Loading…

Precise laying of observation cable system

A demand for laying an observation cable system on a planned route position precisely has become higher and higher. JOGMEC, JGI, OCC and KCS carried out a methane hydrate dissociation monitoring survey under the seabed by using DSS (Deep-sea Seismic System) last year. The laying position of the seis...

Full description

Saved in:
Bibliographic Details
Main Authors: Okatake, Y., Fujii, Y., Nasu, M., Ikeuchi, A., Takahashi, H., Asakawa, E.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 4
container_issue
container_start_page 1
container_title
container_volume
creator Okatake, Y.
Fujii, Y.
Nasu, M.
Ikeuchi, A.
Takahashi, H.
Asakawa, E.
description A demand for laying an observation cable system on a planned route position precisely has become higher and higher. JOGMEC, JGI, OCC and KCS carried out a methane hydrate dissociation monitoring survey under the seabed by using DSS (Deep-sea Seismic System) last year. The laying position of the seismometer located in the central of the DSS was required to lay at a distance of 40 m from the methane hydrate production well at the water depth of about 1,000 m. KCS has successfully achieved the DSS laying within the targeted deviation. The paper describes the details of the developed simulation system and successful laying / burial operation.
doi_str_mv 10.1109/UT.2013.6519856
format conference_proceeding
fullrecord <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_6519856</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>6519856</ieee_id><sourcerecordid>6519856</sourcerecordid><originalsourceid>FETCH-LOGICAL-i175t-8c13aa99dbcf922e5d41ac4396e2033abd46cf370213d329c027799b353bb9f53</originalsourceid><addsrcrecordid>eNpFj01Lw0AURUdEUGvXLtzMWkicN28-8pZStAoFXbTrMjN5kZG0kUwQ8u8VLLi6nMU5cIW4BVUDKHrYbWutAGtngRrrzsQ1GOfRkiE4_4cGL8WylE-l1K_mlW-uxP37yCkXln2Y8_FDDp0cYuHxO0x5OMoUYs-yzGXiw4246EJfeHnahdg9P21XL9Xmbf26etxUGbydqiYBhkDUxtSR1mxbAyEZJMdaIYbYGpc69EoDtqgpKe09UUSLMVJncSHu_rqZmfdfYz6Ecd6fvuEPjqtA_g</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Precise laying of observation cable system</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Okatake, Y. ; Fujii, Y. ; Nasu, M. ; Ikeuchi, A. ; Takahashi, H. ; Asakawa, E.</creator><creatorcontrib>Okatake, Y. ; Fujii, Y. ; Nasu, M. ; Ikeuchi, A. ; Takahashi, H. ; Asakawa, E.</creatorcontrib><description>A demand for laying an observation cable system on a planned route position precisely has become higher and higher. JOGMEC, JGI, OCC and KCS carried out a methane hydrate dissociation monitoring survey under the seabed by using DSS (Deep-sea Seismic System) last year. The laying position of the seismometer located in the central of the DSS was required to lay at a distance of 40 m from the methane hydrate production well at the water depth of about 1,000 m. KCS has successfully achieved the DSS laying within the targeted deviation. The paper describes the details of the developed simulation system and successful laying / burial operation.</description><identifier>ISBN: 1467359483</identifier><identifier>ISBN: 9781467359481</identifier><identifier>EISBN: 1467359491</identifier><identifier>EISBN: 9781467359498</identifier><identifier>EISBN: 9781467359474</identifier><identifier>EISBN: 1467359475</identifier><identifier>DOI: 10.1109/UT.2013.6519856</identifier><language>eng</language><publisher>IEEE</publisher><subject>Communication cables ; Decision support systems ; Marine vehicles ; Production ; Real-time systems ; Transponders ; Underwater cables</subject><ispartof>2013 IEEE International Underwater Technology Symposium (UT), 2013, p.1-4</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/6519856$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,2058,27925,54920</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/6519856$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Okatake, Y.</creatorcontrib><creatorcontrib>Fujii, Y.</creatorcontrib><creatorcontrib>Nasu, M.</creatorcontrib><creatorcontrib>Ikeuchi, A.</creatorcontrib><creatorcontrib>Takahashi, H.</creatorcontrib><creatorcontrib>Asakawa, E.</creatorcontrib><title>Precise laying of observation cable system</title><title>2013 IEEE International Underwater Technology Symposium (UT)</title><addtitle>UT</addtitle><description>A demand for laying an observation cable system on a planned route position precisely has become higher and higher. JOGMEC, JGI, OCC and KCS carried out a methane hydrate dissociation monitoring survey under the seabed by using DSS (Deep-sea Seismic System) last year. The laying position of the seismometer located in the central of the DSS was required to lay at a distance of 40 m from the methane hydrate production well at the water depth of about 1,000 m. KCS has successfully achieved the DSS laying within the targeted deviation. The paper describes the details of the developed simulation system and successful laying / burial operation.