Loading…
An Analysis for a Precise Reliability and Availability Assessment of "Photovoltaic System" Pilot Site: a Case Study
In this paper a new way to approach the reliability and availability analysis for a complex system is developed. A "case study", concerning a photovoltaic generation system inside the University of "Roma Tre", is examined. The system was designed to supply power to a building (on...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 6 |
container_issue | |
container_start_page | 1 |
container_title | |
container_volume | |
creator | Leccese, Fabio Petritoli, Enrico Cagnetti, Marco Sangiovanni, Silvia Podesta, Luca Spagnolo, Giuseppe Schirripa |
description | In this paper a new way to approach the reliability and availability analysis for a complex system is developed. A "case study", concerning a photovoltaic generation system inside the University of "Roma Tre", is examined. The system was designed to supply power to a building (on an experimental basis) and to work alongside the power grid. Initially the system is subjected to a reliability analysis to establish the MTBF of each component and of the overall system: the analysis is based on methods that try to overcome the old military handbook MIL-HDBK-217 by taking into account parameters that are well able to define the expectation of life of modern components. The second availability analysis gives us the actual time available to the end user. The synthesis of the analysis will give us a real insight into the behaviour of the complex system, indicating criticalities and strengths. |
doi_str_mv | 10.1109/RTSI50628.2021.9597225 |
format | conference_proceeding |
fullrecord | <record><control><sourceid>ieee_CHZPO</sourceid><recordid>TN_cdi_ieee_primary_9597225</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>9597225</ieee_id><sourcerecordid>9597225</sourcerecordid><originalsourceid>FETCH-LOGICAL-i118t-87c71e9801b70a99358a63546391cbdf5247d67fbc75d29d165200642bc0b9dc3</originalsourceid><addsrcrecordid>eNo10E9LwzAcxvEoCM65VyBI2L0zv6T5560Mp4OBY53nkSYpRrJWmjjou3fgPD3wPXwOD0KPQBYARD_t9vWaE0HVghIKC821pJRfoTsQgpclMC6u0YQKJQuhQN6iWUpfhBBGCSsVm6BUdbjqTBxTSLjtB2zwdvA2JI93PgbThBjyiE3ncHUyIf6HKiWf0tF3Gfctnm8_-9yf-phNsLgeU_bHOd6G2Gdch-yfz-zSnM06_7jxHt20JiY_u-wUfaxe9su3YvP-ul5WmyIAqFwoaSV4rQg0khitGVdGMF4KpsE2ruW0lE7ItrGSO6odCE4JESVtLGm0s2yKHv7c4L0_fA_haIbxcPmI_QJhT1uT</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>An Analysis for a Precise Reliability and Availability Assessment of "Photovoltaic System" Pilot Site: a Case Study</title><source>IEEE Xplore All Conference Series</source><creator>Leccese, Fabio ; Petritoli, Enrico ; Cagnetti, Marco ; Sangiovanni, Silvia ; Podesta, Luca ; Spagnolo, Giuseppe Schirripa</creator><creatorcontrib>Leccese, Fabio ; Petritoli, Enrico ; Cagnetti, Marco ; Sangiovanni, Silvia ; Podesta, Luca ; Spagnolo, Giuseppe Schirripa</creatorcontrib><description>In this paper a new way to approach the reliability and availability analysis for a complex system is developed. A "case study", concerning a photovoltaic generation system inside the University of "Roma Tre", is examined. The system was designed to supply power to a building (on an experimental basis) and to work alongside the power grid. Initially the system is subjected to a reliability analysis to establish the MTBF of each component and of the overall system: the analysis is based on methods that try to overcome the old military handbook MIL-HDBK-217 by taking into account parameters that are well able to define the expectation of life of modern components. The second availability analysis gives us the actual time available to the end user. The synthesis of the analysis will give us a real insight into the behaviour of the complex system, indicating criticalities and strengths.