Loading…

An Interactive Rescheduler for Chemical Process Operations

This paper describes an interactive rescheduler that can revise a schedule when sudden and unexpected events occur in a chemical plant. First, a progressive rescheduling method that is based on progressive reasoning is presented. Second, an IRSS (Interactive Rescheduling Support System) with an inte...

Full description

Saved in:
Bibliographic Details
Published in:International journal of logistics 1998-07, Vol.1 (2), p.157-172
Main Authors: NAKAMURA, NOBUTO, MURAKAMI, TADASHI, TAKAHARA, JOJI, KAMIGAKI, TAMOTSU
Format: Article
Language:English
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper describes an interactive rescheduler that can revise a schedule when sudden and unexpected events occur in a chemical plant. First, a progressive rescheduling method that is based on progressive reasoning is presented. Second, an IRSS (Interactive Rescheduling Support System) with an interactive rescheduler equipped with formal and informal knowledge that can cope with unexpected events is described. A practical example for evaluating the feasibility of the system is given.
ISSN:1367-5567
1469-848X
DOI:10.1080/13675569808962045