Loading…

Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office

The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering...

Full description

Saved in:
Bibliographic Details
Main Authors: Cantara, Marielle A., Melendrez, John Lhor C., Tubera, Jason B., Obamos, Julian Robert S., Molinyawe, Maria Nenita S., Parondo, Michael M., Alcaraz, Jesse Ian Llyod L., Vanguardia, Sarah C.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 6
container_issue
container_start_page 1
container_title
container_volume
creator Cantara, Marielle A.
Melendrez, John Lhor C.
Tubera, Jason B.
Obamos, Julian Robert S.
Molinyawe, Maria Nenita S.
Parondo, Michael M.
Alcaraz, Jesse Ian Llyod L.
Vanguardia, Sarah C.
description The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects.
doi_str_mv 10.1109/TENCON55691.2022.9977950
format conference_proceeding
fullrecord <record><control><sourceid>ieee_CHZPO</sourceid><recordid>TN_cdi_ieee_primary_9977950</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>9977950</ieee_id><sourcerecordid>9977950</sourcerecordid><originalsourceid>FETCH-LOGICAL-i487-464432d58358985726e75d3d2d0b9a85ee8c4ffe4a84645e3f9ee1464240e2b43</originalsourceid><addsrcrecordid>eNotkMtOwzAQRQ0SEqX0C9j4B1L8TGx2VVQeUl-LIJaVm4yLaWpXjhEqaz6cVO1sZu7onFkMQpiSMaVEP1bTRblcSJlrOmaEsbHWRaEluUJ3NM-lkERLfY0GjEqd8T7eolHXfZG-csKIKgbobxXDNpo9tiHi9Am4Mt0OT9o21Ca54PE8NNA-4TefoOeS81v8EeKux2vAq9Z4f1qd7Lnxh_ADEb8n17rfs24SLl064mBxaTbfRxPw1G-dB4gnb2mtq-Ee3VjTdjC69CGqnqdV-ZrNli9v5WSWOaGKTORCcNZIxaXSShYsh0I2vGEN2WijJICqhbUgjOpRCdxqANqPTBBgG8GH6OF81gHA-hDd3sTj-vIz_g-RyGL5</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</title><source>IEEE Xplore All Conference Series</source><creator>Cantara, Marielle A. ; Melendrez, John Lhor C. ; Tubera, Jason B. ; Obamos, Julian Robert S. ; Molinyawe, Maria Nenita S. ; Parondo, Michael M. ; Alcaraz, Jesse Ian Llyod L. ; Vanguardia, Sarah C.</creator><creatorcontrib>Cantara, Marielle A. ; Melendrez, John Lhor C. ; Tubera, Jason B. ; Obamos, Julian Robert S. ; Molinyawe, Maria Nenita S. ; Parondo, Michael M. ; Alcaraz, Jesse Ian Llyod L. ; Vanguardia, Sarah C.</creatorcontrib><description>The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects.</description><identifier>EISSN: 2159-3450</identifier><identifier>EISBN: 1665450959</identifier><identifier>EISBN: 9781665450959</identifier><identifier>DOI: 10.1109/TENCON55691.2022.9977950</identifier><language>eng</language><publisher>IEEE</publisher><subject>allocation ; Delays ; Distance measurement ; gaps ; Personnel ; program of works ; Resource management ; Strategic planning ; Urban areas ; utilization ; Visual BASIC ; workforce planning</subject><ispartof>TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON), 2022, p.1-6</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/9977950$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,23930,23931,25140,27925,54555,54932</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/9977950$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Cantara, Marielle A.</creatorcontrib><creatorcontrib>Melendrez, John Lhor C.</creatorcontrib><creatorcontrib>Tubera, Jason B.</creatorcontrib><creatorcontrib>Obamos, Julian Robert S.</creatorcontrib><creatorcontrib>Molinyawe, Maria Nenita S.</creatorcontrib><creatorcontrib>Parondo, Michael M.</creatorcontrib><creatorcontrib>Alcaraz, Jesse Ian Llyod L.</creatorcontrib><creatorcontrib>Vanguardia, Sarah C.</creatorcontrib><title>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</title><title>TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON)</title><addtitle>TENCON</addtitle><description>The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects.</description><subject>allocation</subject><subject>Delays</subject><subject>Distance measurement</subject><subject>gaps</subject><subject>Personnel</subject><subject>program of works</subject><subject>Resource management</subject><subject>Strategic planning</subject><subject>Urban areas</subject><subject>utilization</subject><subject>Visual BASIC</subject><subject>workforce planning</subject><issn>2159-3450</issn><isbn>1665450959</isbn><isbn>9781665450959</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2022</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><recordid>eNotkMtOwzAQRQ0SEqX0C9j4B1L8TGx2VVQeUl-LIJaVm4yLaWpXjhEqaz6cVO1sZu7onFkMQpiSMaVEP1bTRblcSJlrOmaEsbHWRaEluUJ3NM-lkERLfY0GjEqd8T7eolHXfZG-csKIKgbobxXDNpo9tiHi9Am4Mt0OT9o21Ca54PE8NNA-4TefoOeS81v8EeKux2vAq9Z4f1qd7Lnxh_ADEb8n17rfs24SLl064mBxaTbfRxPw1G-dB4gnb2mtq-Ee3VjTdjC69CGqnqdV-ZrNli9v5WSWOaGKTORCcNZIxaXSShYsh0I2vGEN2WijJICqhbUgjOpRCdxqANqPTBBgG8GH6OF81gHA-hDd3sTj-vIz_g-RyGL5</recordid><startdate>20221101</startdate><enddate>20221101</enddate><creator>Cantara, Marielle A.