Loading…
BIM-based building energy load calculation system for designers
In addition to the global awareness regarding green buildings, there is growing interest in Building Energy Load Calculation (BELC). The BELC process, however, has several potential problems, including the fact that the required data are input manually through subjective engineer choices and, during...
Saved in:
Published in: | KSCE journal of civil engineering 2016, 20(2), , pp.549-563 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c537t-99d63242becb9ff4bc470518da45b729f36d8d33b8e90602390b4d11c737b32b3 |
---|---|
cites | cdi_FETCH-LOGICAL-c537t-99d63242becb9ff4bc470518da45b729f36d8d33b8e90602390b4d11c737b32b3 |
container_end_page | 563 |
container_issue | 2 |
container_start_page | 549 |
container_title | KSCE journal of civil engineering |
container_volume | 20 |
creator | Kim, Karam Yu, Jungho |
description | In addition to the global awareness regarding green buildings, there is growing interest in Building Energy Load Calculation (BELC). The BELC process, however, has several potential problems, including the fact that the required data are input manually through subjective engineer choices and, during the BELC process, a designer must wait for feedback from the engineer regarding the BELC results. This paper addresses these problems by proposing a BIM-based building energy load calculation system for designers. To that end, the required data for BELC are divided into four types: general, space, material, and element. According to the required data, input methodologies are categorized as either automatic type-A or manual type-M data. The proposed system for BELC is developed with four key functions: type-A data input, type-M data input, material-property matching, and calculation functions. To validate the proposed system, two designers with more than seven years of practical experience and a BELC engineer using the eQUEST and EnergyPLUS programs applied the model to the current and proposed approaches. The proposed system contributes to increasing the efficiency of the BELC process by facilitating self-check by the designer and by reducing the need for engineering input during the BELC process. |
doi_str_mv | 10.1007/s12205-015-1625-0 |
format | article |
fullrecord | <record><control><sourceid>proquest_nrf_k</sourceid><recordid>TN_cdi_nrf_kci_oai_kci_go_kr_ARTI_662719</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1798735328</sourcerecordid><originalsourceid>FETCH-LOGICAL-c537t-99d63242becb9ff4bc470518da45b729f36d8d33b8e90602390b4d11c737b32b3</originalsourceid><addsrcrecordid>eNqNkUtLw0AUhQdRsNT-AHcBN26i80jmsZJafBQUQep6mFdC2jRTZ5JF_71TIyiC4N3cs_jOgXsPAOcIXiEI2XVEGMMyh6jMEcVJHIEJEozmhEN-nDTGNGeC81Mwi3EN0xDMOCkn4OZ2-ZxrFZ3N9NC0tunqzHUu1Pus9cpmRrVmaFXf-C6L-9i7bVb5kFkXmzph8QycVKqNbva1p-Dt_m61eMyfXh6Wi_lTbkrC-lwISwkusHZGi6oqtCkYLBG3qig1w6Ii1HJLiOZOQAoxEVAXFiHDCNMEazIFl2NuFyq5MY30qvnctZebIOevq6WkFDMkvtFd8O-Di73cNtG4tlWd80OUKH2CkZJg_h-U4BIWCCf04he69kPo0s2JogWnMD00UWikTPAxBlfJXWi2KuwlgvLQlRy7kqkreehKwuTBoycmtqtd-JH8p-kDJ36TNg</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1764860783</pqid></control><display><type>article</type><title>BIM-based building energy load calculation system for designers</title><source>Springer Nature</source><creator>Kim, Karam ; Yu, Jungho</creator><creatorcontrib>Kim, Karam ; Yu, Jungho</creatorcontrib><description>In addition to the global awareness regarding green buildings, there is growing interest in Building Energy Load Calculation (BELC). The BELC process, however, has several potential problems, including the fact that the required data are input manually through subjective engineer choices and, during the BELC process, a designer must wait for feedback from the engineer regarding the BELC results. This paper addresses these problems by proposing a BIM-based building energy load calculation system for designers. To that end, the required data for BELC are divided into four types: general, space, material, and element. According to the required data, input methodologies are categorized as either automatic type-A or manual type-M data. The proposed system for BELC is developed with four key functions: type-A data input, type-M data input, material-property matching, and calculation functions. To validate the proposed system, two designers with more than seven years of practical experience and a BELC engineer using the eQUEST and EnergyPLUS programs applied the model to the current and proposed approaches. The proposed system contributes to increasing the efficiency of the BELC process by facilitating self-check by the designer and by reducing the need for engineering input during the BELC process.