Loading…
Distributed hybrid constraint handling in large scale virtual power plants
In many virtual power plant (VPP) scenarios, numerous individually configured units within a VPP have to be scheduled regarding both global constraints (i.e. external market demands) and local constraints (i.e. technical, economical or ecological aspects for each unit). Approaches for global and loc...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In many virtual power plant (VPP) scenarios, numerous individually configured units within a VPP have to be scheduled regarding both global constraints (i.e. external market demands) and local constraints (i.e. technical, economical or ecological aspects for each unit). Approaches for global and local constraint handling have been discussed in the relevant literature independently. A hybrid approach is proposed that combines a decentralized combinatorial optimization heuristic with the encoding of individually constrained search spaces into unconstrained representations by means of support vector data description. The approach is applied to simulated VPP. |
---|---|
ISSN: | 2165-4816 2165-4824 |
DOI: | 10.1109/ISGTEurope.2013.6695312 |