Loading…

Solving Technical Problems on the Full-Bridge Single-Stage PFCs

AC-DC conversion with power factor correction using full-bridge single-stage (FBSS) converters may introduce various complex operating limits and control problems that are not usually described in literature. This is mainly due to the fact that they devaluate and restrict the number of applications...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on industrial electronics (1982) 2014-05, Vol.61 (5), p.2264-2277
Main Authors: Ribeiro, Hugo Santos, Borges, Beatriz Vieira
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:AC-DC conversion with power factor correction using full-bridge single-stage (FBSS) converters may introduce various complex operating limits and control problems that are not usually described in literature. This is mainly due to the fact that they devaluate and restrict the number of applications of those topologies. These problems are identified as primary transformer saturation and output voltage perturbations. The operation at light loads and with wide load variation is also a complex issue that leads to uncontrollable input current and dc bus voltage. This paper clarifies such technical problems referring their impact in the FBSS topologies operation, and presents design criteria and control solutions to minimize their effects. A low cost free wheeling circuit (FWC) that allows null input current to solve the light load operation problem is also presented.
ISSN:0278-0046
1557-9948
DOI:10.1109/TIE.2013.2271594