Loading…
Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office
The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering...
Saved in:
Main Authors: | , , , , , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 6 |
container_issue | |
container_start_page | 1 |
container_title | |
container_volume | |
creator | Cantara, Marielle A. Melendrez, John Lhor C. Tubera, Jason B. Obamos, Julian Robert S. Molinyawe, Maria Nenita S. Parondo, Michael M. Alcaraz, Jesse Ian Llyod L. Vanguardia, Sarah C. |
description | The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects. |
doi_str_mv | 10.1109/TENCON55691.2022.9977950 |
format | conference_proceeding |
fullrecord | <record><control><sourceid>ieee_CHZPO</sourceid><recordid>TN_cdi_ieee_primary_9977950</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>9977950</ieee_id><sourcerecordid>9977950</sourcerecordid><originalsourceid>FETCH-LOGICAL-i487-464432d58358985726e75d3d2d0b9a85ee8c4ffe4a84645e3f9ee1464240e2b43</originalsourceid><addsrcrecordid>eNotkMtOwzAQRQ0SEqX0C9j4B1L8TGx2VVQeUl-LIJaVm4yLaWpXjhEqaz6cVO1sZu7onFkMQpiSMaVEP1bTRblcSJlrOmaEsbHWRaEluUJ3NM-lkERLfY0GjEqd8T7eolHXfZG-csKIKgbobxXDNpo9tiHi9Am4Mt0OT9o21Ca54PE8NNA-4TefoOeS81v8EeKux2vAq9Z4f1qd7Lnxh_ADEb8n17rfs24SLl064mBxaTbfRxPw1G-dB4gnb2mtq-Ee3VjTdjC69CGqnqdV-ZrNli9v5WSWOaGKTORCcNZIxaXSShYsh0I2vGEN2WijJICqhbUgjOpRCdxqANqPTBBgG8GH6OF81gHA-hDd3sTj-vIz_g-RyGL5</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</title><source>IEEE Xplore All Conference Series</source><creator>Cantara, Marielle A. ; Melendrez, John Lhor C. ; Tubera, Jason B. ; Obamos, Julian Robert S. ; Molinyawe, Maria Nenita S. ; Parondo, Michael M. ; Alcaraz, Jesse Ian Llyod L. ; Vanguardia, Sarah C.</creator><creatorcontrib>Cantara, Marielle A. ; Melendrez, John Lhor C. ; Tubera, Jason B. ; Obamos, Julian Robert S. ; Molinyawe, Maria Nenita S. ; Parondo, Michael M. ; Alcaraz, Jesse Ian Llyod L. ; Vanguardia, Sarah C.</creatorcontrib><description>The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects.</description><identifier>EISSN: 2159-3450</identifier><identifier>EISBN: 1665450959</identifier><identifier>EISBN: 9781665450959</identifier><identifier>DOI: 10.1109/TENCON55691.2022.9977950</identifier><language>eng</language><publisher>IEEE</publisher><subject>allocation ; Delays ; Distance measurement ; gaps ; Personnel ; program of works ; Resource management ; Strategic planning ; Urban areas ; utilization ; Visual BASIC ; workforce planning</subject><ispartof>TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON), 2022, p.1-6</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/9977950$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,23930,23931,25140,27925,54555,54932</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/9977950$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Cantara, Marielle A.</creatorcontrib><creatorcontrib>Melendrez, John Lhor C.</creatorcontrib><creatorcontrib>Tubera, Jason B.</creatorcontrib><creatorcontrib>Obamos, Julian Robert S.</creatorcontrib><creatorcontrib>Molinyawe, Maria Nenita S.</creatorcontrib><creatorcontrib>Parondo, Michael M.</creatorcontrib><creatorcontrib>Alcaraz, Jesse Ian Llyod L.</creatorcontrib><creatorcontrib>Vanguardia, Sarah C.</creatorcontrib><title>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</title><title>TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON)</title><addtitle>TENCON</addtitle><description>The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects.</description><subject>allocation</subject><subject>Delays</subject><subject>Distance measurement</subject><subject>gaps</subject><subject>Personnel</subject><subject>program of works</subject><subject>Resource management</subject><subject>Strategic planning</subject><subject>Urban areas</subject><subject>utilization</subject><subject>Visual BASIC</subject><subject>workforce planning</subject><issn>2159-3450</issn><isbn>1665450959</isbn><isbn>9781665450959</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2022</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><recordid>eNotkMtOwzAQRQ0SEqX0C9j4B1L8TGx2VVQeUl-LIJaVm4yLaWpXjhEqaz6cVO1sZu7onFkMQpiSMaVEP1bTRblcSJlrOmaEsbHWRaEluUJ3NM-lkERLfY0GjEqd8T7eolHXfZG-csKIKgbobxXDNpo9tiHi9Am4Mt0OT9o21Ca54PE8NNA-4TefoOeS81v8EeKux2vAq9Z4f1qd7Lnxh_ADEb8n17rfs24SLl064mBxaTbfRxPw1G-dB4gnb2mtq-Ee3VjTdjC69CGqnqdV-ZrNli9v5WSWOaGKTORCcNZIxaXSShYsh0I2vGEN2WijJICqhbUgjOpRCdxqANqPTBBgG8GH6OF81gHA-hDd3sTj-vIz_g-RyGL5</recordid><startdate>20221101</startdate><enddate>20221101</enddate><creator>Cantara, Marielle A.</creator><creator>Melendrez, John Lhor C.</creator><creator>Tubera, Jason B.</creator><creator>Obamos, Julian Robert S.</creator><creator>Molinyawe, Maria Nenita S.</creator><creator>Parondo, Michael M.</creator><creator>Alcaraz, Jesse Ian Llyod L.</creator><creator>Vanguardia, Sarah C.