Loading…

Conversion of a 2-terminal-pair bridge to a 4-terminal-pair bridge for increased range and precision in impedance measurements

A new 4-terminal-pair bridge, capable of a relative uncertainty of 1 in 10/sup 9/, has been constructed at NIST by converting a 2-terminal pair bridge. The conversion requires only addition of components which are easily removed if 2-pair measurements are to be made. The design and testing of this b...

Full description

Saved in:
Bibliographic Details
Main Authors: Jeffery, A., Shields, J.Q., Lee, L.H.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:A new 4-terminal-pair bridge, capable of a relative uncertainty of 1 in 10/sup 9/, has been constructed at NIST by converting a 2-terminal pair bridge. The conversion requires only addition of components which are easily removed if 2-pair measurements are to be made. The design and testing of this bridge are described.
DOI:10.1109/CPEM.1996.547113