</description><identifier>ISSN: 1226-7988</identifier><identifier>EISSN: 1976-3808</identifier><identifier>DOI: 10.1007/s12205-015-1625-0</identifier><language>eng</language><publisher>Seoul: Korean Society of Civil Engineers</publisher><subject>Buildings ; Civil Engineering ; Computational efficiency ; Computing time ; Construction Management ; Designers ; Energy ; Engineering ; Engineers ; Feedback ; Geotechnical Engineering & Applied Earth Sciences ; Green buildings ; Green development ; Industrial Pollution Prevention ; Load ; Manuals ; Matching ; Mathematical models ; 토목공학</subject><ispartof>KSCE Journal of Civil Engineering, 2016, 20(2), , pp.549-563</ispartof><rights>Korean Society of Civil Engineers and Springer-Verlag Berlin Heidelberg 2016</rights><rights>Korean Society of Civil Engineers and Springer-Verlag Berlin Heidelberg 2016.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c537t-99d63242becb9ff4bc470518da45b729f36d8d33b8e90602390b4d11c737b32b3</citedby><cites>FETCH-LOGICAL-c537t-99d63242becb9ff4bc470518da45b729f36d8d33b8e90602390b4d11c737b32b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids><backlink>$$Uhttps://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002080440$$DAccess content in National Research Foundation of Korea (NRF)$$Hfree_for_read</backlink></links><search><creatorcontrib>Kim, Karam</creatorcontrib><creatorcontrib>Yu, Jungho</creatorcontrib><title>BIM-based building energy load calculation system for designers</title><title>KSCE journal of civil engineering</title><addtitle>KSCE J Civ Eng</addtitle><description>In addition to the global awareness regarding green buildings, there is growing interest in Building Energy Load Calculation (BELC). The BELC process, however, has several potential problems, including the fact that the required data are input manually through subjective engineer choices and, during the BELC process, a designer must wait for feedback from the engineer regarding the BELC results. This paper addresses these problems by proposing a BIM-based building energy load calculation system for designers. To that end, the required data for BELC are divided into four types: general, space, material, and element. According to the required data, input methodologies are categorized as either automatic type-A or manual type-M data. The proposed system for BELC is developed with four key functions: type-A data input, type-M data input, material-property matching, and calculation functions. To validate the proposed system, two designers with more than seven years of practical experience and a BELC engineer using the eQUEST and EnergyPLUS programs applied the model to the current and proposed approaches. The proposed system contributes to increasing the efficiency of the BELC process by facilitating self-check by the designer and by reducing the need for engineering input during the BELC process.</description><subject>Buildings</subject><subject>Civil Engineering</subject><subject>Computational efficiency</subject><subject>Computing time</subject><subject>Construction Management</subject><subject>Designers</subject><subject>Energy</subject><subject>Engineering</subject><subject>Engineers</subject><subject>Feedback</subject><subject>Geotechnical Engineering & Applied Earth Sciences</subject><subject>Green buildings</subject><subject>Green development</subject><subject>Industrial Pollution Prevention</subject><subject>Load</subject><subject>Manuals</subject><subject>Matching</subject><subject>Mathematical models</subject><subject>토목공학</subject><issn>1226-7988</issn><issn>1976-3808</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><recordid>eNqNkUtLw0AUhQdRsNT-AHcBN26i80jmsZJafBQUQep6mFdC2jRTZ5JF_71TIyiC4N3cs_jOgXsPAOcIXiEI2XVEGMMyh6jMEcVJHIEJEozmhEN-nDTGNGeC81Mwi3EN0xDMOCkn4OZ2-ZxrFZ3N9NC0tunqzHUu1Pus9cpmRrVmaFXf-C6L-9i7bVb5kFkXmzph8QycVKqNbva1p-Dt_m61eMyfXh6Wi_lTbkrC-lwISwkusHZGi6oqtCkYLBG3qig1w6Ii1HJLiOZOQAoxEVAXFiHDCNMEazIFl2NuFyq5MY30qvnctZebIOevq6WkFDMkvtFd8O-Di73cNtG4tlWd80OUKH2CkZJg_h-U4BIWCCf04he69kPo0s2JogWnMD00UWikTPAxBlfJXWi2KuwlgvLQlRy7kqkreehKwuTBoycmtqtd-JH8p-kDJ36TNg</recordid><startdate>20160301</startdate><enddate>20160301</enddate><creator>Kim, Karam</creator><creator>Yu, Jungho</creator><general>Korean Society of Civil Engineers</general><general>Springer Nature B.V</general><general>대한토목학회</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7QH</scope><scope>7UA</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>AEUYN</scope><scope>AFKRA</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>BHPHI</scope><scope>BKSAR</scope><scope>C1K</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>F1W</scope><scope>FR3</scope><scope>H96</scope><scope>HCIFZ</scope><scope>KR7</scope><scope>L.G</scope><scope>L6V</scope><scope>M7S</scope><scope>PCBAR</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>7SU</scope><scope>7ST</scope><scope>7U6</scope><scope>ACYCR</scope></search><sort><creationdate>20160301</creationdate><title>BIM-based building energy load calculation system for designers</title><author>Kim, Karam ; Yu, Jungho</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c537t-99d63242becb9ff4bc470518da45b729f36d8d33b8e90602390b4d11c737b32b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2016</creationdate><topic>Buildings</topic><topic>Civil Engineering</topic><topic>Computational efficiency</topic><topic>Computing time</topic><topic>Construction Management</topic><topic>Designers</topic><topic>Energy</topic><topic>Engineering</topic><topic>Engineers</topic><topic>Feedback</topic><topic>Geotechnical