</creator><creator>Melendrez, John Lhor C.</creator><creator>Tubera, Jason B.</creator><creator>Obamos, Julian Robert S.</creator><creator>Molinyawe, Maria Nenita S.</creator><creator>Parondo, Michael M.</creator><creator>Alcaraz, Jesse Ian Llyod L.</creator><creator>Vanguardia, Sarah C.</creator><general>IEEE</general><scope>6IE</scope><scope>6IH</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIO</scope></search><sort><creationdate>20221101</creationdate><title>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</title><author>Cantara, Marielle A. ; Melendrez, John Lhor C. ; Tubera, Jason B. ; Obamos, Julian Robert S. ; Molinyawe, Maria Nenita S. ; Parondo, Michael M. ; Alcaraz, Jesse Ian Llyod L. ; Vanguardia, Sarah C.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i487-464432d58358985726e75d3d2d0b9a85ee8c4ffe4a84645e3f9ee1464240e2b43</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2022</creationdate><topic>allocation</topic><topic>Delays</topic><topic>Distance measurement</topic><topic>gaps</topic><topic>Personnel</topic><topic>program of works</topic><topic>Resource management</topic><topic>Strategic planning</topic><topic>Urban areas</topic><topic>utilization</topic><topic>Visual BASIC</topic><topic>workforce planning</topic><toplevel>online_resources</toplevel><creatorcontrib>Cantara, Marielle A.</creatorcontrib><creatorcontrib>Melendrez, John Lhor C.</creatorcontrib><creatorcontrib>Tubera, Jason B.</creatorcontrib><creatorcontrib>Obamos, Julian Robert S.</creatorcontrib><creatorcontrib>Molinyawe, Maria Nenita S.</creatorcontrib><creatorcontrib>Parondo, Michael M.</creatorcontrib><creatorcontrib>Alcaraz, Jesse Ian Llyod L.</creatorcontrib><creatorcontrib>Vanguardia, Sarah C.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan (POP) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Xplore (Online service)</collection><collection>IEEE Proceedings Order Plans (POP) 1998-present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Cantara, Marielle A.</au><au>Melendrez, John Lhor C.</au><au>Tubera, Jason B.</au><au>Obamos, Julian Robert S.</au><au>Molinyawe, Maria Nenita S.</au><au>Parondo, Michael M.</au><au>Alcaraz, Jesse Ian Llyod L.</au><au>Vanguardia, Sarah C.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</atitle><btitle>TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON)</btitle><stitle>TENCON</stitle><date>2022-11-01</date><risdate>2022</risdate><spage>1</spage><epage>6</epage><pages>1-6</pages><eissn>2159-3450</eissn><eisbn>1665450959</eisbn><eisbn>9781665450959</eisbn><abstract>The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects.</abstract><pub>IEEE</pub><doi>10.1109/TENCON55691.2022.9977950</doi><tpages>6</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier EISSN: 2159-3450
ispartof TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON), 2022, p.1-6
issn 2159-3450
language eng
recordid cdi_ieee_primary_9977950
source IEEE Xplore All Conference Series
subjects allocation
Delays
Distance measurement
gaps
Personnel
program of works
Resource management
Strategic planning
Urban areas
utilization
Visual BASIC
workforce planning
title Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T12%3A22%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_CHZPO&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Program%20for%20the%20Task%20Allocation%20Model:%20Integrating%20Workforce%20Planning%20for%20Manpower%20Utilization%20at%20City%20of%20Cabuyao%20Engineering%20Office&rft.btitle=TENCON%202022%20-%202022%20IEEE%20Region%2010%20Conference%20(TENCON)&rft.au=Cantara,%20Marielle%20A.&rft.date=2022-11-01&rft.spage=1&rft.epage=6&rft.pages=1-6&rft.eissn=2159-3450&rft_id=info:doi/10.1109/TENCON55691.2022.9977950&rft.eisbn=1665450959&rft.eisbn_list=9781665450959&rft_dat=%3Cieee_CHZPO%3E9977950%3C/ieee_CHZPO%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-i487-464432d58358985726e75d3d2d0b9a85ee8c4ffe4a84645e3f9ee1464240e2b43%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=9977950&rfr_iscdi=true