Loading…
Lot Streaming in Job-Shop Scheduling
The issue in Lot Streaming is how to split lots into sublots in order to improve the makespan (or some other criterion). We present a model and an iterative procedure for a general job-shop environment. The procedure alternates between solving a lot-sizing problem with a given sequence of sublots on...
Saved in:
Published in: | Operations research 1997-07, Vol.45 (4), p.584-595 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The issue in Lot Streaming is how to split lots into sublots in order to improve the makespan (or some other criterion). We present a model and an iterative procedure for a general job-shop environment. The procedure alternates between solving a lot-sizing problem with a given sequence of sublots on the machines, and a standard job-shop scheduling problem with fixed sublot sizes. We report the computational results on a significant sample of 120 job-shop and flow-shop scheduling problems (including the famous 10–10). In case of no setup, in a few iterations, the makespan approaches a lower bound using very few sublots, suggesting that the procedure yields a global optimum. As a by-product, this result somehow validates the capacitated lot-sizing models in which the detailed capacity constraints, induced by the sequencing of operations, are ignored. |
---|---|
ISSN: | 0030-364X 1526-5463 |
DOI: | 10.1287/opre.45.4.584 |