Loading…

Optimization of FPM system in Barsukovskoye deposit with hydrodynamic modeling and analysis of inter-well interaction

Development of most deposits in Russia is accompanied with a high level of crude water cut. More than 70% of the operating well count of Barsukovskoye deposit operates with water; about 12% of the wells are characterized by a saturated water cut; many wells with high water cut are idling. To optimiz...

Full description

Saved in:
Bibliographic Details
Published in:Journal of physics. Conference series 2018-05, Vol.1015 (3), p.32006
Main Authors: Almukhametova, E M, Gizetdinov, I A
Format: Article
Language:English
Subjects:
Citations: Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Development of most deposits in Russia is accompanied with a high level of crude water cut. More than 70% of the operating well count of Barsukovskoye deposit operates with water; about 12% of the wells are characterized by a saturated water cut; many wells with high water cut are idling. To optimize the current FPM system of the Barsukovskoye deposit, a calculation method over a hydrodynamic model was applied with further analysis of hydrodynamic connectivity between the wells. A plot was selected, containing several wells with water cut going ahead of reserve recovery rate; injection wells, exerting the most influence onto the selected producer wells, were determined. Then, several variants were considered for transformation of the FPM system of this plot. The possible cases were analyzed with the hydrodynamic model with further determination of economic effect of each of them.
ISSN:1742-6588
1742-6596
DOI:10.1088/1742-6596/1015/3/032006