Loading…
Using Automated Event Handling for a Simulation-Based Process Coverage in Supply Networks
The project AC/DC, funded by the European Commission (contract number FP6-SST-031520), deals with new logistical concepts for planning and control of supply networks that enhance automotive manufacturing radically. To handle upcoming disturbances within the regarded supply network structure, a real-...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The project AC/DC, funded by the European Commission (contract number FP6-SST-031520), deals with new logistical concepts for planning and control of supply networks that enhance automotive manufacturing radically. To handle upcoming disturbances within the regarded supply network structure, a real-time event management system is developed in order to automatically handle occurring events in a highly reactive way based on reliable processes. The simulation-based approach of identification, classification and especially the automated evaluation of handling actions are introduced in this paper. |
---|---|
DOI: | 10.1109/UKSIM.2008.57 |