</description><subject>Communication cables</subject><subject>Decision support systems</subject><subject>Marine vehicles</subject><subject>Production</subject><subject>Real-time systems</subject><subject>Transponders</subject><subject>Underwater cables</subject><isbn>1467359483</isbn><isbn>9781467359481</isbn><isbn>1467359491</isbn><isbn>9781467359498</isbn><isbn>9781467359474</isbn><isbn>1467359475</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2013</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><recordid>eNpFj01Lw0AURUdEUGvXLtzMWkicN28-8pZStAoFXbTrMjN5kZG0kUwQ8u8VLLi6nMU5cIW4BVUDKHrYbWutAGtngRrrzsQ1GOfRkiE4_4cGL8WylE-l1K_mlW-uxP37yCkXln2Y8_FDDp0cYuHxO0x5OMoUYs-yzGXiw4246EJfeHnahdg9P21XL9Xmbf26etxUGbydqiYBhkDUxtSR1mxbAyEZJMdaIYbYGpc69EoDtqgpKe09UUSLMVJncSHu_rqZmfdfYz6Ecd6fvuEPjqtA_g</recordid><startdate>201303</startdate><enddate>201303</enddate><creator>Okatake, Y.</creator><creator>Fujii, Y.</creator><creator>Nasu, M.</creator><creator>Ikeuchi, A.</creator><creator>Takahashi, H.</creator><creator>Asakawa, E.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>201303</creationdate><title>Precise laying of observation cable system</title><author>Okatake, Y. ; Fujii, Y. ; Nasu, M. ; Ikeuchi, A. ; Takahashi, H. ; Asakawa, E.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i175t-8c13aa99dbcf922e5d41ac4396e2033abd46cf370213d329c027799b353bb9f53</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2013</creationdate><topic>Communication cables</topic><topic>Decision support systems</topic><topic>Marine vehicles</topic><topic>Production</topic><topic>Real-time systems</topic><topic>Transponders</topic><topic>Underwater cables</topic><toplevel>online_resources</toplevel><creatorcontrib>Okatake, Y.</creatorcontrib><creatorcontrib>Fujii, Y.</creatorcontrib><creatorcontrib>Nasu, M.</creatorcontrib><creatorcontrib>Ikeuchi, A.</creatorcontrib><creatorcontrib>Takahashi, H.</creatorcontrib><creatorcontrib>Asakawa, E.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Okatake, Y.</au><au>Fujii, Y.</au><au>Nasu, M.</au><au>Ikeuchi, A.</au><au>Takahashi, H.</au><au>Asakawa, E.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Precise laying of observation cable system</atitle><btitle>2013 IEEE International Underwater Technology Symposium (UT)</btitle><stitle>UT</stitle><date>2013-03</date><risdate>2013</risdate><spage>1</spage><epage>4</epage><pages>1-4</pages><isbn>1467359483</isbn><isbn>9781467359481</isbn><eisbn>1467359491</eisbn><eisbn>9781467359498</eisbn><eisbn>9781467359474</eisbn><eisbn>1467359475</eisbn><abstract>A demand for laying an observation cable system on a planned route position precisely has become higher and higher. JOGMEC, JGI, OCC and KCS carried out a methane hydrate dissociation monitoring survey under the seabed by using DSS (Deep-sea Seismic System) last year. The laying position of the seismometer located in the central of the DSS was required to lay at a distance of 40 m from the methane hydrate production well at the water depth of about 1,000 m. KCS has successfully achieved the DSS laying within the targeted deviation. The paper describes the details of the developed simulation system and successful laying / burial operation.</abstract><pub>IEEE</pub><doi>10.1109/UT.2013.6519856</doi><tpages>4</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier ISBN: 1467359483
ispartof 2013 IEEE International Underwater Technology Symposium (UT), 2013, p.1-4
issn
language eng
recordid cdi_ieee_primary_6519856
source IEEE Electronic Library (IEL) Conference Proceedings
subjects Communication cables
Decision support systems
Marine vehicles
Production
Real-time systems
Transponders
Underwater cables
title Precise laying of observation cable system
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T15%3A01%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Precise%20laying%20of%20observation%20cable%20system&rft.btitle=2013%20IEEE%20International%20Underwater%20Technology%20Symposium%20(UT)&rft.au=Okatake,%20Y.&rft.date=2013-03&rft.spage=1&rft.epage=4&rft.pages=1-4&rft.isbn=1467359483&rft.isbn_list=9781467359481&rft_id=info:doi/10.1109/UT.2013.6519856&rft.eisbn=1467359491&rft.eisbn_list=9781467359498&rft.eisbn_list=9781467359474&rft.eisbn_list=1467359475&rft_dat=%3Cieee_6IE%3E6519856%3C/ieee_6IE%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-i175t-8c13aa99dbcf922e5d41ac4396e2033abd46cf370213d329c027799b353bb9f53%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=6519856&rfr_iscdi=true