</creator><general>IEEE</general><scope>6IE</scope><scope>6IH</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIO</scope></search><sort><creationdate>20221101</creationdate><title>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</title><author>Cantara, Marielle A. ; Melendrez, John Lhor C. ; Tubera, Jason B. ; Obamos, Julian Robert S. ; Molinyawe, Maria Nenita S. ; Parondo, Michael M. ; Alcaraz, Jesse Ian Llyod L. ; Vanguardia, Sarah C.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i487-464432d58358985726e75d3d2d0b9a85ee8c4ffe4a84645e3f9ee1464240e2b43</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2022</creationdate><topic>allocation</topic><topic>Delays</topic><topic>Distance measurement</topic><topic>gaps</topic><topic>Personnel</topic><topic>program of works</topic><topic>Resource management</topic><topic>Strategic planning</topic><topic>Urban areas</topic><topic>utilization</topic><topic>Visual BASIC</topic><topic>workforce planning</topic><toplevel>online_resources</toplevel><creatorcontrib>Cantara, Marielle A.</creatorcontrib><creatorcontrib>Melendrez, John Lhor C.</creatorcontrib><creatorcontrib>Tubera, Jason B.</creatorcontrib><creatorcontrib>Obamos, Julian Robert S.</creatorcontrib><creatorcontrib>Molinyawe, Maria Nenita S.</creatorcontrib><creatorcontrib>Parondo, Michael M.</creatorcontrib><creatorcontrib>Alcaraz, Jesse Ian Llyod L.</creatorcontrib><creatorcontrib>Vanguardia, Sarah C.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan (POP) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Xplore (Online service)</collection><collection>IEEE Proceedings Order Plans (POP) 1998-present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Cantara, Marielle A.</au><au>Melendrez, John Lhor C.</au><au>Tubera, Jason B.</au><au>Obamos, Julian Robert S.</au><au>Molinyawe, Maria Nenita S.</au><au>Parondo, Michael M.</au><au>Alcaraz, Jesse Ian Llyod L.</au><au>Vanguardia, Sarah C.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office</atitle><btitle>TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON)</btitle><stitle>TENCON</stitle><date>2022-11-01</date><risdate>2022</risdate><spage>1</spage><epage>6</epage><pages>1-6</pages><eissn>2159-3450</eissn><eisbn>1665450959</eisbn><eisbn>9781665450959</eisbn><abstract>The City Engineering Office has such a great deal of difficulty completing projects, and when new ones come up, the work piles up. The results of a survey of 7 individuals who work for the program for projects on the causes of pending allocation delays indicate that labor capacity of the engineering office is one of the most significant factors in increasing pending allocation. The right quality and number of people are required for firms to successfully implement strategic planning. It requires the correct quantity of workforce with the right skills and talents at the appropriate times, in proper position, and for the cheapest price, among other things. Through an Integrated Workforce Planning Model, the proponents are led to the intervention of an allocation system through the use of Excel Visual Basic Application. The data collected was used and analyzed in order to build the system by considering the workforce analysis, computation of utilization points based on the set parameters of budget and estimated duration and the current classified description of the construction projects at the City Engineering Office. It was found out that workforce planning was an effective tool for optimizing the capacity of people working on programs to meet the demands of construction projects.</abstract><pub>IEEE</pub><doi>10.1109/TENCON55691.2022.9977950</doi><tpages>6</tpages></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | EISSN: 2159-3450 |
ispartof | TENCON 2022 - 2022 IEEE Region 10 Conference (TENCON), 2022, p.1-6 |
issn | 2159-3450 |
language | eng |
recordid | cdi_ieee_primary_9977950 |
source | IEEE Xplore All Conference Series |
subjects | allocation Delays Distance measurement gaps Personnel program of works Resource management Strategic planning Urban areas utilization Visual BASIC workforce planning |
title | Program for the Task Allocation Model: Integrating Workforce Planning for Manpower Utilization at City of Cabuyao Engineering Office |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T12%3A22%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_CHZPO&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Program%20for%20the%20Task%20Allocation%20Model:%20Integrating%20Workforce%20Planning%20for%20Manpower%20Utilization%20at%20City%20of%20Cabuyao%20Engineering%20Office&rft.btitle=TENCON%202022%20-%202022%20IEEE%20Region%2010%20Conference%20(TENCON)&rft.au=Cantara,%20Marielle%20A.&rft.date=2022-11-01&rft.spage=1&rft.epage=6&rft.pages=1-6&rft.eissn=2159-3450&rft_id=info:doi/10.1109/TENCON55691.2022.9977950&rft.eisbn=1665450959&rft.eisbn_list=9781665450959&rft_dat=%3Cieee_CHZPO%3E9977950%3C/ieee_CHZPO%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-i487-464432d58358985726e75d3d2d0b9a85ee8c4ffe4a84645e3f9ee1464240e2b43%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=9977950&rfr_iscdi=true |