Loading…
Manufacturer-Supplier Requirements Synchronization Using Exchange Containers and Multi-Level Systems
Manufacturer-supplier requirements synchronization, i.e. the systematic and repeated exchange of requirements between manufacturer and supplier, is of high practical relevance but is proving difficult in industrial practice. We motivate the problem and discuss the technical and methodological shortc...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Manufacturer-supplier requirements synchronization, i.e. the systematic and repeated exchange of requirements between manufacturer and supplier, is of high practical relevance but is proving difficult in industrial practice. We motivate the problem and discuss the technical and methodological shortcomings of current practices based on document generation and standardized exchange formats. We then present and discuss a new solution for manufacturer-supplier requirements synchronization based on the use of exchange containers and multi-level requirements systems. The solution is illustrated by an implementation in the tool Rational DOORS using RIF exchange and the DOORS-MuLe extension. |
---|---|
ISSN: | 1090-705X 2332-6441 |
DOI: | 10.1109/RE.2010.46 |