</description><identifier>EISSN: 2687-6817</identifier><identifier>EISBN: 1665441356</identifier><identifier>EISBN: 9781665441353</identifier><identifier>DOI: 10.1109/RTSI50628.2021.9597225</identifier><language>eng</language><publisher>IEEE</publisher><subject>Availability ; Buildings ; COTS ; Industries ; Manuals ; Photovoltaic System ; Photovoltaic systems ; Power grids ; Prediction ; Procurement ; Production ; RAMS ; Reliability</subject><ispartof>2021 IEEE 6th International Forum on Research and Technology for Society and Industry (RTSI), 2021, p.1-6</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/9597225$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,23930,23931,25140,27925,54555,54932</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/9597225$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Leccese, Fabio</creatorcontrib><creatorcontrib>Petritoli, Enrico</creatorcontrib><creatorcontrib>Cagnetti, Marco</creatorcontrib><creatorcontrib>Sangiovanni, Silvia</creatorcontrib><creatorcontrib>Podesta, Luca</creatorcontrib><creatorcontrib>Spagnolo, Giuseppe Schirripa</creatorcontrib><title>An Analysis for a Precise Reliability and Availability Assessment of "Photovoltaic System" Pilot Site: a Case Study</title><title>2021 IEEE 6th International Forum on Research and Technology for Society and Industry (RTSI)</title><addtitle>RTSI</addtitle><description>In this paper a new way to approach the reliability and availability analysis for a complex system is developed. A "case study", concerning a photovoltaic generation system inside the University of "Roma Tre", is examined. The system was designed to supply power to a building (on an experimental basis) and to work alongside the power grid. Initially the system is subjected to a reliability analysis to establish the MTBF of each component and of the overall system: the analysis is based on methods that try to overcome the old military handbook MIL-HDBK-217 by taking into account parameters that are well able to define the expectation of life of modern components. The second availability analysis gives us the actual time available to the end user. The synthesis of the analysis will give us a real insight into the behaviour of the complex system, indicating criticalities and strengths.</description><subject>Availability</subject><subject>Buildings</subject><subject>COTS</subject><subject>Industries</subject><subject>Manuals</subject><subject>Photovoltaic System</subject><subject>Photovoltaic systems</subject><subject>Power grids</subject><subject>Prediction</subject><subject>Procurement</subject><subject>Production</subject><subject>RAMS</subject><subject>Reliability</subject><issn>2687-6817</issn><isbn>1665441356</isbn><isbn>9781665441353</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2021</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><recordid>eNo10E9LwzAcxvEoCM65VyBI2L0zv6T5560Mp4OBY53nkSYpRrJWmjjou3fgPD3wPXwOD0KPQBYARD_t9vWaE0HVghIKC821pJRfoTsQgpclMC6u0YQKJQuhQN6iWUpfhBBGCSsVm6BUdbjqTBxTSLjtB2zwdvA2JI93PgbThBjyiE3ncHUyIf6HKiWf0tF3Gfctnm8_-9yf-phNsLgeU_bHOd6G2Gdch-yfz-zSnM06_7jxHt20JiY_u-wUfaxe9su3YvP-ul5WmyIAqFwoaSV4rQg0khitGVdGMF4KpsE2ruW0lE7ItrGSO6odCE4JESVtLGm0s2yKHv7c4L0_fA_haIbxcPmI_QJhT1uT</recordid><startdate>20210906</startdate><enddate>20210906</enddate><creator>Leccese, Fabio</creator><creator>Petritoli, Enrico</creator><creator>Cagnetti, Marco</creator><creator>Sangiovanni, Silvia</creator><creator>Podesta, Luca</creator><creator>Spagnolo, Giuseppe Schirripa</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>20210906</creationdate><title>An Analysis for a Precise Reliability and Availability Assessment of "Photovoltaic System" Pilot Site: a Case Study</title><author>Leccese, Fabio ; Petritoli, Enrico ; Cagnetti, Marco ; Sangiovanni, Silvia ; Podesta, Luca ; Spagnolo, Giuseppe Schirripa</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i118t-87c71e9801b70a99358a63546391cbdf5247d67fbc75d29d165200642bc0b9dc3</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Availability</topic><topic>Buildings</topic><topic>COTS</topic><topic>Industries</topic><topic>Manuals</topic><topic>Photovoltaic