Loading…
Conversion of a 2-terminal-pair bridge to a 4-terminal-pair bridge for increased range and precision in impedance measurements
A new 4-terminal-pair bridge, capable of a relative uncertainty of 1 in 10/sup 9/, has been constructed at NIST by converting a 2-terminal pair bridge. The conversion requires only addition of components which are easily removed if 2-pair measurements are to be made. The design and testing of this b...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | A new 4-terminal-pair bridge, capable of a relative uncertainty of 1 in 10/sup 9/, has been constructed at NIST by converting a 2-terminal pair bridge. The conversion requires only addition of components which are easily removed if 2-pair measurements are to be made. The design and testing of this bridge are described. |
---|---|
DOI: | 10.1109/CPEM.1996.547113 |