Widening the bottleneck: Increasing the utilisation of long distance AC transmission corridors
This paper considers the challenges faced by power system planners and operators with regards to heavily loaded transmission corridors which constrain power flows within the AC system, that is, they are `bottlenecks' within the AC system. Particular reference is made to long distance inter-area...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This paper considers the challenges faced by power system planners and operators with regards to heavily loaded transmission corridors which constrain power flows within the AC system, that is, they are `bottlenecks' within the AC system. Particular reference is made to long distance inter-area AC transmission lines. The addition of back-to-back HVDC schemes within these AC transmission circuits is considered and the benefits that could be realised are reviewed with some qualitative examples. |
---|---|
ISSN: | 2160-8555 2160-8563 |
DOI: | 10.1109/TDC.2010.5484390 |