Engineering & Applied Earth Sciences</topic><topic>Green buildings</topic><topic>Green development</topic><topic>Industrial Pollution Prevention</topic><topic>Load</topic><topic>Manuals</topic><topic>Matching</topic><topic>Mathematical models</topic><topic>토목공학</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kim, Karam</creatorcontrib><creatorcontrib>Yu, Jungho</creatorcontrib><collection>CrossRef</collection><collection>Aqualine</collection><collection>Water Resources Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest One Sustainability</collection><collection>ProQuest Central</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest Natural Science Collection</collection><collection>Earth, Atmospheric & Aquatic Science Collection</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>ASFA: Aquatic Sciences and Fisheries Abstracts</collection><collection>Engineering Research Database</collection><collection>Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources</collection><collection>SciTech Premium Collection (Proquest) (PQ_SDU_P3)</collection><collection>Civil Engineering Abstracts</collection><collection>Aquatic Science & Fisheries Abstracts (ASFA) Professional</collection><collection>ProQuest Engineering Collection</collection><collection>ProQuest Engineering Database</collection><collection>Earth, Atmospheric & Aquatic Science Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering Collection</collection><collection>Environmental Engineering Abstracts</collection><collection>Environment Abstracts</collection><collection>Sustainability Science Abstracts</collection><collection>Korean Citation Index</collection><jtitle>KSCE journal of civil engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Kim, Karam</au><au>Yu, Jungho</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>BIM-based building energy load calculation system for designers</atitle><jtitle>KSCE journal of civil engineering</jtitle><stitle>KSCE J Civ Eng</stitle><date>2016-03-01</date><risdate>2016</risdate><volume>20</volume><issue>2</issue><spage>549</spage><epage>563</epage><pages>549-563</pages><issn>1226-7988</issn><eissn>1976-3808</eissn><abstract>In addition to the global awareness regarding green buildings, there is growing interest in Building Energy Load Calculation (BELC). The BELC process, however, has several potential problems, including the fact that the required data are input manually through subjective engineer choices and, during the BELC process, a designer must wait for feedback from the engineer regarding the BELC results. This paper addresses these problems by proposing a BIM-based building energy load calculation system for designers. To that end, the required data for BELC are divided into four types: general, space, material, and element. According to the required data, input methodologies are categorized as either automatic type-A or manual type-M data. The proposed system for BELC is developed with four key functions: type-A data input, type-M data input, material-property matching, and calculation functions. To validate the proposed system, two designers with more than seven years of practical experience and a BELC engineer using the eQUEST and EnergyPLUS programs applied the model to the current and proposed approaches. The proposed system contributes to increasing the efficiency of the BELC process by facilitating self-check by the designer and by reducing the need for engineering input during the BELC process.</abstract><cop>Seoul</cop><pub>Korean Society of Civil Engineers</pub><doi>10.1007/s12205-015-1625-0</doi><tpages>15</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1226-7988 |
ispartof | KSCE Journal of Civil Engineering, 2016, 20(2), , pp.549-563 |
issn | 1226-7988 1976-3808 |
language | eng |
recordid | cdi_nrf_kci_oai_kci_go_kr_ARTI_662719 |
source | Springer Nature |
subjects | Buildings Civil Engineering Computational efficiency Computing time Construction Management Designers Energy Engineering Engineers Feedback Geotechnical Engineering & Applied Earth Sciences Green buildings Green development Industrial Pollution Prevention Load Manuals Matching Mathematical models 토목공학 |
title | BIM-based building energy load calculation system for designers |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T20%3A54%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_nrf_k&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=BIM-based%20building%20energy%20load%20calculation%20system%20for%20designers&rft.jtitle=KSCE%20journal%20of%20civil%20engineering&rft.au=Kim,%20Karam&rft.date=2016-03-01&rft.volume=20&rft.issue=2&rft.spage=549&rft.epage=563&rft.pages=549-563&rft.issn=1226-7988&rft.eissn=1976-3808&rft_id=info:doi/10.1007/s12205-015-1625-0&rft_dat=%3Cproquest_nrf_k%3E1798735328%3C/proquest_nrf_k%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c537t-99d63242becb9ff4bc470518da45b729f36d8d33b8e90602390b4d11c737b32b3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=1764860783&rft_id=info:pmid/&rfr_iscdi=true |