Loading…

Optimal Black Start Resource Allocation

The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. A...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on power systems 2016-05, Vol.31 (3), p.2493-2494
Main Authors: Qiu, Feng, Wang, Jianhui, Chen, Chen, Tong, Jianzhong
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.
ISSN:0885-8950
1558-0679
DOI:10.1109/TPWRS.2015.2442918