbn_list=0769530826&rft_id=info:doi/10.1109/MCETECH.2008.30&rft_dat=%3Cieee_6IE%3E4483413%3C/ieee_6IE%3E%3Cgrp_id%3Ecdi_FETCH-ieee_primary_44834133%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=4483413&rfr_iscdi=true