Selection and application of relay protection for six phase demonstration project

The protection and control requirements needed for a 115 kV line after it was reconfigured to operate as a single-circuit six-phase line as part of a high-phase-order demonstration project are discussed. Addressed are the required modification and/or additions needed for the existing protection and...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on power delivery 1992-10, Vol.7 (4), p.1900-1911
Main Authors: Rebbapragada, R.V., Panke, H., Pierce, H.J., Stewart, J.R., Oppel, L.J.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The protection and control requirements needed for a 115 kV line after it was reconfigured to operate as a single-circuit six-phase line as part of a high-phase-order demonstration project are discussed. Addressed are the required modification and/or additions needed for the existing protection and control equipment. The criteria selected for the protection of the transmission line are described, including the transformers required for six-phase reconfiguration. The commercially available digital protection systems applicable to the protection of the line and their limitations are reviewed. Requirements for protection and control panels, their location for optimal wiring, and facilities to perform tests and measurements are also covered.< >