Loading…

Nuclotron beam diagnostics

The superconducting synchrotron Nuclotron was put into operation in March 1993 at the Laboratory of High Energies, JINR in Dubna. The Nuclotron Control System (NCS) provided an efficient support for machine operation during all runs. The dedicated NCS subsystem for beam diagnostics in the injection...

Full description

Saved in:
Bibliographic Details
Main Authors: Andreev, V., Gorchenko, V., Govorov, A., Kirichenko, A., Kovalenko, A., Kulikov, I., Mikhailov, V., Monchinsky, V., Romanov, S., Sveshnikov, B., Tsarenkov, A., Vasilishin, B., Voevodin, M., Volkov, V.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The superconducting synchrotron Nuclotron was put into operation in March 1993 at the Laboratory of High Energies, JINR in Dubna. The Nuclotron Control System (NCS) provided an efficient support for machine operation during all runs. The dedicated NCS subsystem for beam diagnostics in the injection transfer line and the Nuclotron ring is described.
DOI:10.1109/PAC.1999.794438