Loading…
Update of the Z Refurbishment project (ZR) at Sandia National Laboratories
Sandia's Z Refurbishment (ZR) Project formally began in February 2002 to increase the Z Accelerator's utilization by providing the capability to perform more shots, improve precision and pulse shape variability, and increase delivered current. A project update was provided at the 15th Inte...
Saved in:
Main Authors: | , , , , , , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Sandia's Z Refurbishment (ZR) Project formally began in February 2002 to increase the Z Accelerator's utilization by providing the capability to perform more shots, improve precision and pulse shape variability, and increase delivered current. A project update was provided at the 15th International Pulsed Power Conference in 2005 [1]. The Z facility was shut down in July 2006 for structural/infrastructure modifications and installation of new pulsed power systems. The refurbishment will conclude in 2007. This paper provides a status update of the project covering the past 2 years of activities. |
---|---|
ISSN: | 2158-4915 2158-4923 |
DOI: | 10.1109/PPPS.2007.4652353 |