System</topic><topic>Photovoltaic systems</topic><topic>Power grids</topic><topic>Prediction</topic><topic>Procurement</topic><topic>Production</topic><topic>RAMS</topic><topic>Reliability</topic><toplevel>online_resources</toplevel><creatorcontrib>Leccese, Fabio</creatorcontrib><creatorcontrib>Petritoli, Enrico</creatorcontrib><creatorcontrib>Cagnetti, Marco</creatorcontrib><creatorcontrib>Sangiovanni, Silvia</creatorcontrib><creatorcontrib>Podesta, Luca</creatorcontrib><creatorcontrib>Spagnolo, Giuseppe Schirripa</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE/IET Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Leccese, Fabio</au><au>Petritoli, Enrico</au><au>Cagnetti, Marco</au><au>Sangiovanni, Silvia</au><au>Podesta, Luca</au><au>Spagnolo, Giuseppe Schirripa</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>An Analysis for a Precise Reliability and Availability Assessment of "Photovoltaic System" Pilot Site: a Case Study</atitle><btitle>2021 IEEE 6th International Forum on Research and Technology for Society and Industry (RTSI)</btitle><stitle>RTSI</stitle><date>2021-09-06</date><risdate>2021</risdate><spage>1</spage><epage>6</epage><pages>1-6</pages><eissn>2687-6817</eissn><eisbn>1665441356</eisbn><eisbn>9781665441353</eisbn><abstract>In this paper a new way to approach the reliability and availability analysis for a complex system is developed. A "case study", concerning a photovoltaic generation system inside the University of "Roma Tre", is examined. The system was designed to supply power to a building (on an experimental basis) and to work alongside the power grid. Initially the system is subjected to a reliability analysis to establish the MTBF of each component and of the overall system: the analysis is based on methods that try to overcome the old military handbook MIL-HDBK-217 by taking into account parameters that are well able to define the expectation of life of modern components. The second availability analysis gives us the actual time available to the end user. The synthesis of the analysis will give us a real insight into the behaviour of the complex system, indicating criticalities and strengths.</abstract><pub>IEEE</pub><doi>10.1109/RTSI50628.2021.9597225</doi><tpages>6</tpages></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | EISSN: 2687-6817 |
ispartof | 2021 IEEE 6th International Forum on Research and Technology for Society and Industry (RTSI), 2021, p.1-6 |
issn | 2687-6817 |
language | eng |
recordid | cdi_ieee_primary_9597225 |
source | IEEE Xplore All Conference Series |
subjects | Availability Buildings COTS Industries Manuals Photovoltaic System Photovoltaic systems Power grids Prediction Procurement Production RAMS Reliability |
title | An Analysis for a Precise Reliability and Availability Assessment of "Photovoltaic System" Pilot Site: a Case Study |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T23%3A05%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_CHZPO&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=An%20Analysis%20for%20a%20Precise%20Reliability%20and%20Availability%20Assessment%20of%20%22Photovoltaic%20System%22%20Pilot%20Site:%20a%20Case%20Study&rft.btitle=2021%20IEEE%206th%20International%20Forum%20on%20Research%20and%20Technology%20for%20Society%20and%20Industry%20(RTSI)&rft.au=Leccese,%20Fabio&rft.date=2021-09-06&rft.spage=1&rft.epage=6&rft.pages=1-6&rft.eissn=2687-6817&rft_id=info:doi/10.1109/RTSI50628.2021.9597225&rft.eisbn=1665441356&rft.eisbn_list=9781665441353&rft_dat=%3Cieee_CHZPO%3E9597225%3C/ieee_CHZPO%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-i118t-87c71e9801b70a99358a63546391cbdf5247d67fbc75d29d165200642bc0b9dc3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=9597225&rfr_iscdi=true |