Loading…

Update of the Z Refurbishment project (ZR) at Sandia National Laboratories

Sandia's Z Refurbishment (ZR) Project formally began in February 2002 to increase the Z Accelerator's utilization by providing the capability to perform more shots, improve precision and pulse shape variability, and increase delivered current. A project update was provided at the 15th Inte...

Full description

Saved in:
Bibliographic Details
Main Authors: Weinbrecht, E.A., Bloomquist, D.D., McDaniel, D.H., McKee, G.R., Donovan, G.L., Weed, J.W., Faturos, T.V., Tabor, D.A., Moncayo, C.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Sandia's Z Refurbishment (ZR) Project formally began in February 2002 to increase the Z Accelerator's utilization by providing the capability to perform more shots, improve precision and pulse shape variability, and increase delivered current. A project update was provided at the 15th International Pulsed Power Conference in 2005 [1]. The Z facility was shut down in July 2006 for structural/infrastructure modifications and installation of new pulsed power systems. The refurbishment will conclude in 2007. This paper provides a status update of the project covering the past 2 years of activities.
ISSN:2158-4915
2158-4923
DOI:10.1109/PPPS.2007.4652353