Loading…

Machining and brazing of accelerating RF cavity

BARC has been developed 2856 MHz accelerating cavities for 6 MeV, 9 MeV and 10 MeV RF Linac. New vendors are developed for mass production of accelerating cavity for future projects. New vendors are developing for diamond turning machining, cleaning and brazing processes. Fabrication involved materi...

Full description

Saved in:
Bibliographic Details
Main Authors: Ghodke, S. R., Barnwal, Rajesh, Mondal, Jayant, Dhavle, A. S., Parashar, Sonali, Kumar, Mahendra, Nayak, Susanta, Jayaprakash, D., Sharma, Vijay, Acharya, S., Nimje, V. T., Mittal, K. C., Dutta, B. K., Gantayet, L. M.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:BARC has been developed 2856 MHz accelerating cavities for 6 MeV, 9 MeV and 10 MeV RF Linac. New vendors are developed for mass production of accelerating cavity for future projects. New vendors are developing for diamond turning machining, cleaning and brazing processes. Fabrication involved material testing, CNC diamond turning of cavity, cavity cleaning and brazing. Before and after brazing resonance frequency (RF) of cavity was checked with vector network analyser (VNA). A power feed test setup is also fabricated to test power feed cavity before brazing. This test setup will be used to find out assembly performance of power feed cavity and its coupler. This paper discusses about nano machining, cleaning and brazing processes of RF cavities.
ISSN:1093-2941
DOI:10.1109/DEIV.2014.6961629